Forwards Revised Response to NRC Re Violations Noted in Insp Repts 50-413/84-33 & 50-414/84-19.Corrective actions:ICS-A-20 Revised Stating That Control Air Tubing safety-related
ML20106B930
Person / Time
Site: Catawba  
Issue date: 06/13/1984
From: Tucker H
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20106B902 List:
References
NUDOCS 8410230578
Download: ML20106B930 (2)


Text

g m

. }

.~

DUKE POWER GOMPANY P.O. HOx 33180.

CHAMLOTTE, N.C. 28242 HAL H. TUCKER run.mpsows

~'

2 "l~~-

June 13,1984

',,fg pg,.

Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900

' Atlanta, Georgia 30323 Re: RII:PKV/PHS/AI 50-413/84-33 50-414/84-19

Dear Mr. O'Reilly:

Please find attached a revision to the response to Violation No. 413/84-33-01; 414/84-19-01 concerning corrective steps to avoid further violations. This supplemental information addresses the corrective actions scheduled for Unit 2.

Full compliance has been met for Unit 1.

Very truly yours, hfhhLd Hal 8. Tucker LTP/php Attachment cc: NRC Resident Inspector Catawba Nuclear Station Mr. Robert Guild, Esq.

Attorney-at-Law P. O. Box 12097 Charleston, South Carolina 29412 Palmetto Alliance 21351 Devine Street Columbia, South Carolina 29205 Mr. Jesse L. Riley Carolina Environmental Study Group 854 Henley Place Charlotte, North Carolina 28207 8410230578 840913 DR ADOCK 05000

(-

(.

. ~.

Catawba Nuclear Station

Violation Response 413/84-33-01;'414/84-19-01

. Revised. Response

^

' June :13,' 1984 "

y Corrective Steps'to Avoid Further Vio'1ations (Revised):

-ICS-A 20 will be revised to state.that the control ~ air: tubing between nuclear-Jsafety related' solenoid valves and valve-actuators for active nuclear safety related pneumatic valves is nuclear safety related and that the addition of

-components not shown on the installation detail is prohibited. The control air tubing shall be inspected for compliance to this criteria and to assure that'no physical damage has occurred to-the tubing and components between the a

solenoid valve and actuator.

i All design documents have been revised to cover the requirements for Unit 2 work on this item.. Based.on the_ timing of the implementation of these revisions,

~

construction work and QC/QA inspections will be accomplished in accordance with-current Unit 2 schedules.

The required QA/QC inspections for Unit 2 have not been completed to date. As j

~

discussed above, 2RN291 will be re-tubed and inspected in accordance with the revised requirements.

Date When Full ~ Compliance Will Be Achieved (Revised):

- All-action required to resolve this item was completed by June 8,1984 for Unit 1.

i All action required for Unit 2 will be completed by Unit 2 Fuel Load.

l l