Forwards Response to Rc Young Re IE Bulletin 84-03, Refueling Cavity Water Seal. Refueling Water Cavity Water Seal Not Subj to Gross Failure Because Design Has No Active Components
ML20106D642
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 10/19/1984
From: George Alexander
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
9360N, IEB-84-03, IEB-84-3, NUDOCS 8410260091
Download: ML20106D642 (4)


Text

,

~s '

Commonwealth EfZson one First Nction:t Plaza. Chicago, Illinois Addr:ss R pty to. Post Off:ce Box 767 Chicago.1:hnois 60690 ,

October 19, 1984 Mr. James G. Keppler Regional Administrator U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen.Ellyn, IL 60137 Sub ject: Quad Cities Station Units 1 and 2 Response to IE Bulletin 84-03 NRC Docket Nos. 50-254/265 Reference (a): IE Bulletin 84 R. C. DeYoung letter to All OLs and cps dated August 24, 1984

Dear Mr. Keppler:

Reference (a) requested us to evaluate the potential for and consequences of a refueling cavity water seal failure prior to beginning refueling. Attached is the response for Quad Cities Station.

To the best of my knowledge and belief the statements contained in the Attachment are true and correct. In some respects these statements are not based on my personal knowledge but upon information furnished by other Commonwealth Edison employees, contractor employees and consultants. Such information has been reviewed in accordance with Company practice and I believe it to be reliable.

Please address any questions that you or your staff may have concerning our response to this office.

l 8410260091 e43o

{DRADOCK 050002 4 00T C ? 1T '

PDR TE// NE

v a.

One (1) signed original with Attachment is being sent

..directly to'the USNRC Document Control Desk in Washington, DC for

. reproduction.and distribution as requested in the Bulletin.

Respectfully, G. L. Alexander Nuclear Licensing Administrator cc: US NRC, Document Control Desk Washington, DC 20555 RIII Inspector - D SUBSCRIBED and SWORN to beforp

,of Uc M M t vme -this <4h2

, 1983 day

.ws L 's A - JG)

Notary Public

9360N

--_-_--.-_____ _m___m.__---__

y 4-z ,,_

e e- 4 ATTACHMENT-

. Response to IE Bulletin 84-03 Refueling Cavity Water Seal-Quad Cities Station Units 1 and 2 f

r

.A A

a i

L t

i., e.

t The refueling cavity water seal at Quad Cities is not subject to gross failure-because the Quad Cities design has no active components. There is no pneumatic seal. Water from a leak in the seal is collected. The system alarms in the control room if excessive leakage flow is detected. Also present in the control room are alarms for low skimmer surge tank level and low fuel pool level.

The system was examined and an estimate was obtained for the maximum leakage rate assuming a complete break of the lines carrying the leakage flow. The minimum time to drain the entire cavity and fuel pool to the level of the break is 3.36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. After this drains down, there still would be three feet of water above the fuel in the spent fuel pool. Any fuel in the reactor vessel would be covered by approximately 28 feet of water. This would prevent any clad damage and keep radiation levels in an acceptable range.

Considering that the transit time from the fuel pool to the reactor core is approximately two minutes and the drain down time is greater that several hours, sufficient time is available for corrective action for fuel.in transfer during such an event.

The makeup capacity to re-flood the cavity depends upon the systems available. . Technical Specificaions normally require three of four Residual Heat Removal (RHR) pumps each with a capacity of 3500 gpm to be available. In addition, one of two Core Spray pumps with a capacity of 4500 gpm each would be required to be operable.

The condensate system, if available, is capable of delivering 10 X 106 lbs/hr of water to the vessel. If absolutely necessary, fire hoses from the diesel fire pumps could put water in the cavity or fuel pool. A make-up capacity of 400 gpm could reasnably be expected from the diesel fire system.

Quad Cities Abnormal Procedure, QOA 1900-1 " Loss of Water Level in the Spent Fuel Storage Pool or Reactor Cavity and Level Decreasing" was revised as a result of this Bulletin. Some additional symptoms were added, along with actions for fuel in transfer. Also, additional methods of getting water into the cavity / fuel pool are recommended.