ML20101A285

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Mar 1992 for Seabrook Station, Unit 1
ML20101A285
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 03/31/1992
From: Feigenbaum T, Nardone P
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NYN-92048, NUDOCS 9204210222
Download: ML20101A285 (6)


Text

.

New Hampshire i

3[

Ted C. Feigenbaum hh h.

President and Chief becutive Ofhcer i

i NYN. 92048 April 13,1992 United States Nuclear Regulatory Commission Washington, DC 20555 Attention:

Document Control Desk

- R efe re nce:

Facility Operating License NPF 86, Docket No. 50-443

Subject:

Monthly Operating Peport Gentlemen:

Enclosed please find Monthly Operating Report 92-03.

This report addresses the operating and shutdown experience relating to Seabrook Station Unit 1 for the month of March,1992 and is nubmitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.

Very truly yours,

&& (, - &&ht.<dn Ted C. h.,.uba$tm Enclosure cc:

Mr. Thomas T. Martin Regional Admirastrator U. S. Nuclear Regulatory Commission Region' I 475 Allendale Road King of Prussia, P.A 19406 Mr. Gordon E. Edison, Sr. Project Manager t

i Project Direc t or alc.1 Division of Reactor Projects U.S. Nuclear Regulatory Commission Washington, DC 20555 Mr. Noel Dudley NRC Senior Resident Inspecto,r P.O. Rox 1149 Scabrook, NH 03874 9204210222 920331 PDR I

1

' ADOCR 05000443

/

i PDR 6

i R

isew nampsnire vonxee Division of Public Service Company of New Hampshire

~~--

P.O. Box 300

  • Seabrook, NH 03874 + Telephone (603) 474 9521 l

-)

n.--_~_.-

k.

I 1

r l'--

^

New Hampshire -Yankee April 13,1992 ll f-I

h. --

1 -:.

1 I.I-l-

ENCLOSURE TO NYN 92048 i :-

l Lr e

4 i

I h

a n

L I

k-l t

')

'1 I;

f ;-

l_

t b

I L

a I

l li i

l L. :.......

~...

. ~. -..

-l

- OPERATING; DATA REPORT DOCKET NO.10-443 j

UNIT SeAhrook 1 DATE 04/13/92 COMPLETED BY P. Nardone j

TELEPHONE I603) 474 4521 (Ext. 4074)

.pFERAIING STATUS 1.

Unit: Names.

Seabrook Station Unit 1

.2, Reptrting Period:

MARCH-1992

3. 1 Licensed Thermal Power (MWt):

C '+ 11 4

Nameplate Rating (Gross MWe):

1197 5.

Design' Electrical Rating (Net =MWe):

1148

-i 6.

Maximum Dependable Capacity (Gross MWe):

1200

-7.

Maximum Dependable Capacity- (Net MWe):

1150 8.

If Changes occur in capacity Ratings.(Items Number 3 Through 7)

Since Last-Report, Give Reasons:

Not Acolicable

'9.

Power-Level To Which Restricted If Any:

Nona

10. Reasons For Restrict 1ans, If Any Not /.p,pJicable This Month Yr. - to-Date Cumulative 11, Hours 1In Reporting Period 744.0_

2184.0 47833.0-3

12. Number 0f Hours Reactor Was Critical 744.0

?l84.0 14549.5

13. Reactor Reserve Shutdown Houre 0.0 0.0__

953.3

14. Hours Generator On Line-744.0 2184.0 12708.0

'15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 16.. Gross Thermal _ Energy Generated (MWH)

_2536703 7444240 40514103

17. Gross Elec.. Energy-Generated (!S41) 888239

>2603856-

__13975105 13.'Not-Electrical' Energy Generated (MWH) 854092 2503329,,,_

134.11704

  • 19. Unit. Service-Factcr 100.0

-100.0-80.0 i

  • 20. Unit Availability. Factor 100,0 100.0 80.0 l
  • 21. Unit: Capacity Factor (Using MDC Net) 99.8 99.7

-7 5. 9 -

  • 22. Unit Capacity: Factor (Using DER Net) 100.0 99.8 76.1, L
  • 23. Unit Forced Outage-Rate 0.0 0.0 7.0 24; Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

-None: Scheduled-l' l

25, 1f_ Shut.Down At End,0f Report Period Estimated Date Of Startup: Not Applicable L

(,

"NOTEt *Cumulatire" values based on total hours starting 08/19/90, date Regular Full l

Pcwer Operation began.

1 of 4 m

l 1.-

-r r

v

,,~e

+

...e

,-,,r

.,,-,.m r

.. ~

. ~. -. _

.. - -.. -...... ~.

.x-l i

g.

'AVERAGS DAILY UNIT VER LEVEL DOCKET NO _ 50.443

' UNIT,,gpcbrook 1 DATE 04/13/92 l

COMPLETED BY,P, Nardone TELEPfl0NE j_603) 474-9521 i

(Ut. 4074)

. MONTH M,AEH 1992._ _

a DAY : AVERACE DAILY POWER LEVEL

-DAY AVERAGE DAILY POWER L'EVEL'-

(MWe-Net)

- (MWe-tie t )

1

-1147 16 1148 2

1148 17 1148

'3 1148 18 1148 4

1148 19 1148 5

Q4,9 20 1148 6-1148 21 1147 7

114A 22 1148 L-B 11_48 23 1148 1

9-

' 11J,0 24 1148 i

'.10 1148 25 1143 111-.

1150 26 1148_

12-1148-

.27 1148-13.

1148 28 11%8' q"

'14 1148

-29 1148 I"

'5 1148 30 1148 j :'

31 1148

INSTRUCTIONS

On this' formr.t, list the average daily unit power level in MWe-Net for each day._in the p

~ reporting month. Compute to the nearest whole megawatt.

i' L

2 of 4 s

Y l '_

(.

~

jll l'

llili!1iIl:1IIi l

w 1

a f

o.

g

e 2- )'

1 -

1 5

4 1

a 9

7 e

2 n

- 0 g

3 k' 9 o 4 4

a 4 o /

d 7

P 4

o 3 r 4 r

1 a

t.

0 b

/

N

)

x e

5 a 1 3

E.

e c

v 0

(

e 0 n-S P

6

, i

(

t er' co r

.TEYE.

et u

OITBN r

c NNA O

rn m

n

)

e-UDDH oo amho) n T

.EP Ci R roti0i

- TE.

t t-mcrnt a

E g

K EL Ec aSf oc l

n C'

LE Ae r

mu p

G PT e

ccd dnx v

S i e s e _ E, D

H s

e t uuR' C

u r

a ll ano t

C '

C P '-

aamiirar duuotvere onnt newuh oroDt h a a u C pF (

tMM2 G

e-M1234 S

9 3

2 H

e' T

et N

sn O

t r

S ne M

o' N

evp O

cE S

e I

i I

T 2

L R

H n

C 9

T o

4 U

9 i

D 1

R t

f E

O a

o F

n R

H r

i 3

R C

o S

m E

R fgt E

a W

A onc I

x O

M ia R

E P

dt e T

otR N

)

e.

)

D' hu' E

n n

t N

thn i

n i

e w

O a

e a

A M 'S o N

l c

l L

H S

T D

p ni p

m N

N x

oL x

O E

i E

W

( t t&

(

M s

c r

T T

ee ig r

2 n

rT rn o

U

,E o~

u ti r)

H O

s S

I l r snern a

E' i o eivEi e

a Rai a

T R'

R Fe rtll I

N c

yT a a p U

t ngr rnx nanort oE n

o )s mel atit enitosi(

i pt el anar r

t u

ninuurire a

ouif gemeh o

r H s q a e e pd pt u

D{

aEMRROAOO e - -

RABCDEFGH 2

l e p

y T

d e

e t

l a

du D

ed ce rh oc FS

.o N

FS 1

I1l,llji Il!.

Ilt

!;ail.

t t!i!i:

jj!

.._.,m j

.v DOCKET NO.

50-443 UN1r Seabrook i DATE 04/13/92 COMPLETED si P. Nardone-TELEPHONi: (603) 474-9521 (Ext. 4074)

REFUELING INFORMATION REQUESl

~

1,.Name of. facility:

Seabrook Unit 1

2. Scheduled date-for next refueling shutdown
  • 09/19/92 3.

Scheduled date for restart following refueling:

11/14/92

-4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Yes, Reactor Coolant System Narrow Range' RTD Lypass E11ctination

5. Schedult.: date(s) for submitting' licensing action and supporting information:

3 March 15, '.997

-6.

Important licensing considerations associated with refueling, e.g.,

ne; or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

Next refueling will be the initial start of the eighteen-month fuel cycle schedule.

7. 'The number of fuel assemblies (a) in the core and (b) in the spent fuel-storage pocli ga).'In Coret 193 (b) 60-
8. The present licensed spent fuel pool storage capacity and the site of-any increase in licensed 9torage capacity that has been requested or is planned, in number of fuel' assemblies:

Present licensed espacityt 1236 No increase in storage capacity requested or planned.

I9'. The projected date of the last refueling that can be diacharged to the spent fuel pool assuming the.present licensed capacity:

~

Licenued capacity - uf 1:Sn fuel assemblies based on two annual and twelve l-eighteen month refuelings with full cora offload capability.

!~

The current licensed capacity is adequate until at least the year 2010.

4 of 4 e..

a

.