a OPERATING DATA REPORT DOCKET NO. _50-413 DATE* 10-15-84 CO31PLETED BY J. A. Reavis TELEP110NE 7nd-173-7567 I
OPERATING STATUS Catawba _1-Notes
- Nameplate Rating
- 1. Unit Name:
- 2. Reporting Period: -September 1 - September 30, 1984 (Gross MWe) calculated as
- 3. Licensed Thermal' ower (SIWt):
3411-1450.000 MVA x.90 power P
- 4. Nameplate Rating (Gross SIWE):
1305 factor per,Page lii, N E G-0020.
- 5. Design Electrical Rating (Net SIWE):
1145
- 6..\\taximum Dependable Capacity (Gross StWe):.
1145
- 7. blaximum Dependable Capacity (Net SIWE):
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report.Give Reasons:
None
- 9. Power Level To Which Restricted.If Any (Net.\\lwe):
- 10. Reasons For Restrictions.lf Any:
b This.\\lonth Yr..to Date Cumulative
- 11. Hours in Reporting Period
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdownllours 5
14,11ours Generator On Line
- 15. Unit Reserse Shutdown Hours
- 16. Gross Thermal Energy Generated (>lWil)
.17. Gross Electrical Energy Generated (>lWH)
Not in Commercial Operation IS. Net Electrical Energy Generated (SIWil)
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using SIDC Net)
/
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate,
- 24. Shutdowns Scheduled over Next 6 Stonths(Type.Date,and Duration of Eacht:
- 25. If Shut Down At End Of Report PerioJ. Estimated Date of Startup:
~i
' 26. Units in Test Status IPrior to Corrmercial Operation):
Forecast Achiesed INITIA L CR) TIC \\LITY INITIAL ELECTRIC 11Y C0\\lslERCIAL OPER ATION 19/77)
p 1
- o P.
~
i CATAWBA NUCLEAR STATION Monthly Operating Status Report
.1.
Personnel Exposure For the month of August, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.
2.
The total station liquid release for August has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
The total station gaseous release for August has been compared with the Technical Specifications maximum annual dose commitment
.and was less than 10 percent of this limit.
I I
h
[
t i
)
i
?l 0
1 t
4s
gp.
,\\*q r ~
- 79
.J sf.
-v.
3 6
- }
x CATAWBA NUCLEAR STATION 4
L-3 g
I-Pressurizer. Power. Operated Relief Valve (PORV) and Safety Valve Challenges 3
.n.
v
.;c u
,'e
%s.t; w y. 4_.
xy n
A g.
y
, t.,
4-s,.
TUN _IT DATE
"; VALVE #s(*)
- OF CHAU2NCES _
f.
i s,
e.
s 1.
INC32B*-
' 9 84 1
3 s
a 4
x 7
,4 3
p s,',
+
a,
'{.
.1 N
J, g
N,.
'T.
5 4
4 d
's 4
- S - SAFETY VALVE y
P - PORV
~
+
a k
I q
k t
a f6 h
\\
- sr o
B s
i, 9
P u -
r 4
v 1.,
1
-k 4
'("
o 4
f
\\g
,i k
- v.,
r s.
.g*
(%
v k '..
'(
) e;.
i 3-g t
)
s
'.i' e
.,, _ 4, i Y-L y
a
[ . f pg' k3
\\,
'3 7
s t
~
s;. '
i It 4'
4 1
D s
- %A I,
e,
.g.
4)
.9 s
\\ N~...
J 4,4,,
- u.
s&
- 3-t k
.' U--
~[ A.
-r-
-~+
4 I l'
~*~I-'*
- *~ ~
I DUKE Powna GOMPANY P.O. box 33189 CHARLOTTE, N.C. 28242 HALH. TUCKER Tzteruoxx W905 PatarpmfT (yg gygg
" " " ^ * " " " "
October 15, 1984 Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attention: Document Control Desk Re: Catawba Nuclear Station Dockat No.
50-413
Dear. Sir:
Please find attached information concerning the performance and operating status of the Catawba Nuclear Station for the month of September 1984.
Very truly yours, Hal B. Tucker JAR:scs Attachments cc:
Mr. J. P. O'Reilly, Regional Administrator American Nuclear Insurers U. S. Nuclear Regulatory Commission c/o Dottie Sherman, ANI Library Region II The Exchange, Suite 245 101 Marietta Street, Suite 2900 270 Farmington Avenue Atlanta. Georgia 30323 Farmington, Connecticut 06032 Mr. Phil Ross Robert Guild, Esq.
U. S. Nuclear Regulatory Commission Attorney-At-Law MNBB-5715 P. O. Box 12097 Washington, D. C.
20555 Charleston, South Carolina 29412 INP0 Records Center Palmetto Alliance Suite 1500 2135 Devine Street 1100 Circle 75 Parkway Columbia, South Carolina 29205 Atlanta, Georgia 30339 Ms. Judy Dovers NRC Resident Inspector Nuclear Assurance Corporation Catawba Nuclear Station 5720 Peachtree Parkway gJk Norcross, Georgia 30092
\\
..