Forwards Rev 26 to Physical Security Plan.Encl Withheld Per 10CFR73.21
ML20101R699
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 04/11/1996
From: Terry C
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TXX-96112, NUDOCS 9604170005
Download: ML20101R699 (2)


Text

{{#Wiki_filter:. ESCLOSURE CCNTAiNS SAFEGUPOS it: FORMATION, 4. JFON SEFAFATION Uf!S PME !S DECCNTR6LL . Q Ari __E J T 1 l [..:g.x, F=mmen Log # TXX 96112

  • sI t

a u.w m

== File # 10011 (clo) bQ D @ 4\\ j Ref, # 10CFR50.54(p)(2) "J a* ?d XV . S,W w asas 3d% TUELECTRIC April 11, 1996 C. Lance Terry Grump %e Prrudent U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) DOCKET N05. 50 445 AND 50 446 TRANSMITTAL OF THE CPSES PHYSICAL SECURITY PLAN REVISION 26 REF: TU Electric letter logged TXX 95049, from C. L. Terry to NRC dated February 24, 1995 Gentlemen: In accordance with 10CFR50.4 enclosed are four (4) copies of the CPSES Physical Security Plan Revision 26 (copy numbers: 13, 14, 15 and 16). Included with each plan is a " Summary of Changes" which lists the changes incorporated in Revision 26. An evaluation conducted per 10CFR50.54(p), determined that these changes do not decrease the effectiveness of the security program. The enclosure to this letter contains SAFEGUARDS INFORMATION as defined in 10CFR73.21: consequently, the enclosure should not be placed in the Public Document

Room, s

Q M ] b '# M }dT 3 A / P,% I r o n 9_' W ~ 9604170005 960411 fDR INFORMAT3CN ADOCK 05000445 red 75$37#335?s f f fA u, ~, %..s o. 1,,,,,.m,

_. _ ~. -. _ _. _. _ _ _. _ _. _ _.. _ _ ~. _. _ _.. _ _ i ENCL 0SURE CONTAINS SAFEGUAT<0S ! ;FOR'! ATicti, 20N SEPARAT10tl THIS PAGE :S DECONTR0ttED. ] i l TXX-96112 Page 2 of 2 Please note that Revision 26 adds a general description of the vehicle 4 barrier system (VBS) installed at CPSES. Also, please be advised that the final as built VBS design is not totally equivalent to that previously l described in the summary description of proposed control measures submitted to the NRC with the above referenced letter: however, the as 4 i built VBS design is in conformance with the guidelines and methodology } provided by the NRC for this purpose. The details of the final as built l VBS design are maintained onsite in controlled documents and are available l for NRC inspection. j Sincerely. l C. L. Terry i By: i D. R. Woodlan Docket Licensing Manager CLW/grp Enciosure i i cc: Mr. L. J. Callan. Region IV (w/ enclosure. Copy Nos. 17 and 18) j Hs. L. Smith. Region IV (w/o enclosure) Mr. T. J. Polich. NRR (w/o enclosure) i Resident Inspectors (w/o enclosure) i i 4 SAMGUARDS BiCLOSURE CONTAINS SAFEGUARDS INf 0 INFORM =a=Pty cr0s SteAeatioN tais eact is otco"taouto-}}