I 9ff) p.

4 December 20, df86TED

';5n?C UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION '84 DE 24 20 38 BEFORE THE ATOMIC SAFETY AND LICENSING BOARD.__,. ,

f In the Matter of ) .,

)

CAROLINA POWER AND LIGHT COMPANY )

and NORTH CAROLINA EASTERN ) Docket No. 50-400 OL MUNICIPAL POWER AGENCY )

- -~~~ '--'

)

(Shearon Harris Nuclear Power )

Plant) )

APPLICANTS' PROPOSED TRANSCRIPT CORRECTIONS Applicants hereby propose that the attached changes be made to the transcript of the evidentiary (safety) hearings held in the above-captioned proceeding in order to correct material errors made in the transcription, and regaests that the Atomic Safety and Licensing Board issue an order directing that the evidentiary record be amended to incorporate said changes.

Respectfully submittled, e- -

_ Thomas A. Baxter, P.C.

SHAW, PITTMAN, POTTS & TROWBRIDGE 1800 M Street, N.W.

Washington, D.C. 20036 (202) 822-1090 Richard E. Jones Samantha F. Flynn CAROLINA POWER & LIGHT COMPANY P.O. Box 1551 Raleigh, N.C. 27562 (919) 836-7707 Counsel for Applicants Dated: December 20, 1984 8412260442 841220 PDR T

ADOCK 05000400 pyg QQ ')

r o

l PROPOSED TRANSCRIPT CORRECTIONS Page Line Change 4015 08 Change first "are" to "we" 4018 25 Change " eliminate" to " account for"

-4020 10 Change " pallets" to " pellets";

change " clad" to " cladding" 4027 19 Change "and" to "in" 4030 24 Change "Alvarez" to "Almarez" 4031 01 Change "Alvarez" to "Almarez" 4031 05 Change "Ringos" to "Ringhals" 4031 18 Change "Kirsto" to "Krsko" 4035 16 Insert "of" following " phase" 4037 18 Delete "over the" following " point:"

4037 19 Delete " monitoring" following " parts" 4051 23 Insert " heat" following " generator" 4056 23 Change "ABT" to "AVT" 4057 16 Change "quadrifoil" to " quatrefoil" 4073 10 change "ABT" to "AVT" 4073 12 Change "ABT" to "AVT" 4094 18 Change "Ki" to " Chi" 4126 05 Change " distribution tubes" to

" tube distribution" 4126 10 Insert "to" following " easiest" 4148 20 Change "two " to " tube" 4151-52 17 Change " iterating" to " emergency"

r a

Page Line Change 4220 08 Change " national" to " natural" 4220 09 Change " regulation" to " circulation"

~

4221 11- Change " tubal" to "two loop" 4252 15 Change " August" to " October" 4253 16 Change " facing" to " facings" 4256 14 Change "A&I" to "ANI" 4274 08 Change " description of fire prevention system" to " Description, Fire Protection System" 4282 01 Change " values" to " barriers" 4282 13 Insert comma (",") following " initiation";

delete "from"; insert " fire" following " prompt" 4282 14 Change " protection" to " detection" 4282 15 Change "confinable" to " confinement of" 4282 16 Change " insures" to " assures" 4283 11 Insert "A." before "What" 4284 19 Change " supervision" to " permission" 4383 12 Insert "Q." before "I'm" 4417 13 Change "a water-type door" to "or water-tight doors,"

4417 14 Change " pressure then" to " precedence" 4417 15 Change " department" to " requirement" 4417 16 Insert "special" following "these" 4417 17 Change "usually" to " usual" 4419 15 Change " REB" to "RAB" 4419 17 Change "each" to " inch" 4432 23 Change "11-20-28" to "11-20-78"

.o Page Line Change 4441 02 Change "for" to "per" 4441 05 Change "of" to "such" 4448 17 Change "under" to "on";

change comma (",") to period (".")

4448 18 Change "the" to "The" 4463 12 Insert "know" following first "not" 4463-A 14 Insert "know" following " don't" 4472 22 Change " CAR-SH-AH--AS48" to " CAR-SH-AS-48" 4514 02 Change "1-A valve" to "l-A-BAL" 4524 Il Change " absorber" to "adsorber"

, 4527 05 Insert "anything" following " accept" 4528 25 Change "following" to "followed";

change "whole" to " hose" 4534 15 Change " tables" to " cables";

insert "are" following "that" 4534 23 Change " tables" to " cables" 4597 03 Insert "more" following "become" 4604 02 Insert "their" following "to" 4834 19 Change second "of" to "or" 4836 20 Insert "in the proportional statements on page 8." following "plus" 4836 21 Delete "up" following " data" 4836 24 Change " paper" to "prefiled testimony" 4839 10-14 Change "(Whereupon, Applicant's 8, having been previously marked for identification was received in evidence.) (The document follows:)" to "(The testimony of Messrs.

Miller and Dakin in response to Eddleman Contention 9C, Thermal Aging of RTDS, follows:)"

Page Line ' Change i 4840 14 Change "in" to "and" 4841 11 Change "so" to "but" 4842 08 Delete " allowed" following "were" 4843 04 Change "of" to "in" 4843 12 Change " chance" to " change" 4843 19 Change second "of" to "or" L 4844 01 Change " qualifying" to " qualified" 4846 25 Change " robing" to " roving" i

4847 20 Change "This" to "These";

I change " paper was" to " papers were" 4847 22 Change "it's" to "they are" 4848 08-09 Change "Which is -- here the chemical reaction" j to "The report refers to the effect" 4848 17 Change " controlled," to "the" 4848 18 Ch'ange " reaction" to " process,";

delete comma (",") following " occur" 4866 21 Change " Described" to "As described";

insert "it is" following "3,"

4868 13 Insert "is" following "part" 4868 14 Insert " Type 316" following "is" 4879 19 Change " calvin" to " Kelvin" 4880 12 Change "flexual" to " flexural" 4880 14 Change "of" to " relative to";

change "flexual" to " flexural"

[

4886 09 Change "or" to "for";

change "1-A" to "1-E" 4892 15 Cnange " silicon" to " silicone"

Page Line Change 4893 '06 Change period (".") following "' study'"

to comma (",")

4893 07 Change " guess we" to " guess. We" 4893 25 Insert "that" following " enclosure" 4894 15 Insert " JUDGE KELLEY" before "Over" 4903 07 Change "in" to "and" 4906 18 Change " position" to " possession" 4914 17 Change "they" to "which" 4915 25 Insert "the" following "to" 4918 14 Change " packet" to " bracket" 4919 10 Change "the manufacturer of the data" to " data from the manufacturer" 4919 17 Insert "at" following "is" 4924 23 Insert "to be" following "needs" 4925 17 Change "megaohms" to " megohms" -

4925 24 Change "with the other components,"

to "into the resin with" 4937 22 Change "I" to "It" 4946 13 Change "think" to " thing" 4949 16 Change " magnesium" to " magnesia" 4949 17 Change "clorox type piers" to "Corox type heaters" 4955 11 Change "flexual" to " flexural" 4955 13 Change "flexual" to " flexural" 4962 09 Delete "and" following " insulation" 4967 06 and Change "Pronty" to "Prunty" passim L

Page Line Change 4969. 15 Change "a" to "and" 4973 16 Change "better" to " vendor" 4973 20 Change " instrumental" to " instrument" 4974 04 Change "IEE" to "IE" .

4974 17 Insert "of" following " Qualification" 4975 16 Change "in" to "and" l 4979 04 Change " standard" to " stander" 4980 11 Change " reaction" to " reactor" 4983 05 Change "I." to "IE" l

l 4992 01 Insert "Q" before "Then" 1

4997 03 Change " values" to " valves" 4997 04 Delete first "is" following "that" l 4997 12 Change " values" to " valves" 4999 04 Change "9.4. A" to "9-4, (a)"

5005 01 Change "our" to "your" 5027 12 Change "A" to "8" 5030 12 Change "is" to "if" 5031 12 Change " installation" to " insulation"

$036 03 Change "or" to "of" 5053 01- Change "were" to "you" 1

5056 16 Change "QE" to "EQ" ,

5058 08 Insert " safety" following "EBASCO's" 5059 15 Change "and I" to "in IE"*

5091 01 Change " belt" to " valve" 5091 06 Change " contract" to " contact" i

i i

~

'___.,-,-,,,-, , - > _ - - - --e- - -

Page Line Change 5095 04 Change second "8" to "9" 5095 17 Change "the" to "that" 5095 24 Change "do" to "did" 5100 04 Change." MILLER" to "O'NEILL" 5103 01 Change "than" to "in" 5103 13 Change "NRC" to "in our" 5109 07 Change "85/87" to "8587" 5116 08- Change " rank" to " rack"

'5121 20 Change "- " to " calculation" 5124 07 Change first " year" to "five" 5125 10 Change " aging which we" to " aging. We";

insert "it" following " suspect" 5140 02 Delete "of" following " temperature" 5144 22 Change "Cluss" to " Cliffs" 5150 02 Change "Now" to "How" 5151 16 Change "is" to "as" 5154 10 Change " plots" to " pots" 5154 20 Change "AD" to "ITT" 5155 18 Delete "Q." before "And" 5155 24 Change "AD" to "ITT" 5157 25 Change "Prunty" to "Yandow" 5168 24 Change " ion" to "IR" 5168 25 Insert "by longer time periods."

following " separated" 5173 20 Change " going" to "doing"

, s -- -- .,

t Page Line Change 5175 15 Change "accurance" to " accuracy" 5175 25 Insert " resistance" following " insulation" 5178 13 Change " tie" to " type";

change "they" to "that" 5178 14 Change "they" to "that" 5179 16 Change "than the" to " vendor" 5181 06 Change " thermal coupler" to " thermocouple" 5181 08, 10 Change "Anoconda" to " Anaconda" 5183 22 Delete period (".") following " reference";

change "Four" to "for the" l 5184 03 Delete "a" following "is" l 5184 04 Insert "that" following "and" 5188 17 Change "four" to "for" 5189 03 Change " LOC 0" to "LOCA" 5190 25 Change "make" to " recommend" 5192 19 Change " table" to " paper"

( 5196 10 Change "or" to "of" 5196 11 Change "would like to add" to " looked at" l

5201 05 Change "what" to "want";

change "whether" to "what";

change "they" to "the";

delete "the" following " jacket" 5201 06 Change "or" to "are" 5211 22 Insert "of the" following " resistance" 5212 09 Insert "done" following " calibration" l 5214 18 Change "where" to "for" t

i 5215 15 Change " diamine" to " diene" i

Page Line Change l

t . 5215 16 Change " diamine" to " diene"

( -

5216 15 Insert "to limit" before " leakage" 5217 15 Change "used" to "use; but" 5219 18 Change " thermal couple" to " thermocouple" 5221 12 Change second "that" to "the";

change "would stand" to " withstand" 5224 21 Change " Alters" to " Audits" 5225 10 Change comma (",") following first " volts" to "or" 5225 11 Change " thermal coupler" to " thermocouple" 5229 22 Change "an immuned" to "a minimum" 5235 01 and Change "McNEILL" to "O'NEILL" passim 5236 06 Change "and" to "on" 5236 07 Change "in" to "on" 5237 02 Insert "a" following " transmitter,"

5237 16 Change " met" to " meant" 5238 11 Change " essentially" to "substantially" 5243 23 Change "second, but it wasn't" to "second shift, which was" 5243 24 Change "and" to "but";

insert "during" following "not";

change " responsibilities" to " time" 5382 23 Change " procedure" to " procedures" 5386 14 Change "if" to "is" 5389 07 Change " insulation" to " installation" 5389 07 Change " insulation" to " installation" 5389 25 Change "of" to "or"

-9

l Page Line Change 5395 21 Change "using -- low" to "used in all" 5403 16 Change "is" to "as" 5406 04 Delete "in" following " design" 5407 08 Insert "that" following " criteria" 5407 12 Change "it" to "there" 5408 02 Delete "is a" following "itself";

change " function" to " functions" 5414 13 Change " hole" to " hold" 5414 14 Change " hole" to " hold" 5422 21 Change "the" to "then" 5423 10 Change " Quote" to "Quite" 5423 18 Change " condition" to " conditional" 5426 01 Change " type" to " common types" 5428 05 Delete "not" following " don't" 5442 09 Insert "for" following "because" 5442 22 Change "and" to "in" 5443 01 Change "and" to "in" 5443 02 Change " Mobile" to " Mobil" 5443 07 Change " Mobile" to " Mobil" 5443 08 Insert "an" following "in" 5443 12 Change "QE" to "EQ" 5444 11 Insert " site" following "the" 5445 06 Change " revealing" to " reviewing" 5454 03 Change "the value" to "a failure" 5463 25 Change "Pam" to "PAM" I

L .

4.

Page Line Change 5463-A 13 . Change "McLean" to "Bucci"

'5465 25 Change'"McLean" to "Bucci" 5466 12- Change "and" to "in" 5478 16 Change " field" to " seal" 5485 20 ' Insert " function" following "the" 5490 25 Change "that" to "what" l

5496 19 Change "back" to "back-up" 5499 18 Insert'"not" following "that's" 5501 06 Insert "IEEE" following second "it's" 5501 08-09 Change " installation" to " insulation" 5501 09 Change " ground" to " wound" 5501 10 Change " motor rad" to "motorette" 5501 12 Insert "the requirement referred to is"

! following "this."

f 5501 20 Delete "NSSS" following second "a" 5513 24 Insert "Yes." following "Prunty)"

5516 12 Change "Bensen" to "Benson" 5516 13 Change "Saursaw" to "Salazar" 5519 01 Change " walk" to " work" 5519 23 Insert " master list" following " equipment";

insert " qualification" following second "and" 5521 07 Delete "Arrhenius" following first "the" 5525 09 Change "were" to "we are" 5529 03 Change " triangular" to " triennial" 5529 05 Change " supplies" to " suppliers" t

i l

l ..

~

'% *i3:

M, .

,. , e

') . } ,

  1. 5 7 "Y h, , j

.. y, Page Line Change 5529)] 1) 2, Change " facilities" to " facility" 5530 06' (".")

Change question mark ("?") to period 5531 05 Change "you" to "use" 5541 ;25 Insert "of" following " deterioration"

) i 5543 04 Change 7s'uggested" to " subjected"

\ i

,. , '! 5553 20 Change " engineering" to " engineer" 5553 .20 Delete "an" following "If"'

5555 04 Chanbge "A" to "Q" 5555 16 Change " quality" to " qualify" 5555 19 Insert "or" following " vendor" 5557 05 Change " vendor" to " vendor's";

insert " performance" following " current" 5561 03 Change " quality" to " qualify" 5563 02 Change " rest" tc<" test" 5563 15 Change " values" to " failures" 5564 04 Change "grouns" to " groups" 5589 07 Change "their" to "they are" 5753i 19 Change "by" to ".of"

, 3.5777 .17 Change "at" to "and" tg i'5781 14 Change "put" to "took" 5781 16

's Change " wax" to 7was"

'r' \

5793 03 Change "NE" to "E&E"

( i

-! j. 5796 13 Change " hearings" to " conferences"

%A 5796 14 Change "ASC" to "ASCE"

.,ty , b 5796 .25 Change "representati" to " representative.

experience" t .

A '

+ w,

.r* '

,.Page Line Change 5800 09 Change "219002" to 216002" 5809 02 Change "is a full Harris" to "at Harris it is a full" 5809 03 Change "they" to "you" 5809 04 Change "on" to "of" 5821 01 Change "61-1-H" to "65-1(h)"

5823 16 Change "56-4-E" to "65-4(e)"

5858 03 Change "now" to "not" 5865 19 Change "and" to "in" 5905 15 Change " understand it's in" to

" standards or codes" 5942 01 Change "preconsecutive" to "three consecutive" .

5956 14 Change "4" to "5" 6009 22 Change " book" to " bulb" 6016 03 Change "this is a" to "55 degrees is the" 6026 17 Change "A" to "Q" 6070 11 Change "whereas" to " clearance" 6086 10 Change "without" to "with" 6087 05 Change " pours" to " cores" 6091 18 Change "still" to " stiff" 6130 14 and Change "Vogel" to "Vogtle" passim

'6188 05 Change " increased stress" to "in prestressed" 6214 13, 14 Change "Eddleman" to " Applicants" 16 6225 11 Change "and" to "in a"

l Page Line Change l 6263 '25 Change " surface" to " service" 6264 03 Change " surface" to " service" 6264 06 Change " surface" to " service" 6270 10 Change "about a" to "of out of" 6282 20 Change "May" to " August" 6283 23 Insert "a" following "not";

change " tight" to " type" 6287 25 Change " surface" to " service" 6367 09 Change second "in" to "an" 6403 15 Change "6496" to "6596" (twice) 6664 11 Change " paper" to " pipe" 6664 17 Change " paper" to " pipe" 6664 22 Insert "in" following " Subsequently,"

6666 09 Insert " engineering" before "in" 6674 13 Change "which - " to "these" 6681 14 Change "to" to "through";

Change " control" to " controlled" 6686 07 Change "to" to "through" 6690 13 Change "EDDLEMAN" to "BAXTER" 6700/ 23 Change "determinent" to " determined" 6701 6706 23 Insert " weld" following "on";

Change " simple" to " symbol" 6724 18 Change "put into" to " pertained to" 6724 19 . Change "put into" to " pertained to" 6734' 15 Change "a" to "the"

.o Page Line Change 6734 16 Change "a" to "the" 6737 09 Change second "in" to "an" 6762 19 Change "New Selection" to " Installation" 6767 09 Change "in formed" to "and form" 6767 14 Insert'"on" following "only" 6769 09 Insert "to" following "go" 6779 09 Change "rewored" to " rework" 6780 05- Change " Idea" to "I.D."

6787 05 Change " welding" to " weld mapping"

, 6802 05 Change " shock" to " shop" 6811 18 Change "Chiange " to "CI" 6823 02 Change "for" to "by" 6902 04 Change "SCR" to "FCR" 6923 24 Change "dats" to " days" 6932 03 Change " Shake" to "Shaikh" 6934 18 Change "NVEP605" to "NDEP-605" 6947 01 Change " cite" to " site" 6950 01 Change " Trimmer" to " Trammel" 6964 23 Change "B-3011" to "B-31.1" 6965 02 Change "D-ll" to "D-1.1" 6965 15 Change "to" to "and" 6979 06 Change " Fuller" to "Timberlake#

6979 18 Change " Fuller" to "Timberlake" 6981 08 Change " Fuller" to "Timberlake"

a

-s Page Line. Change 6981 13 Change " Fuller" to "Timberlake" 7008 11 Change " weld define" to "well defined"

-7026 21- 'Ch'ange " report" to " refer" 7028 15 Change " approve" to "are through with"

-7029 20 Change "9.37" to "99.37" 7034 06 Change " Berg and" to "Bergen" 7034 10 Change " reconsideration" to " reconciliation" 7034 22 Change "D-11" to "D-1.1" 7035 23 Change "does" to ','goes" 7036 03 Insert "III" following "Section" 7038 21 Change " assessing that" to " assisting" 7053 25 Change "to" to "through" 7055 13 Change "25" to "26" 7055 17 Change "25" to "26" 7055 20 Change "25" to "26" 7089 01 Change "GIBSON" to "BAXTER" 7112 24 Change " joint" to " general" 7119 23 Change " relate" to " late" 7123 10 Change "at" to "the";

change "give" to "gave" 7129 22 Change "NDP-601" to "NDEP-601" 7143 18 Delete "and" following "ASNT" 7158 04 Change " welder" to " inspector";

change " poor" to " pore of" 7190 17 Change "in-caps" to "end caps" Page Line Change 7271 23 Change "S-4-H-208" to "SA-H-208" 7369 02 Insert " testimony" following "prefiled" 7370 23 Insert "If".following " Staff.";

Change " perceive" to " receive" 7370 24 Change " findings. That" to " findings, that";

Change "was" to "will be" i ,

a 1

l i

December 20, 1984 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

CAROLINA POWER AND LIGHT COMPANY )

and NORTH CAROLINA EASTERN ) Docket No. 50-400 OL MUNICIPAL POWER AGENCY )

)

(Shearon Harris Nuclear Power )

Plant) )

CERTIFICATE OF SERVICS I hereby certify that copies of " Applicants' Proposed Transcript Corrections" were served this 20th day of December, 1984, by deposit in the U.S. mail, first class, postage prepaid, uptn the parties listed on the attached Service List.

Thomas A. Baxter Date: December 20, 1984

4 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD l In the Matter of )

)

CAROLINA POWER & LIGHT COMPANY ) Docket Nos. 50-400 OL and NORTH CAROLINA EASTERN ) 50-401 OL MUNICIPAL POWER AGENCY )

)

(Shearon Harris Nuclear Power )

Plant, Units 1 and 2) )

SERVICE LIST James L. Kelley, Esquire John D. Runkle, Esquire Atomic Safety and Licensing Board Conservation Council of U.S. Nuclear Regulatory Commission North Carolina Washington, D.C. 20555 307 Granville Road Chapel Hill, North Carolina 2751 Mr. Glenn O. Bright M. Travis Payne, Esquire Atomic Safety and Licensing Board Edelstein and Payne U.S. Nuclear Regulatory Commission P.O. Box 12607 Washington, D.C. 20555 Raleigh, North Carolina 27605 Dr. James H. Carpenter Dr. Richard D. Wilson Atomic Safety and Licensing Board 729 Hunter Street U.S. Nuclear Regulatory Commission Apex, North Carolina 27502 Washington, D.C. 20555 Charles A. Barth, Esquire Mr. Wells Eddleman Janice E. Moore, Esquire 718-A Iredell Street Office of Executive Legal Director Durham, North Carolina 27705 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Docketing and Service Section Richard E. Jones, Esquire Office of the Secretary Vice President and Senior Counsel U.S. Nuclear Regulatory Commission Carolina Power & Light Company Washington, D.C. 20555 P.O. Box 1551 Raleigh, North Carolina 27602 Mr. Daniel F. Read, President Dr. Linda W. Little CHANGE Governor's Waste Management Boaro P.O. Box 2151 513 Albemarle Building Raleigh, North Carolina 27602 325 North Salisbury Street Raleigh, North Carolina 27611 l

I

Brtdlcy W. Jonso, EEquira

  • U.S. Nuclear Regulatory Commission Region II . .

101 Marrietta Street Atlanta, Georgia 30303 Steven F. Crockett, Esquire Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. Robert P. Gruber Executive Director Public Staff - NCUC P.O. Box 991 Raleigh, North Carolina 27602 Administrative Judge Harry Foreman Box 395 Mayo University of Minnesota Minneapolis, Minnesota 55455 e

i

-- - . _ .