ML20106A626

From kanterella
Jump to navigation Jump to search
Forwards Revised FSAR Pages,Providing More Detailed Descriptions of Design Bases,Including Conformance to IEEE 420-1973 Re Use of Cable Splices within Control Switchboard
ML20106A626
Person / Time
Site: Byron, Braidwood, 05000000
Issue date: 02/06/1985
From: Tramm T
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
9736N, NUDOCS 8502110305
Download: ML20106A626 (6)


Text

-

.-f

)' One First Nationml PITza. Chic'go, llhnois

/

\\

O' Addrtss Reply to: Pos' Offics Box 767

\\

Chicago. Illinois 60690 February 6, 1985

~Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Byron Generating Station Units 1 and 2 Braidwood Generating Station Units 1 and 2 FSAR Changes NRC Docket Nos. 50-454/455 and 50-456/457

Dear Mr. Denton:

This letter provides advance copies of revised pages for the Byron /Braidwood FSAR. These changes are being made to provide more explicit

. descriptions of the design bases for these plants.

Enclosed is a revised page 8.1-14.

It now includes a discussion of conformance to IEEE 420-1973 with regard to-the allowed use of cable splices within control switchboards. This change is being made to resolve a concern identified during a recent I&E inspection at Braidwood Station.

Also enclosed are revised pages E.20-1, E.20-la, and E.82-1 for

' Appendix E of the Byron /Braidwood FSAR. They now specify that the liquid source term used for shielding evaluation and environmental qualification of Byron and Braidwcad does not include noble gases. Fission solids are the dominant contributor for long term doses so this does not significantly alter the radiological impact of postulated accidents.

Also included is a revised page E.21-3.

It specifies that backup sampling is not provided for hydrogen because of the large volume required.

These changes will be incorporated into the FSAR at the earliest opportunity.

Please direct questions regarding these matters to this office.

One signed original and fifteen copies of this letter are provided for tEC review.

Very truly yours, f

e

n. T. R. Tramm t4Jclear Licensing Administrator 1m

\\

. cc: Byron Resident' Inspector _

(gt)h

.Braidwood Resident Inspector v

g DRk b

0 o

L P

PDR

r B/B-EtAI.

AMtNDPJ N! 38 MAY 1962

- The physical identification of safety-related equipment is discussed in subsection 8.3.1.3.

8.1.15 Shared Emergency and Shutdchn Electric systems for Multi-Unit Nuclear Power Plants The criteria followed in designing the two unit station is that each unit shall operate independently of the other and malf unc-tion of equipment or operator error in one unit will not initiate a malf unction or error in the other unit nor af fect the continued operation of the other unit.

8.1.16 Cualification of Class 1E Equiprent for Nuclear Power Plants With regard to environmental qualification of instrumentation, control, and -electrical equipment important to safety, the Applicant complies with the intent of IEEE 323-1974.

Additional information is provided in Section 3.11.

8.1.17 Availability of Electric Power Sources i

During ' abnormal electric power source configurations, pla nt operations are limited as described in Subsection 16.3/4. 8.

8.1.18 Conformance to IEEE 338-1975 (Periodic Testing of Nuclear Power Generating Station Class 1E Power and Protection System)

Conformance to this standard is addressed in Subsection 8.3.1.2 and 7.1.2.19.

8.1.19 Conformance to~IEEE 344-1971 (Recommended Practices enr Seismic Qualification of Class 1E Equipment for Nuclear Power Generatina Station)

Conformance to this Standard is addressed in Section 3.10.

8.1.20 Conformance to IEEE 387-1972 (Criteria for Diesel Generator Units Applied as Standby Power Supplies for Nuclear Power Generating St at ions)

Vendor qualification tests, preoperational testing, and periodic testing during nornal plant operation conform to those procedures described in this standard, except as noted in Subsections 8.3.1.2, 16.3/4.8, and Chapter 14.0.

8.1.21-Conformance to IEEE 420-1973 (IEEE Trial-Use Guide

for Class lE Control Switchboards for Nuclear Power Generating Stations)

Class lE control switchboards conform to this standard with the following clarification to Paragraph 4.6.1.2:

Splices'may be used on individual conductors of field cables within switchboards

'for the purpose of extending individual conductors to their point of termination.

8.1-14'

t._

^

a+

^ ~

-B/B-FSAR LE.20 -PLANT SHIELDING (II.B.2)

POSITION:

A radiation-and shiciding design review was conducted for

-Byron /Braidwood Stations-(B/B) using.the guidance provided in NUREG-0737.

Reference 9 describes in detail the source terms used for radiation qualification.

Inside the containment, i

-the' source term is based on the release of1100% of'the noble gases.and.50% of.the halogens to the containment atmosphere.

Systems containing liquid sources are analyzed using a source term consisting.of 50% of the core inventory of halogens b

and it of the core inventory of fission solids.

Note that the liquid source term-does not contain noble gases as specified in this clarification.

This is not done 1because it is. inconsistent with a severe accident, and since the fission solids are the dominant nuclide group for long term' doses (one year period), there is no effect on the evaluation-of the radiological impact.

Two accident scenarios were considered:

a..

Line Break Accident - a loss-of-coolant accident cinitiated by a major break in a primary coolant pipe; and b._ No Line Break Accident - an accident during which allEactivity released.from the fuel remains in the primary coolant.

LThe postaccident radiation environment was determined by, (1) analyzing each system' operating following an accident to

, establish pathways for~ fission-products out of containment;

(2) investigating' process streams in the auxiliary building to' identify contaminated equipment and associated activity levels;1(3)_ calculating'the radiation field due to each
sourcg w(Ref.ith computer codes ISOSHLD (Ref. 3), QAD (Ref. 4),

5); a n'd, (4) superimposing.the effects.of

and G
all sourcesito obtain the; maximum expected dose rate throughout' a

the plant.. The radiation environment-was evaluated 1. hour,

^

1 day,_and!1 week following the reactor shutdown.that precedes

. fuel failure.

The"potentially contaminated systems considered in identifying

postaccident' radiation sources included (1) ' the emergency
core cooling system, which consists of.all or parts of the

= safety injection, residual heat removal, and chemical and cvolume controlisystems;1(2) -the containment spray and _ hydrogen-(recombinerisystems, which assist in maintaining-containment'

integrity;- (3) the_ control room, technical support center, E.20-1 4

=4 3

,4, p

1'

B/B-FSAR and auxiliary building HVAC systems, portions of which are designed to remove airborne fission products; (4) the high radiation sampling system; (5) those parts of-the chemical and volume control and the boron recycle systems associated with charging, letdown, and seal water; (6) the shutdown 1

cooling portion of'the residual heat removal (RHR) system; and, (7) those parts of the gaseous waste processing system and the' liquid radwaste system which would normally operate in conjunction with the other systems under. consideration.

The large amount of equipment in the auxiliary building operating following an accident produces elevated dose rates in many areas.

However, since no operator actions other 4

4 r

J 4

0

+

l-E.20-la

. j- -

gi..

B/B-FSAR d.

a special cart equipped with a shielding cask to transport the radioactive sample to its destination;

and, e.

a ventilation system drawing air out of the sampling panels and discharging into a remote HVAC train.

Due to the high dose associated with an alternate means of sampling for chlorides, no backup sampling capability is.in place for such a sample.

AIR SAMPLING SUBSYSTEM The containment air sampling panel is capable of sampling the primary containment atmosphere.

The sample is drawn l

from the containment through a dedicated penetration.

Once the interfacing valves are arranged and the sampling programmer is inititiated, the containment air sampling panel utilizes automatically sequenced sampling to trap the designated sample in a shielded cart.. The air sample will then be

' analyzed onsite.

Excessive exposure to the operator is

-limited by:

steel shielding in the containment air sampling a.

panel; b.

concrete shielding above, below, and around thezsides of the panel to prevent radiation from scattering around the steel shielding:

c.

automatic sampling; d.

special carts each equipped.with a shielding cask to transport the1 radioactive sample to its destination; and, a ventflation system drawing air out of the e.

sampling panels and discharging into a remote HVAC. train.-

Due to the large volume required for a hydrogen sample, no backup sampling capability is in place for such a sample.

SAMPLING PROGRAM' FREQUENCY

' Actual frequency of sampling shall be determined by station management, however, as a minimum the first sample can be taken within:1 hour'from the time a decision is made to take a sample, continuing'with at least one sample per day for the next-7 days'and at least:one sample per week thereafter.

The time interval between taking a sample and receipt by-

-plant management of the results of the. analysis is estimated to be.less than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

,1 -

.g,..

-E.21-3.

./

.w;

.;'~

B/B-FSAR f

E.82 LREFERENCES

'l.'. Letter from B. J. Youngblood (NRC) to J.S. Abel (Commonwealth Edison) dated June 11, 1981, regarding NUREG-0737 item

-I.C.1.

l2. ' Letter from D. G. Eisenhut (NRC) to R. W. Jurgensen (Commonwealth Edison) dated May 28, 1981.

3._

R.JL. Engel, J. Greenborg,'<and M. M. Hendrickson, "ISOSHLD

.A Computer Codesfor General-Purpose Isotope' Shielding

' Analysis,"~BNWL-236', Pacific Northwest Laboratory, Richland, Washington, June 1966;> Supplement 1, March 1967r Supplement 2,

' April 1969.

i.

4. [R..E. Malenfant, "QAD -- A: Series of Point-Kernel General-
Purpose Shielding Programs," LA-3573, Los Alamos Scientific

_ Laboratory,-April'5, 1967.

5.

R.:E. Malenfant,'"G

-- A General-Purpose Gamma-hay Scattering.

Program," LA-5176, Los Alamos Scientific Laboratory,

, June-1973.

6.

' Letter from R. C. Youngdahl (Consumers 1 Power) to H..R.

Denton-L(NRC) dated July 1, 1981.

7.: Letter from R. C; Youngdahl:(Consumers Power) to D. G. Eisenhut

- (NRC) dated December 15, 1980.

8. - Letter from D. F.:Ross, Jr. (NRC)- to.all pending operating -

-license: applicants of nuclear steamisupply systems designed

.by~ Westinghouse and Combustion. Engineering, dated March:10, 1980.

- 9.. " Byron Station Units.l and-2, Braidwood Station Units 1 and.2, Environmental-Qualification of Electrical Equipment,

NRC Docket-Nos...50-454, 50-455, 50-456,-50-157," letter.

from T.

R.:Tramm,. Commonwealth Edison Compdn'y to Harold'R.' Denton,-Director, Office of Nuclear Reactor.

' Regulation, USNRC,ydated fune 17,1 1982, with attachments.:

I i

_E.82-1 tl f f

9

,'f [

I;#dI,

'