Monthly Operating Rept for Nov 1984
ML20101D887
Person / Time
Site: Catawba 
Issue date: 11/30/1984
From: Reavis J, Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 8412260066
Download: ML20101D887 (4)


Text

.

OPERATING DATA REPORT DOCKET NO.

50-413 DATE' _12-14-84 COSIPLETED BY _ J. A. Reavis TELEP110NE 7na 473-7567 OPERATING STATUS f;

Catawba.1-Notes

  • Nameplate Rating
1. Unit Name:
2. Reporting Period:

November 1 - November 30, 1984 (Gross MWe) calculated as

3. Licensed Thermal' ower (51Wt):

3411 1450.000 MVA x.90 power P

4. Nameplate Rating (Gross SIWE):

1305-factor per Page lii, NUREG-0020.

5. Design Electrical Rating (Net SIWE):

1I45

6..\\taximum Dependable Capacity (Gross SIWE):

I145

7. Afaximum Dependable Capacity (Net SIWE):
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report.Give Reasons:

None

9. Power Level To Which Restricted. If Any (Net 31We):
10. Reasons For Restrictions.If Any:

This Sionth Yr..to.Date Cumulative

11. Hours in Reporting Period
12. Number of Hours Reactor Was Critical
13. Reactor Reserve Shutdown flours
14. Hours Generator On Line
15. Unit Reserse Shutdown Hours
16. Gross Thermal Energy Generated (31WH)

.17. Gross Electrical Energy Generated (.\\lWH)

Not in Commercial Operation IS. Net Electrical Energy Generated (31WH)

19. Unit Service Factor

~

20. Unit Availability Factor
21. Unit Capacity Factor (Using.\\lDC Net)
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Stonths (Type.Date.and Duration of Eschi:
25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status IPrior to Commercial Operation):

Forecast Achiesed INITIAL CR)TICALITY 01-09-85 INITIA L ELECTRICITY 01-19-85 C0\\l%IERCIAL OPERATION 03/85 10/77)

Db 0

3 I

R PDR

/

CATAWBA NUCLEAR STATION Pressurizer Power Operated Relief Valve (PORV) and Safety Valve Challenges UNIT DATE VALVE # (*)

  1. OF CHALLENGES 1

11-24-84 INC-328 (*)

1 1

11-24-84 INC-34A (*)

1

  • S - SAFETY VALVE P - PORV

CATAWBA NUCLEAR STATION Monthly Operating Status Report 1.

Personnel Exposure For the month of October, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.

2.

The total station liquid release for October has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

The total station gaseous release for October has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

L

'f Dums Powna COMPANY F o. mox 00189 CHARLOFFE, N.O. 98848 MALB. TUCKER Tatarnown vorm eummamas, (704) 373-48th

= = =*=-

December 14, 1984 1

rector

-Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Attention: Document Control Desk, Ret Catawba Nuclear Station Docket No. 50-413 Dear Sir Please find attached information concerning the performance and operating status of the Catawba Nuclear Station for the month of November 1984.

Very truly yours, Hal B. Tucker JAR:scs Attachments cc Mr. J. P. O'Reilly, Regional Administrator American Nuclear Insurers U. S. Nuclear Regulatory Commission c/o Dottie Sherman, ANI Library Region II The Exchange, Suite 245 101 Marietta Street, Suite 2900 270 Farnington Avenue Atlanta, Georgia 30323 Farmington, Connecticut 06032 Mr. Phil.Ross Robert Guild, Esq.

U. S. Nuclear Regulatory Commission Attorney-At-Law MNBB-5715 P. O. Box 2097 Washington, D. C.

20555 Charleston, South Carolina 29412 INPO Records Center Palmetto Alliance Suite 1500 21351s Devine Street 1100 circle 75 Parkway Columbia, South Carolina 29205 Atlanta, Georgia 30339 Ms. Judy Dovers NRC Resident Inspector Nuclear Assurance Corporation Catawba Nuclear Station 5720 Peachtree Parkway Norcross, Georgia 30092

/