ML20101C980

From kanterella
Jump to navigation Jump to search
TMI Alert Second Listing of ASLB Notifications of Documents Contained in Joint Mailgram Exhibit.Certificate of Svc Encl
ML20101C980
Person / Time
Site: Crane Constellation icon.png
Issue date: 12/19/1984
From: Bernabei L, Doroshow J
CHRISTIC INSTITUTE, GOVERNMENT ACCOUNTABILITY PROJECT, THREE MILE ISLAND ALERT
To:
References
CON-#484-728 SP, NUDOCS 8412210263
Download: ML20101C980 (9)


Text

  • -

TMIA 12/19/84

_ _).

00FKElE0

.r v5Snv UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION 84 CEC 20 N0:05 CFFICE OF SECRETAF" BeforetheAtomicSafetyandLicensing0gfljjjjWI In-the Matter of

)

)

METROPOLITAN EDISON COMPANY

)

~*

)

(Three Mile Island Nuclear

)

Docket No. 50-289 -T/3 Station, Unit 1)'

)

(Restart Romand - Management

)

Phase)

)

THREE MILE ISLAND ALERT'S SECOND LISTING OF BOARD NOTIFICATIONS Intervenor Three Mile Island Alert ("TMIA") hereby submits its second listing of notifications to the Atomic Safety and Li-censing Board of documents contained in the Joint Mailgram Exhi-bit stipulated into evidence by the parties.

(All Citations are to Items contained in Joint Mailgram Exhibit 1(c).)

Awareness of Pressure Spike and/or Containment Sprays on 3/28/79:

Joint Mailgram Exhibit ("JME") 10 at page 22;

)

l JME 19 at 24;

]

JME 23 at 20,26; JME 33 at 3-4;-

JME 37 at-51-52; JME'72 at 27-27; I

.JME 75 at 260, 8412210263 B41219 PDR ADOCK 05000289 JME 83 at 31-32; g

PDR 1

I JME 85 at 25-26; JME 93 at 28-29; MSd i

' I, JME 122 at 112, 114-115, 117-118, 125-127; JME 124 at 54; JME 138 at 100-104; Discussion of and/or concern about core uncovery on 3/28/79:

JME 10 at 17; JME 23 at 22; 23 (Tapes 159 and 160) at 60; JME 26 at 19-20; JME 72 at 17-18; JME 80 at 59; JME 83 at 17-20, 25; JME 84 at 14-15, 17; JME 93 at 11-12; JME 118 at 45-46; JME 122 at 144; JME 138 at 97; Awareness that operating plant outside emergency and operating procedures and beyond training on 3/28/79.

JME 9 at 25; JME 10 at 2, 24-26; JME 122 at 3, 133; JME 138 at 97, 125, 151.

Offsite Releases.

JME 10 at 24; JME'23 at 22, 26, 29; JME 26 at 10, 12, 17-18.

7 Seelinger's Role on 3/28/79.

JME110 at 13; JME 23 (Tapes 159 and 160) at 14.

Time G. Miller left to travel to Lieutenant Governor's Briefing.

JME 10 at 21; JME 95 at 18.

G. Miller put Logan in charge at time Miller left; gave instructions not to change status of reactor.

JME 23 at 20; JME 138 at 132.

Taking incore thermocouple temperature readings on 3/28/79.

JME.10'at 15; JME 23 (Tapes 159 and 160) at 55-60.

JME 59 at 12-13; JME 83 at 14-17; JME 85 at 11-17; JME 93 at 23; JME 95 at 4-5; JME 122 at 37-38, 61, 64-65, 67-69, 73, 75-79.

Taking of incore thermocouple temperature readings on 3/29/79.

JME 4 at 59-60, 70, 73-74; JME 85 at 22-23; JME 93 at 12.

Incore thermocouple temperatures known to G. Miller, Herbein, Arnold, and think tank on 3/28/79; understanding that those temperatures in excess of ECCS criteria and indicated core un-covery.

JME 18 at 49-50; JME 23 at 37, 75; JME 30 at 44; JME 37 at 52-53; JME 59 at 10-11, 13; JME 61 at 15-16; JME 72 at 21-22; JME 73 at 15; JME 82 at 17-18; JME 95 at 8, 17, 34, 49-50; JME 118 at 28; JME 122 at 77; JME 138 at 147-149.

Incore thermocouple temperatures believed to be indicator of core temperatures and possible core uncovery on 3/28/79.

JME 23 (Tapes 159 and 160) at 55-56; JME 85 at 25, 32, 34-37; JME 122 at 67.

Meeting in afternoon of 3/29/79.

JME 37 at 50-51; JME 72 at 24-26; JME 80 at 73-77; JME 118 at 54-55.

t

. e t

. Hydrogen recombiner.

JME 80 at 77-82.

~

Hydrogen from makeup and waste decay tanks not a concern on 3/29/79 or 3/30/79.

JME 80 at 83-88; JME 83 at 55-56.

Ventilation on at time of Pressure Spike.

JME 93 at 27.

GPUSC engineers sent to site and briefed in 3/28/79; Flow of information between GPUSC and Met Ed and H.

Dieckamp on 3/28/79 and 3/29/79.

JME 26 at 10-19, 25-26, 28; JME 67 at 11, 27; JME 73 at 1-7, 15, 36-37; JME 82 at 40; JME B4 at 1-15, 20-21, 27, 31-32; JME 95 at 46; JME 118 at 49; JME 121 at 45, 17-18, 24-25.

Instruction not to activate equipment on 3/28/79.

JME 95 at 22, 23, 29-30.

Repressurization.

JME 10 at 23; JME 23 at 22; (Tapes 159 and 160) at 52; JME 72 at 28;

' p.

JME 83 at 8, 12, 27; JME 84 at 20; JME 95 at 25-26; JME 118 at 46; JME 138 at 132.

Operators Debriefing.

JME 121 at 46.

iPRI Lack of Knowledge of Incore Thermocouple Temperatures.

JME 121 at 51-53, 55-57.

Awareness of Core Damage on 3/28.

JME 26 at 25; JME 37 at 52-53; JME 84 at 10; JME.85 at121, 46; JME 121 at 4-5.

Knowledge of serious core damage on 3/29 or 3/30/79.

JME 4 at 11, 60, 77-79, 85-86, 123-125, 140, 151.

2.

JME 73 at 10-11; JME 84 at 25, 27.

Interpretation of Pressure Spike and Incore Thermocouple Temperatures in terms of core damage.

JME 4 at 59-68; 73-74, 130.

s.

-7 Interpretation of Keaten Notes for 3/29.

JME 4 'at 60-62, 152-154; JME 23 at 25.

Understanding by 3/29/79 that bubble was of noncondensible gas and not steam.

JME.4 at 61-65; JME 26 at 20-22.

Evacuation.

JME 4 at 82-84, 68-79.

Respectfully submitted, A' M f2M

'Linne Bernabei

. Dated:

December 19, 1984 GoNernment Accountability Project

/1555 Connecticut Ave., NW W ite 202 Washington, D.C.

20036 (202) 232-8550 3 0-es u el

[/S Joanne Doroshow The Christic Institute 1324 North Capitol St., N.W.

Washington, D.C. 20002 (202) 797-8106 Attorneys for Three Mile Island Alert

~

a g.

UNITED STATES OF AMERICA MUCLEAR REGULATORY COMMISSION

(

OgC E

Before the Atomic Safety and Licensing Board In the Matter of

)

4b

)

METROPOLITAN EDISON COMPANY

)

Docket No. 50-289 dBRcE 0f EECRtTAFV

)

(Three Mile Island Nuclear 00CKETihG & SERwCf..

)

(Restart - Management.Pba$$h Station, Unit No. 1)

)

I hereby certify that copy of the foregoing Three Mile

_g' e

Island Alert's Second Listing of Board Notifications has been served this 19th day of December, 1984, by mailing a copy first-class postage prepaid to the following:

Administrative Judge Ivan W. Smith, Chairman Thomas Au, Esq.

Atomic Safety & Licensing Board Office of Chief Counsel U.S. Nuclear Regulatory Commission Department of Environmental Washington, D.C. 20555 Resources 505 Executive House Administrative Judge P.O. Box 2357 Sheldon J. Wolfe Harrisburg, PA,'

17120 Atomic Safety & Licensing Board U.S. Nuclear Regulatory Commis'sion John A. Levin, Esq.

20555 Assistant Counsel Washington, D.C.

~

Pennsylvania Public Utility Administrative Judge Commission Gustave A. Linenberger, Jr.

P.O. Box 3265 Atomic Safety & Licensing Board Harrisburg, PA 17120 U.S. Nuclear Regulatory Commission 20555 Ernest L. Blake, Jr.

Washington, D.C.

Shaw, Pittman, Po?.ts & Trowbridge 1800 M Street, N.W.

Docketing and Service Saction (3)

Office of the Secretary Washington, D.C.

20036 U.3. Nuclear Regulatory Commission 20555 Mr. Henry D. Huk'.1 Washington, D.C.

Vice President Atomic Safety & Licensing Board GPU Nuclear Corporation Panel P.O. Bon 480 U.S. Nuclear Regulatory Commission Middletown, PA 17057 i

Washington, D.C. 20555 Mr. and Mrs. Norman Aamodt R.D. 5 Atomic Safety & Licensing Appeal Board Panel Coatesville, PA 19320 U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Ms. Louise Bradford TMI ALERT 1011 Green Street

  • Jack R. Goldberg, Esq.

Office of the Executive Legal Harrisburg, PA 17102 Director i

Nuclear Regulatory Commission Joanne Doroshow, Esq.

U.S.

Washington, D.C.

20555 The Christic Institute 1324 North Capitol Street i

Washington, D.C.

20002 t-x

  • l )

Michael'F. McBride, Esq.

LeBoeuf, Lamb, Leiby & MacRae Ellyn R. Weiss, Esq.

1333 New Hainpshire Avenue, N.W.

William S. Jordan, III, Esq.

Suite 1100-Harmon, Weiss & Jordan 2001-S Street, Northwest Washington, D.C.

20036 Suite 430 Michael W. Maupin, Esq.

Washington, D.C.

20009 Hunton & Williams 707 East Main Street Post Office Box 1535 THI-PIRC Legal Fund Richmond, VA 23212 to37 g ci,7 Harrisburg, Penn.

17103 lRa

>nl%

Ly5n PSrnabei

/

1 Le

/

\\

t 7 *