OPERATING DATA nLronT 50-247 DOCKET NO.
DATE 19-4-na M. Blatt COMPLETE!)IlY W 14 mb-5127 TELEPil0NE j
OPERATING STATUS Indian Point Unit #2 Notes I. Unit Name:
November 19R4
- 2. Reporting Period:
2758
- 3. Licensed Thermal Power (MWt):
1013
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe): 873
- 6. Maximum Dependable Capacity (Gross MWe): _onn 864 l
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
i
'f NONE
.i
- 9. Power LevelTo which Restricted.If Any (Net MWe):
NONE 3
- 10. Reasons For Restrictions.If Any:
j e.
- .ge a
f d
' d Month Yr to.Date '
Cumidative
.f 20 91345 i 8040 II. Hours In Reporting Period 718.10 4264.60 60211.82
- 12. Number Of Hours Reactor Was Criti al 1.90 20.62 2140.35 0,
- 13. Reactor Resene Shutdown flours 718.03 4147 63 58343.33 2
- 14. Hours Generator On-Line 0
0 0
~
- 15. Unit Resene Shutdown flours 1936122-10579A37 191612456
- 16. Gross Thermal Energy Generated (MWil)
- 17. Cross Electrical Energy Generated (MWil) 614970,,
3313340 46970916 593056 3158910 44786002 4
- 18. Net Electrical Energy Generated (MWil) 99.7 51.6 63.9
'l
- 19. Unit Senice Factor 99.7 51.6 63.9
- 20. Unit Availability Factor e.9 5/.1 jf
- 21. Unit Capacity Factor IUsing MDC Net) 94.4 45.0 56.2
,1
- 22. Unit Capacity Factor (Uning DER Net) 0 10.8 9.3
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Ne.st 6 MonthsIType.Date,and Duration of Eacht:
t
.]
NONE
{
j
- 25. If Shut Dunn At Eiid Of Re wrt Period. Estimated Date of Startup:
Forecast Achiesed d
- 26. Unit > In Test Status IPrior :o Commercial Oswration):
6 1
i.
N q
INITI.\\L CRITICALITY
)
\\
_\\
lN INITI \\l. El l'CTitlCI TY
\\
\\
l.
COMMI'ItCIAL Ol'l ltA TION
- r' B501020244 e41130 hDRADOCK 05000247 08/77 )
i PDR
~
((
L'
3 AVER AGE DAILY UNIT POWER LEVEL 50-247 DOCKET NO.
I.P. Unit #2 UNIT 12-4-84 DATE COMPLETED BY
(') 14) 326-31 Z /
TELEPilONE NOVEMB'ER MONTH DAY AVERAGE DAILY POWER LEVEL
' DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(Mwe-Net) 1 744 37 841-721 835 2
gg 743 830 3
_ 39 835 850 4
0 829 850 g
824 851 6
22 832 854 7
- 23 8
832 24
'851 9
823 2;
853 809 850 10 26 826 847 gg 27 I
826 852 1.,
28 837 850 13 29 837 682 14 30 844 15 3,
16 849 INSTRUCTIONS On this format, list the average daily unit power leseli., MWe. Net for each day in the reporting inonth. Cornpute o the nearest whole nwgawait.
W/77)
-s
.s.
C DOCKETNO.
UNITSHUTDOWNS AND % REDUC 110NS I.P. Unit #2 UNIT NAME DATE 12-4-84 i.
7:
f fNOVEMBER 1984 COMPLETED Sy M. Blatt REPORT MONTH TELEPHONE (914) 3Z6-5 fp a
l-
-~
e.
g
.$ E 3
jIE Licensee E
e Cause & Currective f*
N *.
Date
[
Eg
(
2 g:Tc Event Action to 0
$5 a's jig g Report at Present Recurrence H
u d
6 841130 S
1.90 B
1 NA
- lHA
ZZZZZZ Misc. Maintenance 1
p-
'i L
s.
- 1
,\\
i A
l 2
37 4
F: Forced Rwon:
? Methed:
Enlubit G. instructisms 5: 5<heduled A liquipment Failure (Explain) a. I-Manual for Pseparation of Data 84taintenance of Test
, ' 2 Manual 5 cram.
Entry Sheets for Licensee C Refueling
. g. 3 Autonistic Scram.
Event Report iLERI File iNUREG.
D Regulatory Restriction 2 4Oher(Emplain) 0161)
E Operator Training & Ucense Exasminetton 5
F Administrative p
G Operational Error (Explain)
Eshibit I.Same Sousee t'8!77)
H&her(Emplain)
.t s
e
. w '. ',. f. e 5
.a.
-94.i *,. {e.*
e
,e.
,e g
y.* e
=
e,
, g
?"
o 8.
'm
. A q
A. un tE. 'e O
s
a e
Summary of Operating Experience November 1984 Following the completion of 90% power physics testing, Indian Point Unit i
No. 2 reactor power was increased to 100% on November 4.
With the exception of a few brief power reductions, the Unit operated at maximum licensed reactor power through November 29.
On November 2, power was briefly reduced from 90% to 829 due to low condenser vacuum. On November 9,10 and 18 reactor power was reduced by approximately 10% due to higher than normal steam generator chloride concentrations.
Early in the month, a small primary to secondary leak was confirmed in No. 22 steam generator. The leak rate is on the order of 0.006 gallons per minute and appears to be stable at this rate.
On November 30 the Unit was bought to hot shutdown for a scheduled two day maintenance outage.
t
e e
D MAJOR SAFETY RELATED CORRECTIVE MAINTENANCE MWR NO.
SYSTEM COMPONENT DATE WORK PERFORMED 14603 RCS Valve PCV 455A 8/24/84 Valve body and bonnet replaced with one from spare valve.
14854 CVCS 21 Charging Pump 8/07/84 Removed and replaced all packing, plungers, springs,
)
valves, and valve J
seats.
l 10993 ACS 21 Component 9/17/84 Removed motor, Cooling Pump inspected inside of motor, replaced the bearings.
14083 MRS 21 Steam Dump 9/07/84 Removed operator.
Valve Drilled out broken bolts, tapped holes, re-installed j
operator and set I
stroke.
14677 SW 24 SW Strainer 9/20/84 Replaced gearbox housing supports, bearing collar, strainer element and repacked strainer.
10929 APW 21 ABF Pump 10/11/84 Removed bearing covers and upper half of pump.
Removed rotating element. Cleaned upper and lower halves of pump casing.
Re-installed new rotating element.
I 14671 SW SWN 44-3-B 10/05/84 Repaired valve.
14672 SU SWN 41-3-B 10/05/84 Repaired valve.
14676 SW SWN 44-4-B 10/05/84 overhauled valve 15657 SW SWN 41-4-B 10/05/84 overhauled valve 15784 SW SWN 41-1-B 10/05/84 Removed and repaired valve, re-installed.
i MAJOR SAFETY RELATED CORRECTIVE MAINTENANCE MWR NO.
SYSTEM COMPONENT DATE WORK PERFORMED 15785 SW SWN-44-1-B 10/05/84 Repaired valve.
15912 SW SWN 41-5-A 10/05/84 Removed valve, inspected and re-installed.
15913 SW SWN 41-5-B 10/05/84 Repaired valve.
15914 SW SWN 44-5-A 10/05/84 Repaired valve.
15915 SW SWN 44-5-B 10/01/84 Repaired valve.
15916 SW SWN 44-2-A 10/05/84 Repaired valve.
15917 SW SWN 44-2-B 10/05/84 Repaired valve.
15918 SW SWN 41-4-A 10/05/84 Removed and re-installed valve 15919 SW SWN 44-4-A 10/05/84 Repaired valve.
15920 SW SWN 41-3-A 10/05/84 Repaired valve and re-installed.
15921 SW SWN 44-3-A 10/05/84 Repaired valve.
15927 SW SWN 44-1-A 10/05/84 Repaired valve and re-installed.
15928 SW SWN 41-2-A 10/05/84 valve was removed, repaired and replaced.
15929 SW SWN 41-2-B 10/05/84 Repaired valve.
I
\\
l i
l l
l
f*-
John D. OToolo
- vc, Presacer1 7
Consoledated Edison Company of New York, Inc -
I 4 trying Place, New York, NY 10003 December 15, 1984 Re Indian Point Unit No. 2 Docket No. 50-247 Mr. William G. Mcdonald, Director Office of Management Information and Program Control c/o Distribution Services Branch, DDC, ADM U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Mr. Mcdonald:
Forwarded herewith are two copies of the Monthly Operating Report for Indian Point Unit No. 2 for the month of November 1984.
Verytrulyyourf,
}) lw lY Encl.
l cca Mr. Plchard DeYoung, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Dr. Thomas E. Murley, Regional Administrator Region I U.S. Nuclear Regulatory Commission i
631 Park Ave.
l King of Prussia, Pa. 19406 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 38 Buchanan, New York 10511