ML20101T632
| ML20101T632 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 12/04/1984 |
| From: | Tucker H DUKE POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML20101T627 | List: |
| References | |
| NUDOCS 8502060270 | |
| Download: ML20101T632 (2) | |
Text
7 j
' $ ~'" %...
.:t.
g-DUKE RO Eh)[ONIWNY*
v.o. nux'assao;Eopg(p CHARLOTTE, N.C. 28242 HALB. TUCKER TELEPHONE c.
nc (704) 373-4531 vmaemenment n
LIlesOeqq$,.1
.mu..-o.
Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323
Subject:
Oconee Nuclear Station IE Inspection Report Nos. 50-269/84-26 50-270/84-25 50-287/84-28
Dear Sir:
In response to your letter dated November 9, 1984 which transmitted the subject Inspection Report, the attached response to the cited item of non-compliance is provided. I declare under penalty of perjury that the statements set forth herein are true and correct to the best of my knowledge on December 4, 1984.
Very truly yours, f std.
</
Hal B. Tucker SGG:slb Attachment cc:
Mr. J. C. Bryant NRC Resident Inspector Oconee Nuclear Station 8502060270 850110 gDRADOCK 05000269 PDR
- s,.
c
. e' h $
9
-VIOLATION-
-Technical Specification 6.4.1 states that'the station shall be operated and-maintained in accordance with approved procedures. QA Procedure QCK-1 requires that any personnel discovering a nonconforming item shall promptly initiate a nonconforming item report _(NCIR) and that production personnel shall initiate.NCIR's :Ln accordance with Station Directives.
- Contrary to the above. requirements, although licensee personnel determined Lon or about September 5, 1984,:that a Cuno filter in the low pressure service water supply line to.high. pressure injection pump coolers had been
. installed backwards, an NCIR was not written until September 24, 1984.
Also, neither Station Directives nor the general employee training program address NCIR's.
'This is a Severity Level IV violation (Supplement I).
RESPONSE
- 1) Admission or denial of the' alleged violation:
This violation is correct as stated.
2)~ Reasons for.the violation:
This violation resulted from an administrative deficiency.; The Station Directive describing the processing of NCIR's-did not include.the prevision that any person could initiate a NCIR. The directive referred-to NCIR's being issued by the QA Group, thereby inferring that only the QA Group was responsible for the initiation of a NCIR. This ambiguity led to the delay in the initiation of:the NCIR.'
- 3) Corrective actions taken and results:
The Station Directive-describing the processing of NCIR's has been deleted and replaced by. a section in the Compliance Manual.- This section includes the requirement that NCIR's may be. initiated by any station personnel discovering items which do not conform with specifi-cations, codes, design drawings, or other QA requirements.
In addition the Station' Directive concerning Reporting has been revised.
to include the requirements that any personnel' discovering-a' non- -
conforming item, shall promptly initiate a'NCIR.
'4)
Corrective actions.to be taken to avoid further' violations:-
I
~
None 4
1
- 5) Date when full compliance will-be achieved:
}'
The revisions to Station Directives ~noted'in.the corrective action described above were offective December 1, 1984.
i s
. _., _. _