ML20107A184

From kanterella
Jump to navigation Jump to search
Amend 85 to License DPR-59,revising Tech Specs to Reduce Scram Surveillance Frequency for CRD Sys from 15% Every 8 Wks to 10% Every 16 Wks
ML20107A184
Person / Time
Site: FitzPatrick 
(DPR-059)
Issue date: 10/11/1984
From: Vassallo D
Office of Nuclear Reactor Regulation
To:
Power Authority of the State of New York
Shared Package
ML20107A185 List:
References
DPR-59-A-085 NUDOCS 8411010476
Download: ML20107A184 (4)


Text

-

.98 88cw

-[

of

~

-E*:,s; 7?

UNITED STATES NUCLEAR REGULATORY COMMISSION '

i WASHINGTON D. C. 20555 y a, POWER AUTHORITY OF THE STATE OF NEW' YORK

~

DOCKET NO. 50-333 JAMES A. FITZPATRICK NL! CLEAR POWER PLANT AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.'85 License No. DPR-59 1.

The Nuclear Regulatory Comission (the Comi'ssion) has found that:

A.

The application.for amendment by the Power Authority of the

~

State of New York (the licensee) dated November 18, 1981, as supplemented by letter dated February 4,1982, complies with the standards and requirements of the Atomic Energy Act cf 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter-I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulatioas and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C(2) of Facility Operating License No.

DPR-59 is hereby amended to read as follows:

~

8411010476 841011 PDR ADOCK 05000333

_P PDR

(2) Technical Specifications ThesTechnical. Specifications contained in Appendices A and B, as revised through Amendment No. 85, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMI-SSION

)

-..J' Domenic B. Vassallo, Chief Operating Reactors Branch #2 Division of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance: October 11, 1984 4

e m

b e

.e

-,a n

l M

9

-ATTACHMENT TO LICENSE AMENDMENT NO. 85 FACILITY OPERATING LICENSE NO. DPR-59 DOCKET N0.~50-333 Revise the Technical Specific'ations by removing and inserting'the following page:

Remove Insert 96 96 u;

4 e

D l

JAFNPP g

3,3 (cont'd) 4.3 (cont'd)

2. %e averc.ge of the scram insertion 2.

At 16-week intervals, 10 percent of l

times for the three fastest the operable control rod drives shall operable control rods of all groups be scram timed above 950 psig. Wen-of four control rods in a two-by-two ever such scram time measurements are i

array shall be no greater than:

made, an evaluation shall be made to provide reasonable assurance that control Rod Average Scram proper control rod drive performance l

Notch Position Insertion Time is being maintained.

.i

@ served (Sec.)

46 0.361 3.

All control rods shall be determined 38 0.977 operable once each oparating cycle 24 2.112 by demonstrating the scram discharge 04 3.764 volume drain and vent valves operable when the scram test initiated by placing the mode switch in the SHUTDOWN i

position is performed as required by Table 4.1-1 and by verifying that'the dtmn and vent valves:

i

a. Close in less than 30 seconds after receipt of a signal for control rods to scram, and
b. Open when the scram signal is reset or the scram discharge instrument volume trip is bypassed.

k f

d Amendment No. f, f, 75, 85 96 e#