ML20101E785

From kanterella
Jump to navigation Jump to search
Corrected Monthly Operating Rept for Aug 1984
ML20101E785
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 09/14/1984
From: Matthews T
OMAHA PUBLIC POWER DISTRICT
To:
Shared Package
ML20101E775 List:
References
NUDOCS 8412260401
Download: ML20101E785 (1)


Text

4 Y

eJ , ,

OPERATING DATA REPOR1 DOCKET NO. 50-285 DATE Septater 14,19I COMPLETED BY T. P. Futthews TELEPHONE 402-526-4733 OPFR ATING STATUS

1. Unit Name: Fort Calhoun Station 'Nate$
2. Reporting Period: August, 1984
3. Licensed Thermal Power (MWt):

1500

4. Nameplate Rating (Gross MWe): 501 .
5. Design Electrical Rating (Net MWe): 478
6. Maximum Dependable Capacity (Gross MWe): 501
7. Maximum Dependable Capacity (Net MWe): 478 '
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons: 1 N/A l i 9. Power Lesel To Which Restricted.If Any INet MWel: N/A N j
10. Reasom For Restrictions.If Any: None This Month Yr..:o Date Cumulative ll. Iluurs in Reporting Period 744.0 5,855.0 95,857.0
12. Number Of flours Reactor Was Critical 744.0 2,778.1 72,672.0
13. Reactor Resene Shutdown flours 0.0 0.0 1,309.0
14. Ilaurs Generator On L.me 744.0 ' 2,6 75. 7 _ ,,, 72,078.2
15. Unit Resene Shutdown Hours 0.0 0.0 0.0
16. Grow Thermal Energy Generated IMWil) 1,103,037.0 3,713,208.0 90,472,921.7
17. Grow Electrical Energy Generated IMhHI 365,278.0,,, 1,196,320.0 29,513,889.0
18. Net Electrical Energy Generated IMWill 3477887.0 1,135,409.0 ,28,215,277.7
19. Unit Senice Factor 100.0 45.7 75.2
20. Unit Availability Factor 100.0 E.7 E.2
21. Unit Capacity Factor (Using MDC Neti 97.8 40.6 64.2 61.f
22. Unit Capacity Factor iUsing DER Neti 97.8 40.6
23. Unit Forced Outage Rate -

O6 j 3.5 l

24. Shutdowns Scheduled Oser Nest 6 Months IT)pc. Date.aad Duration of Facht:

None

25. If Shut Down At End Of Report Period. Estimated Date of Startup. N/A
26. Units in Test Status (Prior to Commercial operationt N/A Forecast Achiesed INITIA L CRITICA LITY INITIAL ELECTRICITY COMMERCI AL OPFR ATION 5 y,g-,

PDR a

Y '[-_.--