ML20101G713

From kanterella
Jump to navigation Jump to search
Response to NRC Second Set of Interrogatories.Certificate of Svc Encl.Related Correspondence
ML20101G713
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/19/1984
From: Johnson T, Teper D
CAMPAIGN FOR PROSPEROUS GEORGIA (EDUCATIONAL), GEORGIANS AGAINST NUCLEAR ENERGY
To:
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
Shared Package
ML20101G711 List:
References
OL, NUDOCS 8412270613
Download: ML20101G713 (10)


Text

y - -

,<.w=

g m .'.a m 41" 1 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION -

Qy qh, .

BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of ) Q 26 p 7 ,.g GEORGIA POWER CO., et al. )- Docket Nos. 50 424 aniD50.425..

  • f ra r $g;y

) .

(Vogtle Electric Generating Plant, )

M'<r * ' N c Units 1 and 2) )

i CPG /GANE'S RESPONSE TO NRC STAFF'S SECOND SET OF INTERROGATORIES Intervenors respond herein to "NRC Staff's Second Set of Interrogatories to Campaign for a Prosperous Georgia (CPG) and Georgians Against Nuclear Energy (GANE)."

Interrogatory 1: Interrogatory 1 of the Staff's " Interrogatories" dated November 1, 1984, is incoYporated by reference herein (with specific reference to Contention 8 as restated in the Board's " Memorandum and Order" dated November 5,1984).

RESPONSE: Intervenors will rely upon documents cited in " Supplement to Petition for Leave to Intervene and Request for Hearing, Campaign for a Prosperous Georgia" dated April 11,1984, in " CPG /GANE's Response to NRC Staff's Interrogatories" dated December 10, 1984 and in " CPG /GANE's Response to Applicants' First Set of Interrogatories and Reques' for Production of Documents" dated December 5,1984. In addition, Intervenors have filed interrogatories with the Applicants related to this interrogatory and will respond more fully to this interrogatory after reviewing the Applicants' response and documentation thereto.

Interrbgatory 2_: Interrogatory 2 of the Staff's Interrogatories" [ sic] dated November 1,1984, is incorporated by reference herein (with specific reference to Contention 8 as restated in the Board's " Memorandum and Order" dated November 5, 1984).

i I

8412270613 841219 PDR ADOCK 05000424 o PDR

V , ..:

RESPONSE: Response to Interrogatory 2 in " CPG /GANE's Response to NRC Staff's l

Interrogatories" dated Decembar-10, 1984, is incorporated by reference herein. .

l Interrogatory 3_: With respect to Contention-8, please state the specific structures, systems and components you allege have been affected by Applicants alleged failure to implement a quality assurance program within the context of Contention 8.

RESPONSE: The basis of Contention 8, " Supplement to Petition for Leave to Intervene and Request for Hearing, Campaign for a Prosperous Georgia," dated April 11, 1984, is incorporated by reference herein. In addition, Intervenors have filed ini;errogatories with Applicants relating to this contention and will respond more fully following review of the response thereto and the documentation therefor.

Interrogatory 4_: State the specific facts you rely upon to support the general allegations contained in Contention 8 to the effect that Applicants (a) have not properly documented the placement of concrete. (b) have not adequately tested concrete, (c) have not adequately prepared correct concrete quality test records, (d) have not procured material and equipment that meet applicable standards (e) have not protected equipment, and (f) have not taken corrective action.

RESPONSE: The basis of Contention 8 is incorporated by reference herein.

" CPG /GANE's Reply to Applicant's Motion to Correct ASLB's Memorandum and Order Dated November 5, 1984" dated November 30, 1984, is incorporated by reference herein.

The response to Interrogatory 5 (below) is incorporated by reference into this response. In addition, Intervenors have asked discovery questions of the Applicants  ;

and will file a supplement hereto based upon the responses thereto and the documentation therefor.

Interrogatory 5_: In regard to Contention 8, fully set forth (a) each document you maintain should have teen prepared that was not prepared, (b) the matters those I

. documents should have set forth, (c) each incomplete document, (d) the matters not covered that thould have been covered, (e) each test not conducted and what such 2

l tests should have covered, (f) each concrete quality test report inadequately i ,

prepared and matters ommitted therefrom, (g) each piece of material or equipment that did not' meet applicable standards, (h) each standard such material or equipment did not meet and the specific manner in which it did not meet such standards, (1) each piece of equipment not adequately protected, the inadequate protection.

  • adequate protection and every code or standard relied upon setting forth adequate protection relevant to that equipment, and (j) each instance of corrective action that was not taken that should have been talen, a full description of the details of such corrective actions, and each document, code or standard evidencing the

" corrective action" that should have been taken.

RESPONSE: The basis of Contention 8 and documents cited therein are incorporated by reference herein. " CPG /GANE's Reply to Applicant's Motion to Correct ASLB's Memorandum and Order Dated November 5, 1984" dated November 30, 1984 and documents cited thereirr are incorporated by reference herein.

Work was begun although schedules were not prepared for final release of construction and field procedures to assure that their development occurred prior to the construction activity involved.

In 1974, the Georgia Power QA manual did not adequately describe the QA program for design and procurement.

The Georgia Power QA audit planning did not include adequate visibility in that the application of all applicable QA criteria was not clear for design and j procurement.

The Southern Services, Inc. QA manual did not reflect the requirements of the then current PSAR Section 17.

The QAE Office Procedures Manual's Procedure QA-04-03 did not include .

appropriate specification evaluation checklists. At the same time, the QA manual description of organization was inconsistent with functional organization on site.

3

( .

W

~When, according to the Applicant, in-place compaction tests conducted on-site

-could'not meet the 97% compaction criteria established in the PSAR, the definition .-

cf compaction was changed; two versions of the new definition exist.

During concrete placement A-110-003 consisting of a total of 216 yards of concrete at the Unit 2 control-building tendon gallery access shaf t, it was noted on two different occasions that the concrete was allowed to accumulate at the end of the conveying pipe to a height of approxirrately 2 feet above the finish elevation.

Vibrators were then used to move the pile of concrete to the required elevation.

GPC Construction Procedure CD-T-02, Concrete Quality Control, Section 6.1.9 paragraph 3 states " Vibrators shall not'be used for transporting or moving concrete inside the form."

The QC inspector at the batch plant documents his surveillance in a daily log which is stored.in the vault under daily inspection files. Any problems encountered at the batch plant during the day of a placement are to be entered in the daily log while the other records- for the placement are filed by pour cards number. The pour card record file and the daily inspection log files must be reviewed in order to review a completed placement record. Consolidation of concrete placement files is necesSary.

Slump tests, air tests and temperature measurement were being taken at the concrete lab located beside the batch plant. After testing, the concrete was transported approximately one fourth mile to the pumping equipment, There is not further testing of the concrete. GPC Construction Procedure CD-T-02 references ACI Standards as applicable. The ACI Standards reference ASTM C-172 which makes provisions and requirements for taking samples at the point of placement. This is another example of failure to follow procedures during concrete placement.

There are voids in the auxiliary builfing concrete. The voids occur in walls which were heavily congested with reinforcing steel, embedment, pipe sleeves and blockoud. Stop work notice number SW-C-13 was issued on 20 Dec.1979 to to stop 1

4 4

l

concrete placement. ,

1

  • Fine aggregate test sieves failed to meet requirements of Criterion V of Appendix B to 10CFR50 as implemented by VNP PSAR 17.1.5 GPC Construction Procedure CD-T-02, Concrete Quality Control and referenced ASTM Standard C-136 (which require that sieves used for aggregate tests conform to requirements of ASTM Standard E-11).

The Applicant failed to follow Rebar Procedures, Construction Procedure CD-A-01 Revision 5, " Material and Equipment Receipt, Storage and Handling." Lack of inspection, improper documentation and improper identification of cut rebar appears to be in noncompliance with 10 CFR 50 Appendix B, Criterion V.

Embed assemblies in the Auxiliary Building and the Control Building suffered many defects, including: all of the plate nuts were standard hexagon nuts instead of heavy hexagon nuts; some of the bolts for a given embed plate assembly were not fully engaged with the plate nut; some of the bolts were not tack-welded to the plate nut; some of the bolts in a given embed plated assembly did not have washers; some of'the bolts having washers did not have washers tack welded to either the bolt or the end nut; some end nuts were not tack welded to the corresponding bolt; some bolts may have been bent in excess of the design drawing specified thirty degrees; and some bolts may be crackea due to excessive bending.

Three hundred spray nozzles for the containment spray systems, 44 Fisher.

Control valves and 7 albows for the reactor coolant piping system were improperly protected. Neither adequate facilities for storing the safety-related equipment nor approved procedures had been provided. The inspector made further investigation and l

determined that a "QA_ program is not in operation at Vogtle." Therefore, an l evaluation had not been made to assume that the site was prepared to receive, receipt inspect and store safety related equipment. The inspector found that although a procedure "Nonconformance Control," GD-T-01, had been written and approvcd it was not used in conjuctin with the " red hold tags" to prepare a ,

1 5 l

nonconfermance report and to provide for QA records and corrective action. In

.i

[ suneary,~ the inspector determined that the QA jprogram is not effective, auidtrs .

7 - had not been scheduled or perforred on procedures and personnel in advance of activity to assure proper receipt, inspe:: tion, storage and handling of safety-related equipment.

Based on NRC inspection No. 79-17, damage to Category I backfill andpossible undermining of Class I structure foundations as a result of 2 Nov.1979 heavy rains was not reported until 14 Nov.1979 which is an infraction of 10 CFR 50.55 (e).

I Extensive backfill repair and evaluation of the control building and Unit I and 2 reactor building foundations will be required. Moderate to severe erfosion and slumping occurred on construction slopes in the backfill. Backfill around the control building and Units 1 and 2 containment building had been severely eroded by washes and gullies with partial undercutting of some mud slabs. Seepage was visable along the south side of the Unit 2 tendon gallery wall, indicating that the foundation may have been damaged by sub-surface eriosion. The backfill contructin slope north of the auxiliary building was saturated as a result of seepage and showed evidence of partial slumping. Seepage on the backfill slope north of the auxiliary building had been ongoing since Sept. 1979. Stop Work notice SW-C-6 showed backfilling stopped as of 1 Nov.1979 because of seepage. SW-C-7 issued 9 Nov. 1979. This is compounded by surprise find of limestone area which was to be under the plant later found to have cavities, (

j Ti.e Applicant reported a potential CDR regarding the fabrication and installction of embeds to Region II on 22 Nov. 1978. All concrete work involving embeds hsti t!een stopped of, of 21 Nov.1978.

, However, on 29 Nov.1978 two QA auditors i6iirihs the auxiliary building found that empeds were being installed, a major t; Pea Nown in communication.

During excavation, "GPC QA or QC personnel had no idea what acceptance criteria was necessary for determining the proper bearing strata until they were enlightened 6

g.-w . , , . ..

P ..

.o J "

by this inspector. I feel there is a definite deficiency or lack of interest on the ..

part of GPC, QA-QC personnel toward projecting ahead into the construction schedule

  • and predetermining critical checkoff points in the construction sequence where required acceptance criterion must be met."

In addition, Intervenors have asked discovery questions of the Applicant and will file a supplement hereto based upon the responses thereto and the documentation

, therefor.

Responses to these interrogatories were prepared by Doug Teper.

Respectfully submitted this, the 19th day of December, 1984,

/

pf V * ? ,j '" W DougTper / Tim Johnson Georgians Against Nuclear Energy Campaign.for a Prosperous Georgia e

l a _ -

.1 i

I hereby affirm that the information I provided for GANE/ CPG's response to NRC  !

staff's second set of interrogatories is true to the best of my information and belief. .

This, the li day of ./ ectat " , 1984.

Douglay C. Teper a

9 L_ h .a,.A

_,..,z.-

.- --i UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION a' BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

GEORGIA POWER CO. , et al. Docket Nos. 50-424 and 50-425

=(Vogtle Electric Generating Plant, ) -

Units 1and2) )

CERTIFICATE OF SERVICE This is to certify 'that copies of the foregoing CPG /GANE's Response to NRC Staff's Second Set of Interrogatories were served by deposit with the U. S. Postal Service in the City of Atlanta for first class delivery to those listed on the attached Service List this 19th day of December,1984.

ws

[M/  %

Tim Johnson Executive Director Campaign for a Prosperous Georgia for Intervenors Campaign for a Prosperous Georgia and Georgians Against Nuclear Energy

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION -

BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

GEORGIA POWER CO., et al. ) Docket Nos. 50-424 and 50-425

)

(Vogtle Electric Generating Plant, )

  • Units 1 and 2) )

SERVICE LIST Morton B. Margulies, Chairman Atomic Safety & Licensing Appeal Atomic Safety & Licensing Board Board Panel U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Washington, D.C. 20555 Dr. Oscar H. Paris Docketing and Service Section Atomic Safety & Licensing Board Office of the Secretary U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Washington, D.C. 20555 Mr. Gustave A. Linenberger Bernard M. Bordenick, esq.

Atomic Safety'& Licensing Board Office of the Executive Legal U.S. Nuclear Regulatory Commission Director Washington, D.C. 20555 U.S. Naclear Regulatory Commission Washington, D.C. 20555 Atomic Safety & Licensing Board Panel Ruble A. Thomas U.S. Nuclear Regulatory Commission Southern Company Services, Inc.

Washington, D.C. 20555 P. O. Box 2625 Birmingham, Alabama 35202 George F. Trowbridge Ernest L. Blake, Jr.

David R. Lewis Shaw, Pittman, Potts & Trowbridge 1800 M Street, N.W.

Washington, D.C. 20036 l

James E. Jainer Sumner C. Rosenberg Troutman, Sanders, Lockerman & Ashmore 127 Peachtree Street, N.E.