|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217N6531999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Hope Creek Generating Station,Unit 1.With ML20210U4721999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Hope Creek Generating Station,Unit 1.With ML20210C4731999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Hope Creek Generating Station,Unit 1.With ML20196A1511999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Hope Creek Generating Station,Unit 1.With ML20206U1571999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Hope Creek Generating Station,Unit 1.With ML20205R5901999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Hope Creek Generating Station,Unit 1.With ML20204F7951999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Hope Creek Generating Station,Unit 1.With ML20199E7271998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Hope Creek Generating Station,Unit 1.With LR-N980580, Monthly Operating Rept for Nov 1998 for Hope Creek Generating Station,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Hope Creek Generating Station,Unit 1.With LR-N980544, Monthly Operating Rept for Oct 1998 for Hcgs,Unit 1. with1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Hcgs,Unit 1. with LR-N980491, Monthly Operating Rept for Sept 1998 for Hope Creek Generating Station,Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Hope Creek Generating Station,Unit 1.With LR-N980439, Monthly Operating Rept for Aug 1998 for Hope Creek Generating Station Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Hope Creek Generating Station Unit 1.With LR-N980401, Monthly Operating Rept for July 1998 for Hope Creek Generating Station,Unit 11998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Hope Creek Generating Station,Unit 1 LR-N980354, Monthly Operating Rept for June 1998 for Hope Creek Generating Station,Unit 11998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Hope Creek Generating Station,Unit 1 LR-N980302, Monthly Operating Rept for May 1998 for Hope Creek Generating Station,Unit 11998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Hope Creek Generating Station,Unit 1 LR-N980247, Monthly Operating Rept for Apr 1998 for Hope Creek Station, Unit 11998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Hope Creek Station, Unit 1 LR-N980196, Monthly Operating Rept for Mar 1998 for Hope Creek Generating Station,Unit 11998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Hope Creek Generating Station,Unit 1 LR-N980104, Monthly Operating Rept for Feb 1998 for Hope Creek Generating Station,Unit 11998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Hope Creek Generating Station,Unit 1 ML20203B6741998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Hope Creek Generation Station,Unit 1 ML20198T3591997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Hope Creek Nuclear Generating Station,Unit 1 ML20203B6841997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 & Jan 1998 for Hope Creek Generation Station,Unit 1,summary of Changes,Tests & Experiments ML20198T4061997-11-30030 November 1997 Revised MOR for Nov 1997 for Hope Creek Nuclear Generating Station,Unit 1.Summary of Changes,Tests,Experiments & Refueling Info,Encl ML20203K3751997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Hcgs,Unit 1 ML20203K3821997-10-31031 October 1997 Revised Monthly Operating Rept for Oct 1997 for Hcgs,Unit 1 ML20199G5591997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Hcgs,Unit 1 ML20199G5931997-09-30030 September 1997 Revised Monthly Operating Rept for Sept 1997 for HCGS, Unit 1 ML20211Q6481997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Hope Creek Generating Station ML20212A5301997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Hope Creek Generating Station,Unit 1,summary of Changes,Tests & Experiments ML20217A1491997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Hope Creek Generating Station,Unit 1 ML20217A6261997-07-31031 July 1997 Revised Monthly Operating Rept for Jul 1997 for Hope Creek Generating Station,Unit 1 LR-N970503, Monthly Operating Rept for Jul 1997 for Hope Creek Generating Plant Unit 11997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Hope Creek Generating Plant Unit 1 ML20149F2921997-06-30030 June 1997 Monthly Operating Rept for June 1997 for HCGS ML20149F3061997-05-31031 May 1997 Revised Monthly Operating Rept for May 1997 for Hope Creek Generating Station.Summary of Changes,Tests & Experiments Encl ML20140H6761997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Hope Creek Generating Station Unit 1.Summary of Changes,Tests & Experiments Implemented in Apr 1997 Included in Rept LR-N970321, Monthly Operating Rept for Apr 1997 for Hope Creek Generating Station1997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Hope Creek Generating Station ML20137X7311997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Hope Creek ML20147F6051997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Hope Creek Generating Station ML20147F6111997-01-31031 January 1997 Revised MOR for Jan 1997 for Hope Creek Generating Station LR-N970110, Monthly Operating Rept for Jan 1997 for Hope Creek Generation Station Unit 11997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Hope Creek Generation Station Unit 1 ML20133M9831996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Hope Creek Generating Station ML20133B7901996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Hope Creek Generation Station Unit 1 LR-N966376, Monthly Operating Rept for Oct 1996 for Hope Creek Generation Station Unit 11996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Hope Creek Generation Station Unit 1 ML20129A8271996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Hope Creek Generation Station Unit 1 ML20134C0941996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Hope Creek Generation Station ML20116P0181996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Hope Creek Unit 1 ML20117C3331996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Hope Creek Generation Station Unit 1 ML20134C1031996-07-31031 July 1996 Revised Monthly Operating Rept for Jul 1996 Hope Creek Generation Station ML20115E8491996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Hope Creek Generation Station ML20117C3701996-06-30030 June 1996 Revised Monthly Operating Rept for June 1996 for Hope Creek Generating Station ML20116P0381996-06-30030 June 1996 Summary of Changes,Tests & Experiments That Had Been Implemented During June 1996 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217F1501999-10-12012 October 1999 Special Rept:On 990929,south Plant Vent (SPV) Range Ng Monitor Was Inoperable.Monitor Was Inoperable for More than 72 H.Caused by Electronic Noise Generated from Noise Suppression Circuit.Replaced Circuit ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML20217N6531999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Hope Creek Generating Station,Unit 1.With ML20217M0211999-09-20020 September 1999 Part 21 Rept Re Possible Deviation of NLI Dc Power Supply Over Voltage Protection Circuit Actuation.Caused by Electrical Circuit Conditions Unique to Remote Engine Panel. Travelled to Hope Creek to Witness Startup Sequence of DG ML20211N5531999-09-0808 September 1999 Safety Evaluation Supporting Amend 121 to License NPF-57 ML20211B3781999-08-13013 August 1999 Special Rept 99-002:on 990730,NPV Radiation Monitoring Sys Was Declared Inoperable.Caused by Voltage Induced in Detector Output by Power Cable to Low Range Sample Pump. Separated Cables & Secured in Place to Prevent Recurrence ML20210U4721999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Hope Creek Generating Station,Unit 1.With ML20216D8331999-07-26026 July 1999 Safety Evaluation Concluding That Licensee IPEEE Complete Re Info Requested by Suppl 4 to GL 88-20 & That IPEEE Results Reasonable Given HCGS Design,Operation & History ML20216D8721999-07-26026 July 1999 Review of Submittal in Response to USNRC GL 88-20,Suppl 4: 'Ipeees,' Fire Submittal Screening Review Technical Evaluation Rept:Hope Creek Rev 1:980518 ML20210F3331999-07-22022 July 1999 Safety Evaluation Granting Relief Requests RR-B1,RR-C1,RR-D1 & RR-B3.Finds That Proposed Alternative for RR-B3 Provides Acceptable Level of Quality & Safety & Authorizes Alternative Pursuant to 10CFR50.55a(a)(3)(i) ML20210C4731999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Hope Creek Generating Station,Unit 1.With ML20216D8901999-06-30030 June 1999 IPEEEs Technical Evaluation Rept High Winds,Floods & Other External Events ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML18107A3441999-06-0101 June 1999 Interim Part 21 Rept Re Premature Over Voltage Protection Actuation in Circuit Specific Application in Dc Power Supply.Testing & Evaluation Activities Will Be Completed on 990716 ML20196A1511999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Hope Creek Generating Station,Unit 1.With ML20206Q4731999-05-14014 May 1999 SER Accepting Response to GL 97-05, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Plant ML20206U1571999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Hope Creek Generating Station,Unit 1.With ML20216D8451999-04-30030 April 1999 Rev 1, Submittal-Only Screening Review of Hope Creek Unit 1 IPEEE (Seismic Portion). Finalized April 1999 ML20206C8481999-04-22022 April 1999 SER Authorizing Pse&G Proposed Relief Requests Associated with Changes Made to Repair Plan for Core Spray Nozzle Weld N5B Pursuant to 10CFR50.55a(a)(3)(i) LR-N990157, Special Rept 99-001:on 990315, C EDG Valid Failure Occurred During Surveillance Testing.Testing Resulted in Unsuccessful Loading Attempt,Due to Failure EDG Output Breaker to Close.Faulty Card Replaced1999-04-12012 April 1999 Special Rept 99-001:on 990315, C EDG Valid Failure Occurred During Surveillance Testing.Testing Resulted in Unsuccessful Loading Attempt,Due to Failure EDG Output Breaker to Close.Faulty Card Replaced ML20205R5901999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Hope Creek Generating Station,Unit 1.With ML20205G6051999-03-19019 March 1999 SER Accepting Relief Request Re Acme Code Case N-567, Alternate Requirements for Class 1,2 & 3 Replacement Components,Section Xi,Div 1 ML20205F8911999-03-18018 March 1999 Safety Evaluation Authorizing Licensee Requests for Second 10-year Interval for Pumps & Valves IST Program ML20204F7951999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Hope Creek Generating Station,Unit 1.With ML18106B0931999-02-25025 February 1999 Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Caused by Crack Due to Improper Location of Heated Bar.Only One Part Out of 7396 Pieces in Forging Lot Was Found to Be Cracked.Affected Util,Notified ML18106B0551999-02-0101 February 1999 Part 21 Rept Re Possible Matl Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Defect Is Crack in Center of Forging.Analysis of Part Is Continuing & Further Details Will Be Provided IAW Ncr Timetables.Drawing of Part,Encl ML18106B0441999-01-29029 January 1999 Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee Part Number SS-6-T.Caused by Crack in Center of Forging. Continuing Analysis of Part & Will Provide Details in Acoordance with NRC Timetables ML20202F6861999-01-26026 January 1999 Engine Sys,Inc Part 21 (10CFR21-0078) Rept Re Degradation of Synchrostat Model ESSB-4AT Speed Switches Resulting in Heat Related Damage to Power Supply Card Components.Caused by Incorrect Sized Resistor.Notification Sent to Customers ML18107A1871998-12-31031 December 1998 PSEG Annual Rept for 1998. ML20199E7271998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Hope Creek Generating Station,Unit 1.With ML18107A1881998-12-31031 December 1998 PECO 1998 Annual Rept. LR-N980580, Monthly Operating Rept for Nov 1998 for Hope Creek Generating Station,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Hope Creek Generating Station,Unit 1.With ML20198N4161998-11-12012 November 1998 MSIV Alternate Leakage Treatment Pathway Seismic Evaluation LR-N980544, Monthly Operating Rept for Oct 1998 for Hcgs,Unit 1. with1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Hcgs,Unit 1. with ML20155J9861998-10-31031 October 1998 Non-proprietary TR NEDO-32511, Safety Review for HCGS SRVs Tolerance Analyses LR-N980491, Monthly Operating Rept for Sept 1998 for Hope Creek Generating Station,Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Hope Creek Generating Station,Unit 1.With ML17354B0971998-09-0909 September 1998 Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils LR-N980439, Monthly Operating Rept for Aug 1998 for Hope Creek Generating Station Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Hope Creek Generating Station Unit 1.With LR-N980401, Monthly Operating Rept for July 1998 for Hope Creek Generating Station,Unit 11998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Hope Creek Generating Station,Unit 1 ML20236N6751998-07-0909 July 1998 Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps LR-N980354, Monthly Operating Rept for June 1998 for Hope Creek Generating Station,Unit 11998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Hope Creek Generating Station,Unit 1 ML20236E9491998-06-30030 June 1998 Rev 0 to non-proprietary Rept 24A5392AB, Lattice Dependent MAPLHGR Rept for Hope Creek Generating Station Reload 7 Cycle 8 ML18106A6821998-06-24024 June 1998 Revised Charting Our Future. ML18106A6681998-06-17017 June 1998 Charting the Future. LR-N980302, Monthly Operating Rept for May 1998 for Hope Creek Generating Station,Unit 11998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Hope Creek Generating Station,Unit 1 ML20248C7381998-05-22022 May 1998 Rev 0 to Safety Evaluation 98-015, Extension of Allowed Out of Service Time for B Emergency Diesel Generator LR-N980247, Monthly Operating Rept for Apr 1998 for Hope Creek Station, Unit 11998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Hope Creek Station, Unit 1 LR-N980196, Monthly Operating Rept for Mar 1998 for Hope Creek Generating Station,Unit 11998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Hope Creek Generating Station,Unit 1 ML20217D5701998-03-20020 March 1998 Part 21 Rept 40 Re Governor Valve Stems Made of Inconel 718 Matl Which Caused Loss of Governor Control.Control Problems Have Been Traced to Valve Stems Mfg by Bw/Ip.Id of Carbon Spacer Should Be Increased to at Least .5005/.5010 ML18106A5851998-03-0303 March 1998 Emergency Response Graded Exercise,S98-03. Nuclear Business Unit Salem,Hope Creek Emergency Preparedness, 980303 1999-09-08
[Table view] |
Text
~
^
O PSIEG Pubhc Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038 Hope Creek Generating Station Ju?.y 15, 1992 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 -
Dear Sir:
MONTHLY OPERATING REPORT HOPE CREEK GENERATION STATION UNIT 1 DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creeir Technical Specifications, the operating statistics for= June are being forwarded to you along with the summary of changes, tests, and experiments for June 1992 persuant to the requirements of 10CFR50.59(b).
Sincerely yours, r = -_
J J Ha'an en ral Eanager -
Hope re k Operations
.; RAR:Id
_ k Attachments C Distribution
// \
The Eneray People 8 l
9207200194 920630 ' O C '}_ O 1 i f
" "i2m12ea PDR ADOCK 05000354 R PDR
j.
.- i>'
.c ; (, ,
4 INDEX NUMBER SECTIOli OF PAGES Average Daily Unit Power Level. . . . . . . . .. . 1 Operating. Data: Report . .. . . . . . . . . . . . . . 2 Refueling Information:. . . . . . . . . . . . . . . 1 Monthly Operating Summary . . . . . . . . . . . . . . 1 Summary of Changes, Tests, and Experiments. . .. . . 3
(+
4 I
- AVERAGE DAILY UNIT POWER LEVEL l
DOCKET No. 50-354 UNIT Eque Creek -
DATE 7/15/92 COMPLETED BY V. Zabielski Al TELEPHONE (609) 339-3506 MO!!TH June 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)
- 1. 790 17. 1041
- 2. 1036 18. 1042
'3. 1041 19. 1037
- 4. 1049 20. 1(L431
- 5. 1qiq 21. 1015
- 6. 1040 22. 1911
- 7. 1014 23. 1049
- 8. 1925 24. 1031
- 9. 1038 25. 1048 10- 1041 26. 1039
- 11. 1058 27. 1036 12, 1037 'e 8 . 1034
- 13. 115- 29. 1036
- 14. 427 30. 1C37
- 15. 979 31. ELA
- 16. 1044
)
4
4 < 1
')
No:
CC j
+ <
u 4
a: "'
OPERATING ~ DATA 1 REPORT ~ -!
=DOCKETENO.' 50-354
_s;~ UNIT . Hope Creek DATE; 12l/,15/92
~
V.~Zabielski 'N
. COMPLETED BY W -
LTELEPHONE-- (609) 339-3506 F .
OPERATING-STATUSL (1. LReportinglPeriodiJune- 1992-Gross Hours in Report Period 11Q I';
, - 12 . L - Currently Authorized Power- Level -(MWt) 2 3293
-Max. Depend.cCapacity-(MWe-Net) 1031 Design Electrical Rating 1(MWe-Net). 1067 3 '. ~ Power Level to which; restricted lifiany) .(MWe-Net)
E None f 4 6. ; Reasons:for restrictioni(if'any). ._
This Yr To- .
= Month Date- Cumulative 5.: No. of hours l reactor:wasicritical 720.0 4049.5 41.210.8 4
4 6.3 Reactor ~ reserve' shutdown hours- 222 0;0 0.0
- 7. LHoursigeneratorlon?lin'e < 701.1- 2237.4 40.562.0 (8. $ Unit-Lreserve shutdownihours 22 0~ 0.0 0.0
. 291 [ Gross therral' energy -generate'd : 2.231.387: 12.768.348- .128.765.49.1 l(MWH)' '
,10.Niross' electrical l energy =
~736.650 4.258.530 42.611*.024- *
[s. generated!(MWH).
I llE Net electricalDenergy. generated 704.077 .4.070.028 40.721.577
-12'. ReactorfserviceJfactor. <100.0. 9 2 .' 7 - 85.0 13.-Reactorlavailability factor 100.0 92.7 85.0
~
14 '. Unit servicesfactor' 97.4 91._3 83.7 15;LUnitravailability factor 97.4 91.3 83.7
~
- 16.
- Uniticapacity' factor (using MDC) -
94.8 90.4 81.5
!17'., Unit ~ capacity factor 91.6 87.3 2322 s
, .(UsingEDesign'MWe) s18. Unitiforced outage rate 2.6 3.2 5.0 19s ShutdownsEscheduled-over--next 6 months (type, date, & duration):
Refueling outage,-9/12/92, 60 days l20. If shutdown at end of report period, estimated date of start-up:
N/A 9
r -
= , g 4 - -, ,. 7 - , , , _ _ - _ , , _ , , , _ _ _ , , , _ _ _ , _ _ _ -
, , f ,
- n ,
' ?
, 4 <: 3 i,% I s
' .1 ~
- w ", , .
&% -" #, ~
- Jf ,
r .-
d w z OPERATING DATA. REPORTS -
[ T
-UNITcSHUTDOWNSiAND POWER: REDUCTIONS A.
Q> ,
~
4'
, DOCKET--NO.- .50-354 _
c ,
-UNIT HoDe-Creek P : 'c
'DATE 7/15/92 COMPLETED-BYDy. Zabielski: Y, TELEPHONE (609) 339-3506-( -H 6 7h0 NTH June =- ,1992 METHOD t OF -- =t SHUTTING
^
DOWN_THE-E TYPE 4 qREACTOR OR' - - -
e- -
.. F= FORCED' DURATION REASON REDUCING ' CORRECTIVE O NO. DATEj S= SCHEDULED.f(HOURS) (1)- POWER 1(2) ACTION / COMMENTS
, ; 5 -- E6/1 iF 0- ' A -- 4' PoNer ascension-1-
fallowing-May;:
forced outage' LER 354/92-006
- c. 6 16/13 '
- FJ ~~1819 -A- 9 ' Unit was.taken off-line'to-repair.EHC1 leak.- The--Reactor.
s -
was not shtt down,
~
but was kept at :
, 'approximately 3% ,
power for the duration of the-
' outage. ;
O.
4 5
.6 Y _
..}'TS.u'mmary7 r
7 4 'E_.
i ,
s-REFUELING INFORMATION DOCKET NO. 50-354 UNIT Hope Creek DATE 7/15/92 COMPLETED BY S. Hollinasworth TELEPHONE- (609) 339-1051
+
. MONTH June M
- 1. Refueling information has changed from last month:
Yes X No
- 2. Scheduled date-for next refueling: 9/12/92
- 3. Scheduled date for restart following refueling: 11/11/92
- 4. A. Will Technical Specification changes or other license amendments be required?
Yes No X B. Has the reload fuel design been reviewed by the Ctation Operating Review Committee?
Yes No X If no, when is it scheduled?- not scheduled (on or prior to 10/28/92)
- 5. Scheduled date(s) for submitting proposed licensing action: ELA
- 6. Important licensing considerations associated with refueling:
- Same fresh fuel as current cycle: no new considerations
- 7. Number of Fuel Assemblies:
A. Incore 764 B. In Spent Fuel Storage (prior to refueling) 760
-0. In Spent Fuel Storage (after refueling) 1008
- 8. Present licensed spent fuel storage capacity: 4006 Future. spent fuel storage capacity: 4006
- 9. Date of last refueling that can be discharged 11/4, 2010 to spent fuel pool assuming the present (EOC16)
-licensed capacity:
(does not allcu for full-core offload)
HOPE CREEK GENERATING STATION MONTHLY OPERATING
SUMMARY
June 1992 On June 1, power ascension was-underway following a forced outage on May 26 due to the failure of the Drywell to Suppression Chamber Decay Test to meet its acceptance criteria. The unit reached approximately 100% power on June 1. On June 13, the unit was taken off line to repair an Electro-Hydrualic Control leak. The Reactor remained at approximately 3% power during this evolution, was brought back on line on June 14, and restored to 100% power on June 15. On June ~30, the plant had been on line for 16 consecutive days.
9
SUMMARY
OF CHANGES, TESTS, AND EXPERIMENTS FOR THE HOPE CREEK GENERATING STATION JUNE 1992 h
e
)
h The following item has been evaluated to deternine:
- 1. -If-the probability of occurrence or'the consequences of an accident or-malfunction of equipment important to safety previously evaluated-in the safety analysis report may be increased; or:
2.- If a possibility for an accident or malfunction of a different type thanLany evaluated prevj Asly in the safety analysis report may be created;,or
- 3. If the margin of safety as defined in the basis-for any technical specification is reduced.
The 10CFR50.59 Safety Evaluation showed.that this item did not create a new safety hazard to the plant nor did it affect the safe shutdown of the reactor. This item did not change the plant effluent releases and did not alter 1the existing environmental
- -impact . :The 10CFR50.59 Safety Evaluation = determined that no unreviewed safety orienvironmental. questions Are-involved.
DCE Description of Safety Evaluation
- y
-g:
.7-
. SQU1 Descrintion of Safety Evaluation 92-016 This TMR installed electrical jumpers across the Feedwater Heater's High High Level Trip Switches.
u These switches cause spurious high level trip signals during low power levels-due to inleakage in the reference leg. -The jumpers are only required
.until the level sianals stabilize-and were removed later in the month!
The Feedwater system is not safety related and is not requirca to be operable following a LOCA, other than for containmcnt isolation. Failure of the Feedwater system does not compromise any safety related system or components. This TMR has no impact on the containment isolation function of the Feedwater system. Therefore, this TMR does not involve any Unreviewed Safety Questions.
L t
l-I