Requests Rev to NRC 840918 SER Re Containment Purge & Vent Valve Operability.Ser Should Be Revised to Permit Reenergizing 4-inch Valves & Removal of Mechanical Limits on 8-inch Valve,Based on Posi-Seal Intl,Inc Analysis
ML20101K318
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 12/21/1984
From: Cutter A
CAROLINA POWER & LIGHT CO.
To: Vassallo D
Office of Nuclear Reactor Regulation
References
NLS-84-500, NUDOCS 8412310298
Download: ML20101K318 (3)


Text

.

D CD&L Carolina Power & Light Company DEC 311984 SERIAL:

NLS-84-500 Director of Nuclear Reactor Regulation Attention:

Mr. D. B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing United States Nuclear Regulatory Commission Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 & 50-324/ LICENSE NOS. DPR-71 & DPR-62 DEMONSTRATION OF CONTAINMENT PURGE AND VENT VALVE OPERABILITY

Dear Mr. Vassallo:

SUMMARY

By letter dated September 18, 1984, your staff issued their Safety Evaluation Report (SER) concerning containment purge and vent valve operability for the Brunswick Steam Electric Plant Unit Nos. I and 2.

Carolina Power & Light Company (CP&L) has completed its review of the SER and requests that it be revised as discussed below.

DISCUSSION Based on analysis performed by POSI-SEAL International, Inc. (provided by letter dated February 29, 1984), CP&L demonstrated operability of the 4 and 8-inch containment purge and vent valves with no physical restriction on the degree of valve opening. The analysis also determined that the 18, 20, and 24-inch valves will properly function during a enmhined LOCA and seismic event with the valve opening limited to 50 degrees or less. Though the SER discussed the larger valves, it did not address the study's findings regarding the 4 and 8 inch valves. We request that the SER be revised to permit re-energizing the 4-inch valves and removal of the mechanical limits on the 8-inch valve.

In addition, CP&L was requested to submit appropriate Technical Specifications which reflect the limitation of opening angle for the involved valves.

It is believed that such a revision to the Technical Specifications is unwarranted and inconsistent with ongoing programs to simplify and improve the Technical Specifications.

Limitation of containment purge and vent valve opening is considered a design feature and will be incorporated into the FSAR with appropriate bases. The design of the mechanical stops (see Figure 1 attached) is a stud threaded through the valve and locked in place with a lock nut such that the setting will not change, therefore, placing surveillance requirements on the containment purge and vent valves would serve no useful purpose.

In addition, some valves are inaccessible during power operation or are located in high radiation areas. Unneccessary entry of these areas is not consistent with the corporate ALARA guidelines.

'I(h 411 Fayetteville Street

  • P. O. Box 1551
  • Raleign. N C. 27602 i

B412310298 841221 DR ADOCK 050D0324 I

I FI4t

Mr. D. B. Vassallo CONCLUSION Based on the above discussion, Carolina Power & Light Company requests that the SER issued September 18, 1984 be revised to permit re-energizing the 4-inch valves (CAC-V49 and CAC-V50)'and to allow removal of the mechanical limit on the 8-inch valve (CAC-V4). Also, the Company commits to reflect the limitation of opening angle for the 18, 20, and 24-inch containment purge and vent valves in the next amendment to the Brunswick Updated FSAR in lieu of submitting a technical specification amendment request.

Should you have any questions concerning this submittal, please contact Mr. Sherwood R. Zimmerman at (919) 836-6242.

Yours very truly

$M A. B. Cut er - Vice Pre ident Nuclear Engineering & Licensing MAT /pgp (907 MAT) cc:

Mr. D. O. Myers (NRC-BNP)

Mr. J. P. O'Reilly (NRC-RII)

Mr. M. Grotenhuis (NRC)

Mechanical Stop for Restricting Valve Opening r

- Piston il ll Capscrev II f

f i

l'

/L f

E i

I

s. 1 i

Il:r-i Mechanical Step II I

\\

Actuator Hub I I Endplate is t:

a

,a a

i Piston Cartridge I

FIGURE 1 l

l l

~ 5;<

l 5.'; f.,ni

,J. g

' k' 1)i.

.,S::}VW-.

l

..s...t...

j

    • S.-@,..

./3% ; 9

-. -., - --