ML20100Q464

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Feb 1992 for Grand Gulf Nuclear Station,Unit 1
ML20100Q464
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 02/29/1992
From: Cottle W, Daughtery L
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GNRO-92-00027, GNRO-92-27, NUDOCS 9203160249
Download: ML20100Q464 (5)


Text

...

~, _ -

7 ENTERGY ET """*"**'

Ry

,n. fem ME 3P 50 i

LitD1Q?GMU e

e

-.-~. ~,

VI,T.Couto a+.a 4 i

March 11, 1992-

.v-i U.S., Nuclear Regulatory C9 mission Mail Station PI-137 Washingcon, D.C.

20555 Attention:

Document Control Desk 4

Subject:

Grand Gulf Nuclear Station Unit 1 i.

Docket Nc. 50-416 i

License No. NPF-29 Monthly Operating Report GNRO-92/00027 o

Gentlemen:

In accordanca with the requirement of Technical Specification 6.9.1.10, Entergy Operations is providing the Monthly Operating Report for Grand Gulf Nuclear Station Unit I for February 1992 (attechment).

If you have any questions or require additional ini'omation, please contact this office.

Yours trulj, nn asuz=

-WTC/TMC/cg atcachments: 1.

Operating Status-2.

Average Daily Power Level L

3.

Unit Shutdowns and Power Reductions-cc:

(Seenextpage)-

f'-

L 1

4 1*

I

'%203100249 900229 POR-ADOCK 05000414 A, /

R PDR M00PJAk

  • //

Y 4.

l-Narch 11, 1992 GNRO 92/00027 Page 2 of 3 cc:

Mr. D. C. Hinti (w/a)

Mr. J. L. Nathis (w/a)

{

Nr.R.'B.McGehee(w/a)

Mr. N. S. Reynolds (w/a)

Mr. H. l.

Thomas (w/0)

.o Mr. Stewart D. Ebneter (w/a)

Regional Administrator f

U.S. Nuclear Regulatary Contnission e

Region II 101 Mariette St.,, N.W., Suite 2900 Atlants, Georgia 30323.

1 Mr. P. W. O'Connor, Project Manager (w/a)

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Cosnmission Mail St6p 13H3 Washington, D.C.

20555 i,

e s

t r-a i'

[

j i

fiOOPJAN 1

__ a w

n

' to GNRO-92/00027 i

DOCKET NO.

50-416 IJNIT 1

o DATE 03/05/92 COMPLETED BY 't. F. Daughtery TZLEPHONE 601-4379 334 MONTH _ February 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 1195 17 1172 2

1192 18 1176 3

1189 19 1187 4

1169 20 1188 5

1J97 21 1109 6

1196 22 155 7

1196 23 966 8

1184 24 1033 9

1201 25 1177 10 1196 26 1195 11 1186 27 1188 12 1102 28 1181 13 (154 29 1173 14 1150 30 N/A 15 114s' 31 N/A 16 1171 M00PFEB/SCMPFLR m,.

m

,.. to GNRO-92/00027 UNIT SHUTDOWNS AND POWER V.blO 0NS DOCKET NO.

50-416 UNIT NAME i

DATE 03/05/92 COMPLETED BY L. F. Daughtery I

TELEPHONE 601-437-2334 REPORT MONTH February 1992

~~

l j

l l

Method of l Licensee l

l Cause & Corrective l

No. l Date Type JDuration) Reason l Shutting Downj Event System l Component l Action To l

l (1)

Hours j

(2)

Reactor Report #

Code l Code i

Prevent Recurrence l

4 l

i (3)

(4) l (5) l (C&CA) l i

l I

91-02/22/92 S

76 B

5 N/A l

N/A N/A

.Rx thermal power reduction to

. 016 i

l l

l j

j

,approximately 65% for control rod l l sequence exchange.

l 1

I i

l l

l l

l l

l l

UNIT SHUTDOWNS AND POWER REDUCTIONS 1

2 3

4 F: Forced Reason:

Method:

Exhibit G - Instructions 5: Scheduled A-Equipment Failure 1-M?nual for Preparation of Data (Explain).

2-Manual Scram Entry Sheets for Licensee B-Maintenance or. Test 3-Automatic Scram Event Report (LER)

C-Refueling 4-Continued File (NUREG-0161)

D-Regulatory Restriction 5-Reduced load

..E-Operator Training &

6-Other Licensing Examination F-Administrative 5

G-Operational Error Exhibit 1-Same Source (Explain)

H-Other (Explain)

MOOPFEB/SCMPFLR

_ _ _ _.___-__-_ - _-___- _ - to_GNRO-92/00027 DOCKET NO.

50-416 DATE 03/05/92 COMPLETED'BY L. F. Daughtery TELEPHONE (601)437-2334 OPERATING STATUS 1.

Unit Name:-GGNS UNIT 1 Notes:

2.

Reporting Period:

February 1992 3.

Licensed Thermal Power (MWT): 3833 MWT 4.

Nameplate Rating (Gross NWE):-1372.5 MWE 5.

Design Electrical Rating (Net MWe): 1250 MWE 6.

Maximum Dependatle Capacity (Gross MWe): 1190 MWE 7.

Maximum Dependable Capacity (Net MWe)(:

1143 MWE If Changes Occur in Capacity Ratings 8.

Give Reasons:

Items Number 3 Through 7) Since Last Report.

N/A 9.

Power Level To Which Restricted, In My Net MWe):

N/A

10. Reasons For Restrictions, If Any:

N ?.

9 This Month Yr to Date Cumulative

11. Hours In Reporting Period 696 1,440 64,522
12. Number of Hours Reactor Was Critical 696.0-1,267.0-51,464.1
13. Reactor Reserve Shutdown Hours 0

0 0-

14. Hours-Generator On-Line 696.0

-1,216.0.

49,266.4

- 15. Unit Reserve Shutdown Hours 0

-0 0

16. Gross Thermal: Energy-Generated (MWH) 2 602,8 W 4,472,402 170,-195,5E
17. Gross Electrical Energy Generated (MWH)-

-834,231 1,434,506 54,004,616

-18. Net Electrical Energy Generated (MWH)

-801,788 1,374,fM 51,635,003

19. Unit Service Factor

-100.0-84.4 79.1

20. Unit Availability Factor 100.0 84.4-79.1
21. Unit Capacity Factor (Using MDC Net)-

100.8 83.5 75.2

22. Unit Capacity Factor (Using DER Net) 92.2

- 76.4-68.2

23. Unit Forced Outage Rate

'0 15.6

-6.7 2a. Shutdowns Scheduled Over Next 6 Months:(Type,-Date, and. Duration of Each):

Begin Refueling Outage - 5 on 04/17/92 for an estimated duration of 46 days.

25. If Shut Down At End of Report Period. Estimated:Date of Startup:

NA

26. Units In Test Status (Prior to Commercial _0peration).

Forecast-Achieved INITIAL CRITICALITY "08/18/82L INITIAL-ELECTRICITY 10/20/84 COMMERCIAL OPERATION 07/01/85 M00PFEB/SCMPFLR

~

- -.