OPERATING DATA REPORT DOCKET NO 50-255 DATE 12-06-84 COMPLETED BY AFDienes TELEPHONE (616)764-8913 OPERATING STATUS NOTES 1.
Unit Name: Palisades 2.
Reporting Period:
841101-841130 3.
Licensed Thermal Power (MWt):
2530 4
Nameplate Rating (Gross MWe):
811.7 5.
Design Electrical Rating (Net MWe):
805 6.
Maximum Dependable Capacity (Gross MWe): *675 7.
Maximum Dependable Capacity (Net MWe):
- 635 8
If Changes Occur in Capacity Ratings (Items Number 3 through 7) since last report, give reasons:
9.
Power Level to Which Restricted, if any (Net MWe):
- 10. Reasons for Restrictions, if any:
This Month Yr-to-Date Cumulative
- 11. Hours In Reporting Period 720 8,040 113.535
~
- 12. Number of Hours Reactor Was Critical 238.6 806.S 60,065.7
- 13. Reactor Reserve Shutdown Hours 14 Hours Generator On-Line 223.9 592.3 56,870.3
~
- 15. Unit Reserve Shutdown Hours
- 16. Cross Thermal Energy Generated (MWH) 485.160 884,472 116,244,696
- 17. Gross Electrical Energy Generated (MWH) 156,620 274,700 36,025,140
- 18. Net Electrical Energy Generated (MWH) 147,140 248,887 33,876,901
- 19. Unit Service Factor 31.1 7.4 50.1 l
- 20. Unit Availability Factor 31.1 7.4 50.1
- 21. Unit Capacity Factor (Uning MDC Net) 32.2 4.9 47.0 22.
Unit Capacity Factor (Using DER Net) 25.4 3.9 37.1
- 23. Unit Forced Outage Rate 68.9 80.0 33.8
- 24. Shutdowns Scheduled Over Next Six Months (Type Date and Duration of Each):
25.
If Shut Down at End of Report Period, Entimated Date of Start Up:
- 26. Units in Test Status (Prior to Commercini Operation):
Forecast Achieved THITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
~
I
- Based on condenser backpressure l
OC1083-0100B-TC03 h
0 C
%d a
3
\\
\\
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisaden DATE 12-06-84
. COMPLETED BY AFDienes TELEPHONE (616)764-8913 MONTH November 1984 DAY AVERAGE DAILY POWER LEVEL DAY
' AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 2
6 0
22,
446 7
0 23' 636 8
0
' 24 683 9
0 25 739 10 0
26 699 11 0
27 665 12 0
28 752 13 0
29 754 14 0
30 755 15 0
16 0
INSTRUCTIONS:
On thin format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearent whole megawatt.
OC1063-0100C-TC03
q DOCKET NO.
50-255 INIT SHUIDOC:S AE POWER REDUCTIONS I' NIT NAME Palisades DATE 12-06-84 COMPLETED BY AFDienes REPORT MMIH NOVEMBER 1984 TELEPH0f2 (616)-764-8913 1
2 dause & Corrective No.
Date Type Duration Reason Method of Licensee Systp Compogent (Hours)
Shutirg Event Code Code Action to Down Reactor Report e Prevent Recurrence 6
840916 F
496.1 A
1 84-21 AB P
Seals failed on primary l
coolant psamp, P-50C.
1.
2.
3.
4.
5.
F: Forced Reason:
Method:
Exhibit C - Instructions Exhibit I - Same Source S: Scheduled A-Equipe:ent Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scra:n Event Report (LER) File D-Regulatory Restriction 4-Other (Explain)
(NCREG-0161)
E-Operator Training & License Examination F-Administrative C-Operatienal Error (Explain)
(9/77)
H-Other (Explain)
OC1083-010CD-TC03
SUMMARY
OF OPERATING EXPERIENCE FOR NOVEMBER 1984 The unit was placed on line November 21 at 1606 hours0.0186 days <br />0.446 hours <br />0.00266 weeks <br />6.11083e-4 months <br /> after completing primary coolant pump repairs.
Power level was reduced on November 26,' because the primary data logger was l
declared inoperable. The problem was corrected shortly thereafter, and power escalation commenced again at the fuel conditioning rates.
Reactor power of approximately 98% was achieved on November 28 and remained at that level through the end of the reporting period.
L S
I k
{
i i
Ocl083-0100E-TC03 I
,4_w,y
_-.,..-m.
,-my-
....._,.3,.7,,-,_.,,%=e___,., _..,,...-,.e._,m,.
,,,w y,
m.
c
~
Consumers POW 8r Company Pahsades Nuclear Plant. 2778o Blue Star Memonal Highway, Covert MI 49043 December 6, 1984 US Nuclear Regulatory Commission Mail and Records Section Washington, DC 20555 LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of November 1984, h
+-
Dewey VanDenBerg Reactor Engineer CC: KMHass, Palisades CHGoralski, Palisades JGKeppler, USNRC JRSchepers, Palisades DJVandeWalle, P24-614B DWRogers, Palisades Resident Inspector, Palisades DLHackett, P11-228B LABrown, P21-317 GWBruckmann, Div of Radiological Health Services, Lansing, Michigan SMicrzwa, Michigan Dept of Labor RCallen, Michigan Public Service Commission KMFarr, Palisades Records Center, INPO, Atlanta, GA RVraylor, CE, Palisades JBToskey, P25-101 EWRaciborski, P26-204 DRCanser, P26-205 Document Control, 950*22*35*10/L CHG84*020 36Y i
I l
OC1083-0100A-TC03
?