Commonwealth litison Company Quad Cities Generating Mation s
22710 206th Asenue North Cordova, 11.61242-9740 Tel 3v>-6s 1-221:
ESK-%-032 March 15,1996 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Atta: Document Control Desk
Subject:
Quad Cities Nuclear Power Station Unit 2 Submittal of Core Shroud Reinspection Plan for Quad Cities Unit 2 NRC Docket No. 50-265
References:
(1)
BWRVIP Guidelines for Reinspection of BWR Core Shrouds (BWRVIP-07), dated February 1996.
(2)
Comed Response to NRC Generic Letter 94-03, "Intergranular Stress Corrosion Cracking of Core Shrouds in Boiling Water l
Reactors", Quad Cities Unit 2 Core Shroud Inspection Plan, dated January 16,1995.
1 (3)
J.L. Schrage (Comed) to USNRC letter, Quad Cities Unit 2 Core Shroud Examination Results, dated May 2,'1995.
l The purpose of this letter is to provide the Reinspection Plan of the Repaired Core Shroud for Quad Cities Unit 2.
Comed has reviewed the BWRVIP " Guidelines for Reinspection of BWR Core Shrouds" (Reference 1) and has concluded that sect:on 4, " Reinspection of BWRs with Repaired Core l
Shrouds" is applicable to Quad Cities Unit 2, which is a Category C plant with a repaired core shroud.
Quad Cities Station implemented repair of the core shroud during refuel outage Q2R13 and in conjunction, performed extensive pre-repair inspections of the core shroud as committed to in our response to USNRC Generic Ixtter 94-03 (Reference 2). The results of the pre-repair inspections were transmitted per Reference 3.
l During the upcoming refuel outage Q2R14 and during future refuel outages, Quad Cities Station currently plans on inspecting the repaired core shroud in accordance with the BWRVIP recommendations.
1 I
l 9603210135 960315 PDR ADOCK 05000265 i
o eda do l
A Unicom Company k
l
_ _ _. _ _ = _ _ _ _ _ _ _.
iU.S.NRC 2
March 15,1996 a
e Repair Component inspections A minimum of 25 percent of the repair components (one tie-rod assembly) will be VT-3 visually examined to verify accessible locking devices, contact points / gaps, bolt tightness and in general, overall condition. The VT-3 examination will be performed as defined in the ASME Section XI 1989 edition.
Repair Anchorace Inspections The repair hardware is anchored directly to the shroud support plate and as such there are no load bearing welds as defined in the Guidelines, therefore no inspections of load bearing welds are planned. The repair hardware anchorage inspection is included in the Repair Component Inspections.
Core Shroud Weld Insoections The horizontal circumferential shroud welds (H1 through H7 inclusive) are structurally replaced by the previously installed repair. Therefore, n'o future inspeedons are required.
During the upcoming Q2R14 refuel outage, no inspections are planned for the vertical shroud welds. Prior to installation of the repair hardware, extensive examinations of the vertical welds were performed with no reportable indications (Reference 3). Based on the Guidelines, no inspections are required at the first outage following repair using Option B requirements as approximately 36 percent of the total equivalent vertical weld length was examined versus the 25 percent required, in accordance with Reference 1, Quad Cities Station currently plans to examine at least 25 percent of the cumulative length of all vertical welds during the Q2R15 refuel outage.
During the upcoming Q2R14 refuel outage, no inspections are planned for the ring segment welds. Prior to installation of the repair hardware, extensive examinations of the ring segments and ring segment welds were performed with no reportable indications associated with the ring segment welds (Reference 3). Based on the Guidelines, no inspections are required at the first outage following repair using Option B requirements as 100 percent of the accessible portions of the ring segments were examined versus the 25 percent required. In accordance with Reference 1, Quad Cities Station currently plans to examine at least 25 percent of the cumulative length of all accessible ring segment welds during the Q2R15 refuel outage.
In summary, a minimum of one shroud repair assembly (e.g. one tie-rod) will be visually inspected per the requirements of Reference 1. Based on the results of the extensive pre-repair inspections performed during Q2R13, no additional shroud weld inspections will be performed during the upcoming Q2R14 refuel outage. This reinspection plan is in accordance with the recommendations provided in the BWRVIP Guidelines.
In regard to the recent issuance of the BWRVIP Guidelines to the industry and to the regulatory agencies, Comed will review future revisions to the Guidelines including the pending safety evaluation report and may adjust the reinspection plan as necessary. Future
bU.S.NRC 3
March 15,1996 reinspections of the repaired core shroud (including repair hardware) will be performed in accordance with the BWRVIP " Guidelines for Reinspection of BWR Core Shrouds" (Reference 1).
Please address any further comments or questions regarding this matter to this office.
Respectfully,
- h. l E. S. Kraft, Site Vice President Quad Cities Station l
cc:
II.J. Miller, Regional Administrator - Rll!