ML20100R265
| ML20100R265 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 03/07/1996 |
| From: | Woodlan D TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9603120334 | |
| Download: ML20100R265 (2) | |
Text
z --
M Log # 96078
- llllll" =
File # 916 (6.0) a
=
=
7UELECTR/C March 7, 1996 C. Lance Terry Gnep Mce President U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50 445 AND 50 446 REVISED INFORMATION ON RELOCATION OF CPSES TECHNICAL SPECIFICATION ADMINISTRATIVE CONTROLS REF:
In Reference 1 TU Electric submitted License Amendment Request (LAR)94-014 which proposed a revision to the Administrative Controls Section of the CPSES Technical Specifications (TS). On page 5 of Attachment 2,
" Description and Assessment " TU Electric provided a table which identified selected TS Administrative Controls and listed the CPSES controlled documents where TU Electric proposed to relocate each of these TS Administrative Controls.
In Reference 2. TU Electric provided a revised relocation table based on discussions between TU Electric and the NRC staff. The revised table clarified where selected TS Administrative Controls were to be relocated and did not affect any of the marked up Technical Specification pages submitted with Reference 1 or the determination of no significant hazards.
This letter further revises the relocation table provided in Reference 2.
The table now indicates that Technical Specifications 6.5.1.61 and 6.5.1.6j are being relocated to the CPSES Physical Security Plan and Emergency Plan, respectively. This relocation was discussed with the NRC staff and is consistent with Generic Letter 93 07, " Modification of the Technical Specification Administrative Control Requirements for Emergency and Security Plans."
The revised table provided below also does not affect any of the marked up Technical Specification pages submitted with Reference 1 or the determination of no significant hazards.
Selected administrative controls are being relocated as follows:
9603120334 960307 PDR ADOCK 05000445 P
PDR pf Energy Plaza 1601 Bryan Street Dallas. Texas 75201-3411 g
~
TXX 96078 Page 2 of 2 TS Section Descriotion,
New Location 6.2.2d &
Detailed composition and responsibilities of FSAR 13.1 Table 6.21 the minimum shift crew 6.2.3 Independent Safety Engineering Group (ISEG)
FSAR 17.2*
6.5**
Review and Audit FSAR 17.2 6.5.1.61.
SORC Review of the Security Plan and shall SP submit recommended changes to the ORC 6.5.1.6j.
SORC Review of the Emergency Plan and shall EP submit recommended changes to the ORC 6.5.3.lf.
Review of Security Plan (SP). Emergency Plan SP: EP (EP) implementing procedures 6.6 Reportable Event Action FSAR 17.2 6.8.1c.
Security Plan Implementing Procedurer SP 6.8.1d.
Emergency Plan Implementing Procedures EP 6.8.le.
PCP Implementing procedures FSAR 17.2 6.8.2 Review and approval of procedures and FSAR 17.2 revisions 6.8.3b.
In Plant Radiation Monitoring FSAR III.D.3 6.8.3f.
Radiological Environmental Monitoring Program ODCH***
6.9.1.1 Startup Report FSAR 4.6.6 i
6.10 Record Retention FSAR 17.2 6.11 Radiation Protection Program FSAR 12.5.3 6.13 Process Control Program (PCP)
FSAR 17.2 FSAR Chapter 17.2 is TV Electric's Quality Assurance Plan
- Except as noted otherwise
- 0ffsite Dose Calculation Manual (0DCM)
If there are any questions concerning this revised table, please contact Mr. Connie L. Wilkerson at 214 812 8819.
Sincerely, i
C. L. Terry By:
M D. R. Woodlan Docket Licensing Manager CLW/grp cc:
Mr. L. J. Callan, Region IV Mr. W. D. Johnson, Region IV Mr. T. J. Polich, NRR Resident Inspectors