ML20101P331

From kanterella
Jump to navigation Jump to search
Forwards Revised Epips,Including Rev 23 to AR-303, Annunciator Response, & Rev 52 to EM-202, Duties of Emergency Coordinator
ML20101P331
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/03/1996
From:
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20101P335 List:
References
NUDOCS 9604090335
Download: ML20101P331 (1)


Text

Document Transmittal #: 43662 Date: 4/3/96 Tc:

NRC (DC DESK)

MAC: N/A Destination:

==

Description:==

Copy Copy Totals Document:

Revision:

C_omment:

INFO CNTL MSTR AR0303 23 24 1

0 0

EM0202 52 12 1

0 0

l l

instructions to the Addressee:

Please verify the document (s) received agrees with the above information. Be sure to destroy document (s) cr portions of document (s) superseded by the above.

The signature indicates acknowledgment of receipt of the above riccument(s). Retum signed and dated transmittal to Document Control within 20 days at mail codc;

^

96040f0335 960403 PDR ADOCK 05000302 Florida Power Corporation F

PDR Document Control, NA1C Crystal River Energy Complex 15760 W. Power Line St.

Crystal River, FL 34428-6708 Signature of Addressee:

Date:

Independent Verification:

Date:

(Control Room documents only) s, i

-