Text
-_
~
Omaha Public Power District 1623 Harney Omaha. Nebraska 68102 402/536-4000 February 1, 1985 LIC-85-028 Mr. Darrell G. Eisenhut, Director Office of Nuclear Reactor Regulation Division of Licensing U. S. Nuclear Regulatory Commission Washington, DC 20555
Reference:
Docket flo. 50-285
Dear Mr. Eisenhut:
Certification of Compliance to 10 CFR 50.49, Environmental Qualification of Electric Equipment Important to Safety for fluclear Power Plants (Generic Letter 84-24)
On January 11, 1985, the Omaha Public Power District received by telecopy from our NRC Project Manager, Mr. E. G. Tourigny, your Generic Letter 84-24 dated December 27, 1984.
This letter requests, pursuant to 10 CFR 50.54(f), specific information regarding the environmental qualification of safety-related electri-cal equipment at the Fort Calhoun Station.
In the attachment to this letter, please find, under oath or affirmation, the requested information.
Sincerely, R. L. Andrews Division Manager Nuclear Production RLA/DJM/dao Attachment cc:
LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, N.W.
Washington, DC 20036 Mr. E. G. Tourigny, NRC Project Manager Mr. L. A. Yandell, NRC Senior Resident Inspector PDR j, jf, w ""'
I
- "v m t u o """""""
.s s,u
-4 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMISSION
- In the Matter of Omaha Public Power District
)
Docket No. 50-285
- (Fort Calhoun Station,
)
Unit No. 1)
)
AFFIDAVIT R. L. Andrews, being duly sworn, hereby deposes and says that he is Division Manager - Nuclear Production of the Omaha Public Power District; that he is duly authorized to sign and file with the Nuclear Regulatory Commission the attached response to Generic Letter 84-24 dated February 1,1985; that he is familiar with the content thereof; and that the matters set forth therein are true and correct to the best of his knowledge, information and belief.
.?!
R. L. Andrews Division Manager Nuclear Production STATE OF NEBRASKA
-ss
~ COUNTY OF DOUGLAS Subscribed and sworn to before me, a Notary Public in and for the State of Nebraska on this - /sr day of February,1985.
mn -
p No'tary Public-8tatm wtm -se.., m,,J J.T.GLEASON r
[
% h tag July 23, jggg c
-9w r -
ATTACHMENT
~
Certification of Compliance with 10 CFR 50.49
_As Requested by Generic Letter 84-24
'N NRC Request-(a)
"Each licen'see,...lis ' requested to submit... a certification that:
(a) the utility has in place and is implementing an Environmental Qualification -(EQ) i
- Program that will saMsfy the requirements of 10 CFR Section 50.49 within the currently; approved so.edule for the plant without further extension..."
District ~ Response (a)
The~ District certifies that'it has implemented an Equipment Qualification Pro-c gram =which meets: the requirements of 10 CFR 50.49. The methodology, program, b
Eand Regulatory Guide 1.97 schedule (10 CFR 50.49(b)(3)) are outlined in the a'
~ 1 District'slietter of May 31,1984, LIC-84-121 as amended by LIC-84-370, dated iNovember.16,1984, and by LIC-85-009. dated January 10, 1985.
Elements of the
? program essential to ensuring qualification were implemented prior to the Fort 1 Calhoun Station.10 CFR 50.49 deadline of the second refueling outage after 4-s LMarch 31, 1982.
It should be noted that within the currently approved schedule, L
'one item of-equipment (electrical penetration subassemblies) is not fully quali-7
. fied in;accordance with 50.~49.
A request for extension and a justification for continuedtoperation-(JCO) has been submitted for this item as noted in (b) below.
- At this time the District does not believe any other, extensions are required.
~
f
.NRdRequest(b)?
"Each li.censee... is required to submit... a certification that:... (b) the
~
i
~
plant has~ at least_ one path to safe shutdown using fully qualified e
', or, has ' submitted a. justification.for continued. safe operation (JCO) quipment, pending~ full qualification of'any equipment not fully qualified..."
vf
?DistrictResponse-(b) 1 iThe Distridt certifies that-safe shutdown can be achieved.
At -least one path to
~
~
.. safe shutdown exists using fully qualified equipment with the exception of_ the -
electrical ~ penetrations.1 A justification for continued operation -(JCO) and.re-(quest for' extension.was provided in-a letter dated July 3,1984. Based on. staff review'and discussion concerning.this' extension request, the District is pre-
- paring 'a' revised JCO. The, revised JC0 will reflect these discussions and is ex-
,m
- pected to be
- submitted by February 15. 1985.
- e
~NRC Request (c) l
- s,y, f"Each licensee...cis required to submit... a certification that
- ...(c)all
-other equipment within the scope of 50.49 is either fully qualified or a JC0 has-ibeenisubmitted:pending full' qualification."
! istrict Response (c)-
D The1 District certifies that electrical equipment within the scope of 10-CFR 50.49.-
W iis: qualified with the exception of the_ electrical penetrations as discussed above in (b),7 au
- kll,
.,:u
.i -.;.. a ;
_.,,.n
~,.
-,.w,,-,,.,.a,-,.w.a,,,,,n.,,,,-.-n-~L%,
,..,,,a,,
_ m
~
f
/
. w+
. +
s 2
~
NRC Request (d)
.The' certifications requested in (a), (b) and (c) above should specifically 1 address all IE Bulletins and Information Notices that identify EQ problems, to the extent that such bulletins and notices are relevant to the licensee's i
- facility. 7The following Bulletins and Information Notices are considered
.a'pplicable to these certifications:
IE Bulletin 82-04, IE Information Noti-
-ces 82-11,'82-52, 83-45, 83-72, 84-23, 84-44, 84-47, 84-57, 84-68, and 84-78.
District' Response'-(d)
The: District 2has procedures in place which require the review of Information Notices:and Bulletins for applicability to the Fort Calhoun Station. Upon completion of.the: required reviews, the District determines what necessary
. actions.are to be taken. The above referenced Bulletins and Notices have
- been or are being reviewed according to the established procedures.