ML20106E321

From kanterella
Jump to navigation Jump to search
Forwards Rev 7 to Physical Security Plan.Rev Restates Commitment to Test & Calibr Screening Devices.Rev Withheld (Ref 10CFR73.21)
ML20106E321
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/19/1984
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Schuster M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
NUDOCS 8410290164
Download: ML20106E321 (2)


Text

WASHINGTON FUBUC PO?iER SU s

SAFEGUARDS INFORMATION (10CfR7 e

LCCKED STORAGE REQUIRED ~

7n Washington Public Power Supply System P. Bg6 gGeorgeWashingtonWay

Richland, h

to 9 2 (509)372-5000 October 19, 1984 um, ' ~

Mr. M. D. Schuster, Acting Chief Safeguards & Emergency Preparedness U. S. Nuclear Regulatory Comission Region Y 1450 Maria Lane, Suite 210 Walnut Creek, California 94596

Subject:

WASHINGTON PUBLIC POWER SUPPLY SYSTEM WNP-2 PHYSICAL SECURITY PLAN, REVISION 7 Pursuant to your letter of September 28, 1984 referencing two unacceptable portions of Revision 6 of the hNP-2 Physical Security Plan; the justification for deleting a security measure and the re-implementation of the original time commitment for calibration of security related screening devices are described in the enclosure to this letter.

Revision 7 to the Physical Security Plan, attached, restates our commitment to test and calibrate screening devices. Text changes have been noted by a line on the right hand margin of the document.

The enclosures contain Safeguards Information concerning security measures for the physical protection of Supply System facilities in which special nuclear material is used. This infonnation is to be protected in accordance with 10CFR 73.21.

Should you have any questions concerning this submittal, please do not hesitate to contact me.

W G. C. Sorensen, Manager Regulatory Programs

Enclosures:

Supply System Responses to NRC Coments (5 copies)

Revision 7, WNP-2 Physical Security Plan (5 copies) t CC:

A. Toth, Nuclear Regulatory Comission (w/o attachments)

N. S. Reynolds, B, L, C, P and R (w/o attachments)

W. Chin, Bonneville Power Administration (w/o attachments)

R. Auluck, Nuclear Regulatory Comission (w/o attachments)

L. Norderhaug, Nuclear Regulatory Comission (w/o attchments)

A. Schwencer, Nuclear Regulatory Commission (with attachments)

THIS PAGE UNCONTi.0LLED WHEN 8410290164 841019 IEPARATED FROM ENCLOSURES.

[

PDR ADOCK 05000397 F

PDR 0'

WASH!NGTON PUBUC F0 VIER SUPPLY SYSTEM i

s SAFEGUARDS INFORMATION (10CFR73.21)

LOCKED ST09 AGE RimiREO

F WNP-2 Physical Security Plan Revision 7 STATE OF WASHINGTON

)

Subject:

)

County of Benton

)

I, G. C. SORENSEN, being duly sworn, subscribe to and say that I am the Manager, Regulatory Programs, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information and belief the statements made in it are true. The foregoing contains safeguards information which is to be withheld from public disclosure and protected in accordance with 10CFR73.21.

DATE

/ T O T 586/_,1984 m

/ G. C. Sorepten, Manager Regulatory Programs On this day personally appeared before me G. C. SORENSEN to me known to be the individual who executed the foregoing instrument and acknowledge that he signed the same as his free act and deed for the uses and purposes therein mentioned.

GIVEN under my hand and seal this ]k day of 1/

, 1984.

9hb6 m) E b N6tary Puflic in' and for the' State of Washin ton Residing at

,M V

l

/