ML20101A741

From kanterella
Jump to navigation Jump to search
Forwards Three Copies of Amend 40 to PVNGS Physical Security Plan.Encl Withheld
ML20101A741
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/01/1996
From: Overbeck G
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
102-03616-GRO-A, 102-3616-GRO-A, NUDOCS 9603130256
Download: ML20101A741 (2)


Text

. _ _ _ _ _ _ _ . - - . - - _ . - _ . . _ _ -

' SAFEGUARDS INFORMATiCN 4

. 10 CFR 50.54(p)(2)

Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P O BOX 52034 . PHOENIX. ARIZONA 85072-2034 102-03616-GRO/AKK/DRL

"'Oce" fsYo'Ur'" March 1,1996 NUCLEAR $UPPCRT i

1

)

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station: P1-37 Washington, DC 20555-0001

References:

NUREGICR-6190, Dated December 1,1994, " Protection Against Malevolent Use of Vehicles at Nuclear Power Plants Vehicle Barrier Systems Sighting Guidance For Blast Protection" NUREG-0908, Dated August 1,1982, " Acceptance Criteria For the Evaluation of Nuclear Power Reactor Security Plans"

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1,2, and 3 Docket Nos. STN 50-528/529/530 PVNGS Physical Security Plan Amendment 40 in accordance with the above referenced regulations, Arizona Public Service Company (APS), has incorporated a change to the PVNGS Physical Security Plan to add a description for protection against the malevolent use of vehicles and reformat the entire ,

Plan.

Enclosed please find an original and three copies of Amendment 40 to the PVNGS Physical Security Plan. In accordance with 10 CFR 50.4(b)(4)(iii) and by copy of this letter, APS is forwarding two copies of Amendment 40 to the Regional Administrator,

- NRC Region IV.

This amendment does not decrease the effectiveness of the PVNGS Physical Security Plan and, therefore, is being made pursuant to 10 CFR 50.54(p). A summary of the changes is included in Enclosure 1, a justification of changes is included in Enclosure 2 and the original of the PVNGS Physical Security Plan, Amendment 40, is included in Enclosure 3.

APS has determined that the original of the PVNGS Physical Security Plan contains Safeguards information and is subject to the controls of 10 CFR 73.21. These pages, 9603130256 960301 PDR ADOCK 05000528 h V! HEN SEPARATED WiCM F PDR

/)/ ENCLCSURES, HANDLE THIS

  • 30059 SAFEGUARDS INFORMATIO

\ DOCUMENT AS DECONTROLLED.

SAFEGUARDS INFORMATION 4

U. S. Nucirr Regul tory Commission ATTN: Document Control Desk PVNGS Physical Security Plan Amendment 40 Page 2 so designated, are to be withheld from public disclosure in accordance with the provisions of 10 CFR 2.790(d) and should go.t be placed in the Public Document Room.

Should you have any questions, please contact Ms. Angela Krainik at (602) 393-5421.

Sincerely, t i /d4t #5 L GRO/AKK/DRL

Enclosures:

1. Summary of Changes to the PVNGS Physical Security Plan
2. Justification of Changes to the PVNGS Physical Security Plan
3. Amendment 40 to the PVNGS Physical Security Plan cc: L. J. Callan (w/ Enclosures and two copies)

T. W. Dexter A. B. Earnest K. E. Perkins ,

K. E. Johnston I E. W. McPeek WHEN S2?l. RATED FROM ENCLOSURES, HANDLE THIS GAFEGUAa;3 iNFCRMATiON DOCUMENT AS DECONTROLLED.

__