F AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-293 UNIT Pilarim 1 DATE Oct. 10. 1984 COMPLETED BY P. Hamilton TELEPHONE (617)746-7900 MONTH September 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE CAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0.

17 0.

2 0.

18 0.

-3 0.

19 0.

4 0.

20 0.

- 5 0.

21 0.

6 0.

22 0.

7 0.

23' O.

- 8 0.

24 0.

9 0.

25 0.

10 0.

26 0.

11 0.

27 0.

12 0.

28 0.

13 0.

29 0.

14 0.

30 0.

15 0.

31 N/A

-16 0.

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt, hDR DO O

e

o-OPERATING DATA REPORT DOCKET NO.

50-293 ___

DATE Oct. 10. 1911 COMPLETED BY P. Hamiltor1__

TELEPHONE (617)746-7900 OPERATING STATUS 1.

Unit Name Pilaris 1 Notes

2. ' Reporting Period SeDtember 1984 3.

Licensed Thernal Power (MWt) 1998 4.

Nameplate Rating (Gross MWe) 678

.5.

Design. Electrical Rating (Net MWe) 655 6.

Maximum Dependable Capacity (Gross MWe) 690

~

7.

Maximum Dependable Capacity (Net MWe) 670 8..

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

None 9.

Power' Level To Which Restricted, If Any (Net MWe)

None

10. Reasons For Restrictions, If Any N/A i

This Month Yr-to-Date Cumulative

11. Hours-In Reporting Period 720.0 6575.0 103535.0
12. Number Of Hours Reactor Was Critical 0.0 0.0 69746.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0 4

c.

14. Hours Generator On-Line 0.0 0.0 67534.0

-15. Unit Reserve Shutdown Hours 0.0 0.0 0.0

16. Gross Thermal Energy Generated (MWH) 0.0 0.0 116932632.0 l
17. Gross Electrical Energy Generated (MWH) 0.0 0.0 39228314.0 l

'18. Net Electrical Energy Generated (MWH) 0.0 0.0 37693409.0

19. Unit Service Factor

-0.0 0.0 65.2

20. Unit Availability Factor 0.0 0.0 65.2 r
21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 54.3

' 22. Unit Capacity Factor.(Using DER Net) 0.0 0.0 55.6

23. Unit Forced Outage Rate ~

0.0 0.0 9.2 24 Shutdowns Scheduled Over Next 6 Months (Type Date, and Duration of Each):

Shutdown for refuelina and recirculation DiDe reDlacement - Outaae commenced on December 10. 1983.

25. If Shut Down At End Of Report Period, Estimated Date of Startup Nov. 1984

'26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved

~

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION i

L (9/77)

.J UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-293 UNIT NAME Pilerim 1 DATE Oct. 10, 1984 COMPLETED BY P. Hamilton l

TELEPHONE (617) 746-7900 REPORT MONTH September 1984 METHOD OF LICENSE CAUSE & CORRECTIVE l

DURATION SHUTTING EVENT SYSTEM CONPONENT ACTION TO NO.

DATE TYPEI (HOURS)

REASON 2 DOWN REACTOR 3 REPORT'#

CODE 4 CODES PREVENT RECURRENCE 16 83/12/10 5

720.0 C

1 N/A N/A N/A N/A'- Shutdown for refueling and recirculation pipe replacement.

I l

l l

I I

1 2

2 3

4&5 F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

& License Examination 9-Other (LER) File (NUREG-1022)

REFUELING INFORMATION The following refueling information is included in the Monthly Report as requested in an NRC letter to BEco, dated January 18, 1978:

For your convenience, the information supplied has been enumerated so that each number corresponds to equivalent notation utilized in the request.

1.

The name of this facility is Pilgrim Nuclear Power Station, Docket Number 50-293.

2.

Scheduled date for next Refueling Shutdown: March 1986 3.

Scheduled date for restart following r. fueling: November 1984 4.

5.

Due to their similarity, requests 4, 5, & 6 are responded to collectively:

6.

The fuel, which had been loaded during the 1981 scheduled refueling outage, is of the same P8x8R design, as loaded the previous outage consisting of 112 P80RB282 assemblies and 60 P8DRB265 assemblies.

7.

(a) There are fuel assemblies in the core.

(b) There are 1,708 fuel cssemblies in the spent fuel pool.

8.

(a) The station is. presently licensed to store 2320 spent fuel assemblies. The actual spent fuel storage capacity is 1770 fuel assemblies at present.

-(b) The planned spent fuel storage capacity is 2320 fuel assemblies.

'9.

With present spent fuel in storage, the spent fuel pool now has the capacity to accommodate an additional 62 fuel assemblies.

o I

BOSTON EDISON COMPANY' PILGRIM NUCLEAR POWER STATION DOCKET NO. 50-293 Operational Summary for September 1984 The Unit has been shut down all month for Refuel Outage #6 and recirculation pipe replacement.

All outage work continued.

Safety Relief Valve Challenges Month of September 1984 Requirement: NUREG-0737 T.A.P.

II.K.3.3 Reason: - No safety / relief valve challenges occurred during the month of September 1984. Refuel Outage #6 is in progress.

. + - -

, +.

.e


a.

.-,---e--

-,,,--,c-mr-

--g

-,w.-

,,y.f-yar y,--

.---v----w.,-

,m

~

Illl1lliIllllI 7

4 8

d 9

d e

1

/e u

R 5u s

r E

6s

- s e

L 0s i

b i

0 m

D 3

0e e

E 8e

- b t

T b

0 p

A o

1 o e

I to 0t S

C t

O e

4 e h

S t0 8t t

S a-a n

A dL Rd o

p3 E p M

U0 LU NO 8

n I '

n4 o

T o-i CTE i3 t

ANC dt8 a

EN ea g

EVE tcC i

VER eiD t

IRR lfP rs TPU pi ee C

C mdr d v EOE ooe nn RTR cmp UI R

E O

N C

C O

NA I

T N

E s

AT T

l S

N ra I

i n r

A ar f e R

E M

pe on W

E et i

D C

Rn ta O

P E

N I

nt T

A d

dee R

A N

ee emR L

E tv t e A

E T

el ect E

L R

N l a l ae I

pV pll C

Y A

m mpl U

T M

of oeo N

E Co CRC F

M A

I R

S G

R r

a L

O ea g

I P

J l e i

A E

bW t

M S

a rs U

bt een A

oa dvo C

re nni PS UIt J"

N s

O p

n I

p o

T A

i C

t N

d a

U e

c F

lT di L

iR l d A

aL en M

FL WI r

T e

N s

tn ei E

'V l ae NO I

ltb P

S oeu M

M CRT O

C M

E m

T na S

ie D

Y at R

S MS C

{lIl!ll1fll I

ll

UCSTON EoisDN CDMPANY 800 BOYLsTON STREET BOSTON, massachusetts 02199 WILLIAM D. H ARRIN GTO N crusom viss passensur NUSLsAN October 10, 1984 BECo Ltr. #84-173 Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Attn: Document Control Desk License No. DPR-35 Docket No. 50-293

Subject:

September 1984 Monthly Report

Dear Sir:

In accordance with PNPS Technical Specification 6.9. A.2, a copy of the Operational Status Summary for Pilgrim Nuclear Power Station is attached for your information and planning.

Respectfully submitted, MN W. D. Harrington

caw Attachment i

cc: Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555 i.

'/I