ML20101C752
| ML20101C752 | |
| Person / Time | |
|---|---|
| Site: | 05000000, 05000470, 05000601 |
| Issue date: | 04/13/1983 |
| From: | Mattson R BROOKHAVEN NATIONAL LABORATORY, Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20101C698 | List: |
| References | |
| CON-FIN-A-3705-3, FOIA-84-335 20-83-400, NUDOCS 8412210181 | |
| Download: ML20101C752 (3) | |
Text
.
1
~
s t
NRC'romu 173 u.s. nucle Am atcutarony cowuission omota nuwet a
~
A-78) 20'-83-400
^
STANDARD ORDER FO 60E WORK g
3 153UED TO: IDOE Offical ISSUE D SY: INRC Officol ACCOUNTING CITATION.
Brookhaven Area Office Office of Nuclear Reactor
^**ao'alATsou smoou Regulation, DSI 31X0200.203 B&R NUMSER PERFORMING ORGANIZATION AND LOCATION 20-19-40-41-3 Brookhaven National Laboratory Upton',' New York (3705,3 0ngp RIOD. THIS ORDER FIN. TIT L E FIXED G
' ESTIMATED D Safety Evaluation of Core-Melt Accidents:
CESSAR-FDA, FRou:
TO:
04/25/83 08/31/85 WestinOhouse Standard Plant FDA OBLIGATION AVAILABILITY PROVIDED BY:
A.
THIS ORDER S50,000
'S[ DER TM U
E "AP R1 i SY BOL AN - E FIR FOUR GI $ F E
$ 4.489.045 "B &R NUVB E R" CITED ABOVE C. TOTAL ORDERS TO DATE
'(TOTAL'A & B)
$4.539,045 D. AMOUNT INCLUDED IN "C" APPLICABLE TO THE " FIN NUMBE R" CITED IN THl3 ORDER.
5 FINANCIAL FLEXIBILITY:
O FUNDS WILL NOT BE REPROGRAMMED BETWEEN FINS. LINE D CONSTITUTES A LIMITATION ON O8 LIGATIONS AU THORIZE D.
3 FUNDS MAY BE REPROGRAMMED NOT TO EXCEED 210% OF FIN LEVEL UP TO $50K. LINE C CONSTITUTES A LIMITATION 5
ON OBLIGATIONS AUTHORIZED.1/ SEE BELOW STANDARD TERMS AND CONDITIONS PROVIDED DOE ARE CON $1DERED PART OF THIS ORDER UNLESS OTHERWISE NOTED.
ATTACHMENTS:
THE FOLLOWING ATTACHMENTS ARE HEREBY SECURITY:
MADE A PART OF THis ORDER:
D WORK ON THIS ORDER 15 NOT CLASSIFIED.
O STATEMENT OF WOR K O WORK ON THi$ ORDER INVOLVES CLASSIFIED.
C ADDITION AL TERMS AND CONDITIONS INFORMATION. NRC FORM 187 IS ATTACHED.
O OTHER r.t M A R KS (Reference the proposet by number and date. andindicate of the attached statement or work modifies the DOEproposaq:
This order provides incremental funds for initiation of work in accordance with the BNL proposal dated February 28, 1983.
Additional FY 1983 incremental funds will be provided commensurate with the progress of work on thi's project.'.
Af ter acceptance, please send to the NRC Office of Resource Management, ATTN: D. Dandois,
and provide a copy to the Office of Nuclear Reactor Regulation, ATTN: D. Corley.
ISSUING AUTHORITY ACCEPTING ORGANIZATION TEcer J. Mattson, Director f/
h.
r t
tit t e Division of Systems Integration i
[$
l u2c,o 73
'29 1/ Reprogrammin limited to
^".
l changes on f5ds w,'ithin the same B&R humber and the
'sare 4 propriation Symbol.
In order for this llocatibcanbee fective'id counter-signeo tothis office must be to b ssued al notified within 5 days so that an appropriate Form l complete the action prior to receipt 'of any bills.
8412210181 840621 i
y, ti mt l~
... p==*
d:FICE OF NUCLEAR REACTG2 REGULATIO::(4M
/*o/h d
t*r PROJECT IDENTIFICATION SUP. NAP.Y (PIDS) t OTW: bks "7 E:
E: i:..' r-Pa3 Fi
- 2. -..
... 3.c i.- c. Mc...- M"dA6.Ad : C65542-FD)!ti: A3705 kJit:i B-t stLw1Tm e~l.
'?
v
?
~>
- w. e o,
~no
- C, TRACT IiUMEER (Non-DOE)
B&R tiUMBER:"
R707y59 p[gT' 20-19-40-41-3 INDE7. NO.:
- IVISION: DSI SRANCH:RSS PROJECT MANAGER: J. if. eyer
- ITY, STATE (Non-DOE)
, SHALL BUSINESS /MINORIT,Y CONTRACT (! cn-DOE):
EUE-CONTRACTOR (S):
YES
/
/
NO /
/
AMOUNT 5
' if (est) END: 9/30/g RCJECTED PERIOD OF PERFORMANCE START:
7//lV-3 rc
- CJECTED FINANCIAL DATA (000's)
~
PROJECT FY 1983 EOTAL TOTAL TOTAL CARRY FY ET FY 84 FY 85 Fyrd
.ALUE OBLIG COSTED OVER.
E '. J C 5UDG BUDG geo c.
4 50 dCt 750 g::=9
,,a 9fo
- Led 50 SMM
.::hdD 300 L.? PLICATION (RELATE THE PROJECT TO A' SPECIFIC FLANNED ACCOMPLISHMENT)
Aeview of.PRA studies for:
1.
CESSAR System 80 FDA review 2.
1:estinghouse Standard Plant FDA review i
0 e
j
.y
.~
9
- 02. r; :EOUi:.Ei'.ENTS (DESCRIBE b' HAT IS TO, c: r:r.r uR.'.:ED )
~.e following analyses and assessments, will be pe-fermec by this project: core-melt
- ccicent gro;ressions wi
- n emphasis on contair.mer.: loacings (pressure and temperature)
Er.d containmen: Ta11ure characteristic; evolu;icr. and release of radiological source term
- uring core-me tt accidents from Tuel, primary system, and cor.tainment system; radiciocical
- cnsequences. to the public from core-melt accidents; and safety benefit from features'
- c mitigate the consequences of core melt accidents.
To support these analyses, the
- cntractor will be required to maintain and modify the KARCH, CORRAL, KATADOR-and CRAC
- cces as required in light of the current RES MARCH-2 and MELCOR development'procram and assimilate results of phenomenological studies (RES, iDDOR, foreign, and DOE) and en.:ineering research programs.
In addition, an overali integrated assessment which considerg
- ci these Tactors will be p'repared for design.
Products: miscellaneous letter reports for input to SERs, input to hearing testimony, if required.
~
L'.ajor Product:
(2) ilUREG/CRs - FY 1985.
DDIFICATIONS (DESCRIBE MAJOR CHANGES TO THE FROJECT) 3,Q j a F 1 -14 + r$~ J-nu& M a My A &
A,j,% a A/ M.# % / Q y 4 A 2;;.
w ~.4 &,
" ^ & & 1~, n M, J
/E r$ && Q
,pi.dk f5A 46 ED e o f. &, A A & P Q J.c,44 a / m (7/to/f])
QQ t
l
,e.
-., 2 C r,.:. L.:. -
c.
i l
l: - --- e r.de r :
Encorsed:
Endorsed:
Er.dc rie d :
Apprcved:
4'?E.-
."l'.-0ER SECT:0!. LD;.
DIV. DIR l
l (initials) 1 l
a