Interim Deficiency Rept DER 84-28 Re Diesel Generator Fuel Lines.Initially Reported on 840511.Final Rept Will Be Transmitted by 850215
ML20102A550
Person / Time
Site: Palo Verde 
Issue date: 01/24/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-31791-TDS, DER-84-28, NUDOCS 8502080442
Download: ML20102A550 (2)


Text

__

, z.

.g.a Arizona Nuclear Power Project

'i30 g.,,g

'J 5,

P.O. BOX 52034 e PHOENIX, ARIZONA 85072-2034 4EGir;:,,,

January 24, 1985'"

ANPP-31791-TDS/TRB U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention:

Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Projects

Subject:

Time Extension For Report - DER 84-28 A 50.55(e) Potentially Reportable Deficiency Relating To Diesel Cenerator Fuel Lines In Unit 3 File: 85-019-026; D.4.33.2

-References (A) Telephone conversation between P. Narbut. and T. Bradish

. on May 11, 1984.

(B) ANPP-29696, dated June 7, 1984, (Interim Report)

(C) ANPP-30447, dated September 6, 1984, (Tima Extension)

(D) ANPP-30870, dated October 17, 1984, (Time Extension)

.(E) ANPP-31524, dated December 18, 1984, (Interim Report)

Dear Sir:

'The NRC was notified of a potentially reportable deficiency in Reference (A),

. Interim Reports were transmitted by Reference (B) and (E) and Time Extensions

.were requested.by Reference (C) and (D).

In Reference (E), it was estimated that a Final Report would be available by January 25, 1985.

Bechtel has transmitted a Final Report to the ANPP for review.

It is expected 4

the. review will'be. complete and a Final Report transmitted to the NRC by February 15, 1985.

Very trul your,

~

~

.E M.

ALLL E. E. Van Brunt, Jr.

8502000442 850124 APS Vice President, PDR"ADOCK 05000530 Nuclear Production S

PDR ANPP Project Director EEVB/TRB/p1k Attachment t

cc See Page Two llI EEW

l';. :, +

Pdg2 Two ces.

-Richard DeYoung, Director

. Office of Inspection and Enforcement U.:S. Nuclear Regulatory Commission

Washington, D. C.

. 20555 T. G._ Woods, Jr.

D.

B. Karner W. E. Ide D. B. Fasnacht At C. Rogers L. ASouza r-D. E. Fowler

.T. D. Shriver C. N. Russo B. S. Kaplan J. R. Bynum J. M. Allen D.'Canady_

A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson

- R. W. Welcher H. D. Foster D. R. Hawkinson

.R.:P. Zimmerman M. L. Clyde M. Matt T. J.' Bloom Records Center

-Institute of Nuclear Power Operations

$1100 Circle;75 Parkway,l Suite 1500 Atlanta, CA 30339 i

2 4

-.