ML20101L763
| ML20101L763 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 12/21/1984 |
| From: | Foster D GEORGIA POWER CO. |
| To: | Adensam E Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20101L766 | List: |
| References | |
| GN-493, NUDOCS 8501020364 | |
| Download: ML20101L763 (3) | |
Text
-.
Georg a Power Company Route 2. Box 299A Waynesboro. Georgia 30830 Telephone 404 554 9961. Ext 33GO 404 724 8114. Ext 3360 Georgia lbwer D. O. Foste,
!!w southern entic sysicin ene n
Vogtie Project December 21, 1984 Director of Nuclear Reactor Regulation File: X7N00.12 Attention:
Ms. Elinor G. Adensam, Chief X7BC35 Licensing Branch #4 Log:
GN-493 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C.
20555 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 FSAR AMENDMENT NUMBER 12
Dear Mr. Denton:
Georgia Power Company, acting on its own behalf and as agent for Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and the City of Dalton, Georgia, hereby submits Amendment 12 to the Vogtle Electric Generating Plant (VEGP) Final Safety Analysis Report (FSAR).
This amendment consists of revised pages for the FSAR and provides responses to NRC questions transmitted in Ms. Adensam's letter dated October 26, 1984. lists additional changes; these changes are a result of updated design information and an updated response to Q 241.5.
Also, instructions I
for inserting this material are included.
In accordance with the requirements of 10 CFR 50.30 (b) and (c), three (3) signed originals and sixty (60) copies of Amendment 12 are submitted for your use.
l l
Should you have any questions on the enclosed submittals, do not hesitate to contact me.
l Yours truly, 8501020364 841221 PDR ADOCK 05000424 c
H PDR D. O. Foster DOF/ JAB /sw SWORN AND SUBSCRIBED BEFORE ME, THIS
/8f DAY OF dh 1984.
n sures xc: List attached.
f, G+ W&at b
Notafy/Pulfiic, G'orgia State at Large
,W 0 ' g* A acp=:n e n Wdn y
P a>
9
Director of Nuclear Reactor Regulation File: X7N00.11 December 21, 1984 X7BC35 Page 2 Log:
'GN-493 xc:
M. A.-Miller R. A. Thomas G. Bockhold, Jr.
J. A. Bailey L. T. Cucwa L. Fowler C. A. Stangler J. E. Joiner, Esquire G. F. Trowbridge, Esquire l
j L
Additional FSAR Changes SECTION NO.
REASON FOR CHANGE 7.3.7 and Conform FSAR description to 10.4.9 latest design and drawings of the AFW system.
9.3.2 Update FSAR to reflect current routing of the sample sink drain.
9.2.8 Revised T 9.2.8-1 to reflect current calculations of the ACCW system.
9.2.9 Update FSAR to reflect latest logic diagrams of the chilled water system.
Question &
Revised Q 241.5 to show Response Vols, bearing capacity.