Monthly Operating Rept for Nov 1984
ML20101C449
Person / Time
Site: Salem PSEG icon.png
Issue date: 11/30/1984
From: Ronafalvy J, Zupko J
Public Service Enterprise Group
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 8412210088
Download: ML20101C449 (11)


Text

..

' AVERAGE DAILY UNIT POWER LEVEL Docket No.

50-311 Unit Name Salem # 2 Date Dec.-10,1984 Completed by-J.

P.

Ronafalvy-Telephone 609-935-6000 Extension 4455 Month November 1984 Day' Average Daily Power Level Day Average Daily Power Level (MWe-NET)

(MWe-NET) 1 0

17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

i 12 0

28 0

13 0

29 0

14 0

30 0

15 0

31 0

16 0

Pg. 8,1-7 R1 e41221 g 8 GOO 1

PDR AD PDR R

page 1 of 10 lll

7 OPERATING DATA REPORT

'l DocketfNo. 50-311 Date Dec. 10,1984 Telephone 935-6000 Completed by-J.

P.'Ronafalvy Extension 4455 TOperating Status 1.

. Unit Name Salem No. 2 Notes

~2.

. Reporting. Period l November 1984 3.

Licensed Thermal Power (MWt) 3411 4.

Nameplate Rating (Gross MWe) 1162 5.

Design Electrical Rating (Net MWe) 1115 6.

Maximum Dependable Capacity (Gross.MWe)1149 7.

_ Maximum Dependable 1 Capacity (Net MWe) 1106 8.

If Changes Occur in Capacity Ratings'(items 3 through 7).since Last

' Report, Give Reason N/A 9.

Power Level to Which Restricted, if any (Net MWe)

N/A

10. Reasons for Restrictions, if any N/A This Month Year to Date Cumulative
11. Hours in Reporting Period

-720 8040 27481

12. No. of Hrs. Reactor was Critical 0

3386.0 15094.6

13. Reactor Reserve Shutdown Hrs.

0 1442.9-3533.6

14. Hours Generator On-Line 0

3194.8 14612.1

' 15. Unit Reserve Shutdown Hours 0-0 0

16. Gross Thermal Energy Generated (MWH) 0 10255964 43727036
17. Gross Elec. Energy Generated (MWH) 0 3409360 14277650
18. Net Elec. Energy Generated (MWH)

(3441) 3203553 13520801

19. Unit Service Factor 0

39.7 53.2

20. Unit Availability Factor 0

39.7 53.2

21. Unit Ccpacity Factor (using MDC Net) 0 36.0 44.5
22. Unit Capacity Factor (using DER Net) 0 35.7 44.1
23. Unit Forced Outage Rate 100 56.6 37.1 24.' Shutdowns scheduled over next 6 months (type, date and duration of each)

Refueling and generator overhaul, 11-03-84, 6 months

25. If shutdown at end'of Report Period. Estimated Date of Startup:

3-26-85

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved Initial Criticality 6/30/80

-8/2/80 Initial Electricity 9/1/80 6/3/81 Commercial Operation 9/24/80 10/13/81

~

8-1-7.R2r page 2 of 10 m

1 gv UNIT SHUTDOWN AND POWER REDUCTIONS

' Docket No'.c50-311' REPORT MONTH November ~1984 Unit: Name Salem No.2 Date Dec. 10.1984 Completed by J.P.

Ronafalvy

-Telephone 609-935-6000 Extension 4455 Method of Duration Shutting License Cause-and Corrective?

No.

-Date Type Hours Reason Down Event-System-Component Action to 1

2 Rea cto r Report Code 4 Code-5 Prevent-Recurrence' HA GENERA Stator Windings84-300 10-04 F

48 A

3 Generator-Major _

84-302 11-03 F

672 A

4 HA-GENERA Overhaul Major Turbine 84-302 11-03 S

672 A

4 HA TURBIN Overhaul

~;

Misc. Major.84-302 11-03 S

672 B

4 HC HTEXCH Condenser Overhaul' 5 Exhibit 1 1-2 Reason 3 Method 4 Exhibit.G F: Forced A-Equipment Failure-explain 1-Manual Instructions Salem as S: Scheduled B-Maintenance or Test 2-Manual Scram.

for Prepara

. Source-C-Refueling 3-Automatic Scram. tion of Data D-Regulatory Restriction 4-Continuation of. Entry Sheets E-Operator Training & Licensing Exam Previous Outage for Licensee F-Administrative 5-Load Reduction Event Report G-Operational Error-explain 9-Other (LER) File H-Other-explain (NUREG 0161).

t Du 4

4 tb LJ Om 3

9

, MAJOR PLANT MODIFICATIONS DOCKET NO.:

50-311-

REPORT MONTH NOVEMBER 1984 UNIT NAME:

Salem 2 DATE:

December 10, 1984 COMPLETED BY:

J.

Ronafalvy TELEPHONE:

609/935-6000 X4455'

  • DCR NO.

PRINCIPLE SYSTEM SUBJECT 2SC-1332 Chilled Water Install an additional suction gauge no greater than 40 PSI for 21 and 22 Chilled Water Pumps.

Gauges for use during 4.0.5.P testing of the pumps, i

Design Change Request i

4 i

1

(

4 4

page 4 of 10

MAJOR PLANT MODIFICATIONS DOCKET NO.:

50-311 REPORT MONTH NOVEMBER 1984 UNIT NAME: Salem 2 DATE:

December 10, 1984 COMPLETED BY:

J.

Ronafalvy TELEPHONE:

609/339-4455 DCR NO.

10CFR 50.59 SAFETY EVALUATION 2SC-1332 All potential, realistic failure modes have been considered and found to be not applicable.

ASME Section XI recommends that the gauges be no more than four (4) times the reference value.

No unreviewed safety or

. environmental questions are involved.

Design Change Request page 5 of 10 L.m

PSE&G SALEM GENERATING STATION

'2 SAFETY RELATED WORK ORDER: LOG SALEM UNIT 2 WO NO DEPT UNIT EQUIPMENT IDENTIFICATION 84-11-22-009-5 2

NO. 21 BAST HEATER SMD FAILURE DESCRIPTION:

BREAKER 2AY2AX5L CONTINUALLY TRIPS OUT CORRECTIVE ACTION:

INSTALLED NEW BREAKER 84-10-31-001-5 SMD 2

NO. 21 WASTE GAS COMPRESSOR FAILURE DESCRIPTION:

COMPRESSOR DOES NOT START FROM 104 PANEL SIGNAL CORRECTIVE ACTION:

REPLACED CONTROL COIL AND TRIP COIL 0099122944 SMD 2

VALVE NO. 21CC16 FAILURE DESCRIPTION:

OPEN LIMIT LIGHT STAYS ON WHEN VALVE IS CLOSED CORRECTIVE ACTION:

REPLACED 33X RELAY IN BAILEY CABINET 84-11-14-042-3

-SMD 2

NO. 26 SW PP COOLING WATER LINE FAILURE DESCRIPTION:

THE LINE HAS RUSTED THROUGH-CORRECTIVE ACTION:

WELDED IN A NEW PIECE OF PIPE n

84-11-05-095-5 SMD 2

NO. 25SW24 BACKWASH VALVE FAILURE DESCRIPTION:

VALVE IS STUCK CORRECTIVE ACTION:

REPLACED DIAPHRAGM AND REPLACED STUDS o

SALEM UNIT 2 t

WO NO DEPT UNIT EQUIPMENT IDENTIFICATION 84-08-12-678-4 SMD 2

RMS CHANNEL 2R46E FAILURE DESCRIPTION:

CHANNEL HAS FAILED CORRECTIVE ACTION:

REPAIRED RMS CHANNEL DRAWER: REPLACED RESISTORS AND TRANSISTORS: REPLACED DETECTORS "OUT" AND "IN":

RESOLDERED TERMINALS E AND F ON J2 CONNECTOR:

REPLACED AMPHONAL CONNECTOR ON DETECTOR CABLE 009901360-6 4

SIC 2

2N35 INTERMEDIATE RANGE FAILURE DESCRIPTION:

-25 VOLT POWER SUPPLY DRIFTS CORRECTIVE ACTION:

REPLACED POWER SUPPLY 0099122812 SIC 2

VALVE 2CH2 I

FAILURE DESCRIPTION:

VALVE WILL NOT CYCLE IN AUTO CORRECTIVE ACTION:

REPLACED AMPLIFYING RELAY 84-10-10-045-2 SIC 2

NO. 22 DIESEL GENERATOR DAMP. 2DGV4 FAILURE DESCRIPTION:

VALVE IS BLOWING THROUGH CORRECTIVE ACTION:

REPLACED SOLENOID VALVE 84-10-08-023-1 yn SIC 2

DIESEL EXHAUST FAN START VALVE 1049 1

FAILURE DESCRIPTION:

SOLENOID VALVE IS BLOWING THROUGH y

CORRECTIVE ACTION:

REPLACED'SOLENIOD VALVE o

l'

' ~. '

l i

L SALEM UNIT 2 i

WO NO DEPT UNIT EQUIPMENT IDENTIFICATION 84-10-08-022-1 SIC 2

DIESEL EXHAUST FAN VALVE 1047 FAILURE DESCRIPTION:

SOLENOID VALVE IS BLOWING THROUGH CORRECTIVE ACTION:

REPLACED SOLENOID VALVE 84-10-08-026-1 SIC 2

DIESEL EXHAUST FAN START VALVE 1050 FAILURE DESCRIPTION:

SOLENOID VALVE IS. BLOWING THROUGH CORRECTIVE ACTION:

REPLACED SOLENOID VALVE 84-08-23-002-6 SIC 2

NO. 24 CFCU WATER DRAIN FLOW ALARM l

FAILURE DESCRIPTION:

THE ALARM IS UP CONSTANTLY FOR NO REASON CORRECTIVE ACTION:

REPLACED A BAD MODULE f

i

SALEM GENERATING STATION MONTHLY OPERATING

SUMMARY

- UNIT NO. 2 OCTOBER 1984 The period began.with'the second refueling / turbine outage in progress.

Preparations continue'for installation of the General Electric Generator.

The existing Generator has been lifted off its foundation

~ and lowered to the ground.

The new Low Pressure Rotors (3) arrived on site 11/7/84.

Dismantling of the auxiliary equipment for the Westinghouse Generator has been completed.

The Stator Cooling Water and Seal Oil skids for the General Electric Generator are being installed.

Sludge lancing and annulus inspection of the Steam Generators has been completed.

Steam Generator secondary side inspections were completed satisfactorily.

No. 24 Steam Generator tube leak repair continues.

The leak has been found via a helium leak check and is in the process of being plugged.

The first shipment of new fuel arrived on site on 11/8/84.

Type C leak rate testing of -

(

Containment Isolation Valves is in progress.

To date eighty-seven (87) or one-hundred and thirteen (113) valves have been accepted.

Nos. 21 and 23 Reactor Coolant Pump (RCP) seal replacement continues.

No. 22 Service Water Header inspections and repairs were completed.

No. 21 Service Water Header outage and No. 2A Vital Bus outage activities have been st arted.

i I

page 9 of 10

I

.j.. 5 REFUELING INFORMATION DOCKET NO.:

50-311 COMPLETED BY:

J.'Ronafalvy UNIT NAME:

Salem 2 DATE:

December 10, 1984 TELEPHONE:

609/935-6000 EXTENSION:

4455 Month November 1984 1.

Refueling information has changed from last month:

YES X

NO 2.

Scheduled date for next refueling:

October 4, 1984 3.

Scheduled date for restart following refueling:

April 1, 1985 4.

A)

_Will Technical Specification changes or other license amendments be required?

YES X*

NO B)

Has the reload fuel design been reviewed by the Station Operating Review Committee?

YES NO X*

If no, when is it scheduled?

December 1984 5.

Scheduled date (s) for submitting proposed licensing action:

December 1984 (if additional submittal is required) *

-6.

Important licensing considerations associated with refueling:

NONE 7.

Number at Fuel Assemblies:

A)

Incore 193 B)

In Spent Fuel Storage 72 8.

Present licensed spent fuel storage capacity:

1170 Future spent fuel storage capacity:

1170 9.

Date of last refueling that can be discharged to spent fuel pool assuming the present licensed capacity:

March 2004 8-1-7.R4 A request for Technical Specification change that is required for Salem 2 Cycle 3 operation was transmitted to the NRC in our letter

-dated 10/15/84.

The actual reload analysis for Cycle 3 is in progress and if turther Technical Specification changes are required, they will be submitted in December 1984.

i l

page 10 of 10 c.

J

  • [.

0: PSEG Public Service Electric and Gas Company..O. Box E Hancocks Bridge, New Jersey 08038

' Salem Generating Station December 10, 1984 P-Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Sir:

MONTHLY OPERATING REPORT SALEM NO. 2 DOCKET NO. 50-311 In Compliance with Section 6.9, Reporting Requirements for the Salem

-Technical Specifications, 10 copies of the following monthly operating reports for the month of November 1984 are being sent to you.

Average Daily Unit Power Level Operating Data Report Unit Shutdowns and Power Reductions Major Plant Modification Safety Related Work Orders Operating Summary Refueling Information Sincerely yours, 9-J. M.

Zupko, Jr.

General Manager - Salem Operations JR:sbh cc:

Dr. Thomas E. Murley Regional Administrator USNRC Region I 631 Park Avenue King of Prussia, PA 19406 Director, Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, DC 20555

. Enclosure 8-1-7.R4 6

(h 1

l \\

The Energy Peopk) 96 2189 (20M) 1181 L_