'N AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 277 UNIT PEACH BOTTOM UNIT 2 DATE DECEMBER 14,1984 COMPANY PHILADELPHI A ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE LICENSING ".,LCTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 MONTH NOVEMBER 1984 a
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
( MWei-N ET )
(MWE-NET) 1 0
17 0
2-0 16 0
3 0
19 0
4 0.
20 0
5 0
21 0
6 0
22 0
7 0
23 0
l 8
0 24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
4 16 0
8501020125 841130 PDR ADOCM 05000277 R
PDR L
f6T
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 278 UNIT PEACH 60TTOM UNIT 3 DATE DECEM6ER 14,1984 COMPANY PHILADELPHI A ELECTRIC COMPANY W.M.ALDEN ENGIN EER-IN-CHARGE LICFNSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 MONTH NOVEM8ER 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL IMWE-NET).
(MWE-NET) 1 827 17 798 2
757 lb 843 3
366 19 850 4
345 20 854 i
S 199 21 866 6
0 22 892 7
0 23 904 8
0 24 682 9
0 25 715 10 0
26 841 11 0
27 840 12 0
28 847 13
's 29 848 14 136 30 842 15 203 16 718 a
h i
ii !
j'k t
i e.-
.DPERATING DATA REPORT DOCKET NO. 50 - 277 OATE DECEMBER 14,1984 COMPLETED BY PHILADELPHIA ELE TRIC COMPANY-W.M.ALDEN E NGINE ER-I N-CHA R GE LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (2 15 ) 841-5022 OPERATING STATUS
- 1. UNIT NAME s PEACH DOTTOM UNIT 2 1 NOTESS UNIT 2 CONTINUED ITS l
l l
- 2. REPOR TING PERIODt NOVEMB ER, 1984 1
SCHEDULED SHUTDOWN FOR l
g l
- 3. LICEN SED THERM AL POWER (MWTi t 3293 l
ITS SIXTH REFUELING AND I
g I
- 4. NAMEPLATE RATING (GROSS MWEl1 1152 1
MAINTENANCE OUTAGE.
I I
I
- 5. DESIGN ELECTRICAL RATING INET MWE11 1065 I
i l
l
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MhEls 1098 l
1 I
i
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWEls 10$1 l
l 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 73 $1NCE LAST REPORT, GIVE RE ASONS
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWElt
- 10. RE ASONS FOR RESTRICTIONS, IF ANY THIS MONTH YR-TO-D A T E CUMU LATIVE
- 11. HOURS IN REPORTING PERIOD 720 8,040 91,248
- 12. NUMBER OF HOURS REACTOR W AS CRITICAL 0
2,584.7 62,283.6
- 13. RE ACTOR RE SERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE 0.0 2,544.8 60,555.6
- 15. UNIT RESERVE SHUIDOWN HOURS 0.0 0.0 0.0 16 GROSS THERMAL ENERGY GENERATED (MWH) 0 7,865,391 178,420,001
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 2,547,570 58,718,660 1
- 18. NET LLECTRICAL ENERGY GENERATLD ( M WH )
-3,653 2,429,885 56,266,315 y
- 19. UNIT SERVICE F ACTOR 0.0 31.7 66.4 j
- 20. UNIT AVAILABILITY FACTOR 0.0 31.7 66.4
- 41. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 28.8 58.7 9
- 22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 28.4 57.9
- 23. UNIT FORCED OUTAGE RATE O.0 4.4 12.5
- 24. SHUT 00WNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH it I
SCHE DULED SHUTDOWN FOR REFUELING AND MAINTENANC E, STARTED 4/27/84 d$. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPt 03/31/85 i
- 24. UNITS IN TEST ST ATUS (PRIOR TO COMMERCIAL OPERAT10 Nit FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION o - NEGATIVE VALUE RE PORTED FOR CONSISTENCY WITH FEDERAL ENERGY REGULATORY COMMISSION REPORTS.
c.
-,.,, -~
. p' OPERATING DATA REPORT i
DOCKET NO. 50 - 278 DATE DECEM8ER 14,1984 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY W.M. ALDE N ENGINEER-IN-CHARGE LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022
)
OPERATING' STATUS
- 1. UN I T MME 8 PE ACH BOTTOM UNI T 3 i NOTES P8 3 OUTAGES SCHED. OUTAGE l l
l
- 2. REPOR TING PERIODE NOVEMBER, 19u4 i
TO REPAIR STEAM LEAK IN D/W C 1 1
I
- 3. LICEN SED THERMAL POWER (MWil t 3293 I
OTHER MISC. MAINT...APRM HIGH l l
l
- 4. NAMEPLATE RATING (GROSS MWEl s 1152 I
HIGH FLUX SCRAM AS B RECIRC. 1 I
I
- 3. DESIGN ELECTRICAL RATING INET MWElt 1065 i
PUMP WAS PUT ON.
l 1
I
- 6. MAX 1 MUM DEPENDABLE CAPACITY (GROSS MWEl* 1098 l
LOAD REDUCTION: LOAD REDUCED l l
1
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWEls 1035 i
FOR WATER BOX WORK.
I 4
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 73 SINCE LAST REPORT, GIVE REASONS
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWEls
- 10. RE ASUNS FOR RESTRICTIONS, IF ANY:
THIS MONTH YR-TO-DATE CUMULATIVE
- 11. HOURS !N RdPORTING PERIOD 720 8,040 87,144
- 13. NUMBER C-HOURS REACTOR WAS CRITICAL 583.9 7,013.7 63,813.5
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE 513.8 6,873.2 62,189.4
- 15. UNIT RESERVE SHUTDOWN h004S 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,190,328 21,241,671 182.279,976 1
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 377,120 7,074,840 59,889,960
- 10. NET dLECTRICAL ENERGY GENERATED (MleH )
363,555 6,846,782 57,510,567 3
- 19. UNIT SERVICE F ACTOR 71.4 65.5 71 4
- 30. UNIT AVAILABILITY FACTOR 71.4 85.5 71.4
- 31. UNIT CAPACITY FACTOR (USING MDC NET) 48.8 82.3 63.8
- 22. UNIT CAPACITY F ACTOR (USINGDERNEj{_
47.4 _ ___ _ 80._0 _ _
,, _ 62.0
- 23. UNIT FORCED OUTAGE R AT E 3.2 10.0 7.6
- 24. SHUTDOWNS SCHEDULLD DVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH l REFUEL AND MAINTENANCE OUTAGE FROM 3/30/85 TO 06/08/85 d5. IF SHUT 00WN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP
- 36. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONl t FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCI AL OPERATION w
e.--
g
.g-..
UNIT SHUTDOWNS AND POWER REDUCTICNS DOCKET NO. 50 - 27T UNIT NAME PEACH BOTTOM UNIT 2 DATE DECEMBER 14,1984 REFORT MONTH NGVEMBER, 1984 COMPLETED BY PHILADELPHIA ELECTRICCOMbN W.M.ALDEN E NGIN E E R-IN-C HARGE LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 l
l l
l l METPOD OF l LICENSEE ISYSTEMICOMPONENTI CAUSE AND CORRECTIVE l
lTYPElOURATIONIREASONISHUTTING DOWNI EVENT l CODE l CODE I ACTION TO NO.i OATE I t il l (HOURSil (2) l REACTOR (3) i REPORT 5 l (4) l (5) l PREVENT RECURRENCE 1
I I
I I
I I
I I
5 1 841101 1 5i T20.0 1
C l 1
i NA l RC l FUELXX 1 SHUTD WN FOR ITS SIXTH REFUELING OUTAGE.
I I
i--
1 I
I I
I I
i l
I 720.0 l
l 1
l l
l (1)
(2)
(3)
(4)
F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS
- S - SCHEDULED A - EQUIPMENT FAILURE ( EXPL AIN )
1 - M ANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT lLER) 0 - REGULATORY RESTRICTION 4 - OTHER (EXPLAINI FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER(EXPLAINI EXHIBIT I - SAME SOURCE s
w.
h
~
\\-
ym'~
_ [ RM"&?h?[&W&~ ~,
W,& M
'WWMMS %
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 278 UNIT NAME PEACH BOTTOM UNIT 3 DATE DECEMBER 14,1984 REPORT MONTH NCVEMBER, 1964 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN E NGIN E E R-IN-CHA RG E LICENSING SECTION GENERA TION DIVISION-NUCLE AR TELEPHONE (2151 841-5022 ISYSTEMICOMPONENTl CAUSE AND bbRRECTIVE i
i l
l l METHOD OF I LICENSEE I
I T Y PE I O U RA T ION I RE A SON I SHU T T ING DowN I EVENT l CODE I CODE I ACTION TO NU.I DATE I (111 (HOURSil (2) 1 RE ACTOR (3) l REPORT # 1 (4) l (5) 1 PREVENT RECURRENCE I
i i
i i
i I
I i
10 l 641106 1 5l 109.1 l
A I 1
i N/A l CC l VESSEL I REP AIR VAVLE PACKING LE AK IN DRY WELL i
I I
I I
I I
I i
11 1 641114 I Fi 17.1 1
H I 3
i N/A i 1A I INSTRU l APRM HIGH FLUX SCRAM AS THE 8 RECIRCULATION I
l l
1 1
I l
l 1 PUMP WAS PUT ON.
I i
1 1
I I
I I
i 12 1 841124 l 51 0.0 l
A l I
l HC l H TEXCH I LOAD DROP FOR CONDENSER WATER BOX WORK.
I I
I I
I I
I I
I i
1 1 206.2 I
i 1
1 I
l-s (1)
(28 (3)
(4)
F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT F AILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SC RA M.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRA:4.
EVENT REPORT ( LERI D - REGULATORY RESTRICTION 4 - OTHER (EXPLAINI FILE ( NUR EG-01613 E - OPERATOR TRAINING + LICENSE EXAMIN ATION F - A DMINISTR ATIVE G - OPERATIONAL ERROR (EXPLAIN)
(5)
H - OTHER(EXPLAINI EXHIBIT I - SAME SOURCE
Docket No. 50-277 Attachment to.
Monthly Operating Report for November, 1984 REFUELING INFORMATION 1.
Name of facility:
Peach Bottom Unit 2 2.
Scheduled date for next refueling shutdown:
April 27, 1984 3.
Scheduled date for restart following refueling:
March 31, 1985 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Yes If answer is yes, what, in general, will these be?
Technical Specifications to accommodate reload fuel.
Modifications to reactor core operating limits.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
Reload 6 license amendment application submitted September 7, 1984.
6.
Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
Nonc expected.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a)
Core - 764 Fuel Assemblies (b)
Fuel Pool - 1170 Fuel Assemblien, 58 Fuel Rods 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 2816 fuel assemblies.
9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.
September, 1990 (March, 1986, with reserve full core discharge)
I
T DockSt No. 50-278 Attachm:nt to Monthly Operating Report for November, 1984 REFUELING INFORMATION 1.
Name of facility:
Peach Bottom Unit 3 2.
Scheduled date for next refueling shutdown:
March 30, 1985.
3.
Scheduled date for restart following refueling:
June 8, 1985.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Yes.
If answer is yes, what, in general, will these be?
Technical Specifications to accommodate reload fuel.
Modifications to reactor core operating limits.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
December 31, 1984 6.
Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
None expected.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a)
Core - 764 Fuel Assemblies (b)
Fuel Pool - 1212 Fuel Assemblies, 6 Fuel Rods 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 2816 fuel assemblies.
9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.
September, 1991 (March, 1987, with reserve for full core discharge)
o -
,N q
t R
L A- [ r Docket Nos. 50-277/50-278 "3
6 Attachment to Monthly w
Operating Report for
~2 November, 1984
(
g 'u ;
Peach Bditom Atomic Power Station r} %
Narrative Summary of Operating Experiences
- t s
November, 1984
,F
_7 UNIT 2 w
.,a 1
_.. i a Unit 2's Refueling / Pipe Replacement outage continues.
Both
~
' recirculation pump motors were uncoupled and removed from the drywell.
Decontamination and inspection of both recirculation pu.np shaf ts and impellers,- fitting of both.. the "A" and "B" recirculation loop ring headers, decontamination of the "A" and.
"B". loop recirculation loop valve bodies and pump bowls, removal of the recirculation pump flow splitters, replacement of two
- ~
recirculation inlet safe ends, rem < ral of two additional recirculation inlet safe ends, and t.
lactment of the
'A feedwater heater were chroiuted.
A
,4 Modification to the offgas recombiner syst., fuel inspection and full scale Recirculation and Residual Heat Removal Eystem pipe replacement continues.
k i
4 O1 UNIT 3~
l.
m.
y
}The unit began the month limited to 80% power dua to excessive ioffgas' levels.*
Q 4
On November 16, the unit was shutdown to repal: the #3 Traversit.g P
Incore Probe (TIP) machine and correct a 4 gpm\\ primary ' coolant l
4 leak inside the dry,vell.
The unit returned to service on November 12.
g;
. a.
On N$vember 14, the "B" recirculation pump tripped when water, e
T.,
leaking into a pressure switch, shorted its contact thus J
energizing the. trip circuit of the pump motor.
During the restart of the pump, the reactor scrammed on an Average Power Range Monitor,(APRM) high flux signal caused by a cold water flow i
The unit was returned to service on November 16.-
On November 24, load was reduced to 700 MWe to repair. condenser q
water box leaks.
\\.
1 The administrative power limit of 80% was increased to 85% power to to the stabilization of offgas levels.
Monitoring of of fg$n continued to ensure no further fuel damage and maintain, fuel Y
3).
6
?
integrity.
)'
,,* ~ 4 i
~
4
['
t[
j i
/SLz
\\
N
,.w
+-
4 I
0 y
1
^
, PHILADELPHIA ELECTRIC COMPANY I
2301 MARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101
'j '
1, December 14, 1984 42.si e414ooo Docket Nos. 50-277 S0-278
?
Director
~
Office of Inspection & Enforcement US Nuclear, Regulatory Commission Washington, DC 20555 Attention:
Document Control Desk
SUBJECT:
Peach Bottom Atomic Power Station Monthly Operatipo Report
)
File:
GOVT 1-1-5
~
f Gentlemen:
s.
Attached are twelve copied'of the monthly operating report for Peach Bottom Units i an6 3 for the month of November, 1984 forwarded pursuant to Technical Specification 6.9.1.C under the gu{ dance of Regulatory Guide 10.1, Revision 4.
Very truly yours, l
3 T.
Ullrich Superintendent Nuclear Generation Division i