ML20100Q464
| ML20100Q464 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 02/29/1992 |
| From: | Cottle W, Daughtery L ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GNRO-92-00027, GNRO-92-27, NUDOCS 9203160249 | |
| Download: ML20100Q464 (5) | |
Text
...
~, _ -
7 ENTERGY ET """*"**'
Ry
,n. fem ME 3P 50 i
LitD1Q?GMU e
e
-.-~. ~,
VI,T.Couto a+.a 4 i
March 11, 1992-
.v-i U.S., Nuclear Regulatory C9 mission Mail Station PI-137 Washingcon, D.C.
20555 Attention:
Document Control Desk 4
Subject:
Grand Gulf Nuclear Station Unit 1 i.
Docket Nc. 50-416 i
License No. NPF-29 Monthly Operating Report GNRO-92/00027 o
Gentlemen:
In accordanca with the requirement of Technical Specification 6.9.1.10, Entergy Operations is providing the Monthly Operating Report for Grand Gulf Nuclear Station Unit I for February 1992 (attechment).
If you have any questions or require additional ini'omation, please contact this office.
Yours trulj, nn asuz=
-WTC/TMC/cg atcachments: 1.
Operating Status-2.
Average Daily Power Level L
3.
Unit Shutdowns and Power Reductions-cc:
(Seenextpage)-
f'-
L 1
4 1*
I
'%203100249 900229 POR-ADOCK 05000414 A, /
R PDR M00PJAk
- //
Y 4.
l-Narch 11, 1992 GNRO 92/00027 Page 2 of 3 cc:
Mr. D. C. Hinti (w/a)
Mr. J. L. Nathis (w/a)
{
Nr.R.'B.McGehee(w/a)
Mr. N. S. Reynolds (w/a)
Mr. H. l.
Thomas (w/0)
.o Mr. Stewart D. Ebneter (w/a)
Regional Administrator f
U.S. Nuclear Regulatary Contnission e
Region II 101 Mariette St.,, N.W., Suite 2900 Atlants, Georgia 30323.
1 Mr. P. W. O'Connor, Project Manager (w/a)
Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Cosnmission Mail St6p 13H3 Washington, D.C.
20555 i,
e s
t r-a i'
[
j i
fiOOPJAN 1
__ a w
n
' to GNRO-92/00027 i
DOCKET NO.
50-416 IJNIT 1
o DATE 03/05/92 COMPLETED BY 't. F. Daughtery TZLEPHONE 601-4379 334 MONTH _ February 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 1195 17 1172 2
1192 18 1176 3
1189 19 1187 4
1169 20 1188 5
1J97 21 1109 6
1196 22 155 7
1196 23 966 8
1184 24 1033 9
1201 25 1177 10 1196 26 1195 11 1186 27 1188 12 1102 28 1181 13 (154 29 1173 14 1150 30 N/A 15 114s' 31 N/A 16 1171 M00PFEB/SCMPFLR m,.
m
,.. to GNRO-92/00027 UNIT SHUTDOWNS AND POWER V.blO 0NS DOCKET NO.
50-416 UNIT NAME i
DATE 03/05/92 COMPLETED BY L. F. Daughtery I
TELEPHONE 601-437-2334 REPORT MONTH February 1992
~~
l j
l l
Method of l Licensee l
l Cause & Corrective l
No. l Date Type JDuration) Reason l Shutting Downj Event System l Component l Action To l
l (1)
Hours j
(2)
Reactor Report #
Code l Code i
Prevent Recurrence l
4 l
i (3)
(4) l (5) l (C&CA) l i
l I
91-02/22/92 S
76 B
5 N/A l
N/A N/A
.Rx thermal power reduction to
. 016 i
l l
l j
j
,approximately 65% for control rod l l sequence exchange.
l 1
I i
l l
l l
l l
l l
UNIT SHUTDOWNS AND POWER REDUCTIONS 1
2 3
4 F: Forced Reason:
Method:
Exhibit G - Instructions 5: Scheduled A-Equipment Failure 1-M?nual for Preparation of Data (Explain).
2-Manual Scram Entry Sheets for Licensee B-Maintenance or. Test 3-Automatic Scram Event Report (LER)
C-Refueling 4-Continued File (NUREG-0161)
D-Regulatory Restriction 5-Reduced load
..E-Operator Training &
6-Other Licensing Examination F-Administrative 5
G-Operational Error Exhibit 1-Same Source (Explain)
H-Other (Explain)
MOOPFEB/SCMPFLR
_ _ _ _.___-__-_ - _-___- _ - to_GNRO-92/00027 DOCKET NO.
50-416 DATE 03/05/92 COMPLETED'BY L. F. Daughtery TELEPHONE (601)437-2334 OPERATING STATUS 1.
Unit Name:-GGNS UNIT 1 Notes:
2.
Reporting Period:
February 1992 3.
Licensed Thermal Power (MWT): 3833 MWT 4.
Nameplate Rating (Gross NWE):-1372.5 MWE 5.
Design Electrical Rating (Net MWe): 1250 MWE 6.
Maximum Dependatle Capacity (Gross MWe): 1190 MWE 7.
Maximum Dependable Capacity (Net MWe)(:
1143 MWE If Changes Occur in Capacity Ratings 8.
Give Reasons:
Items Number 3 Through 7) Since Last Report.
N/A 9.
Power Level To Which Restricted, In My Net MWe):
N/A
- 10. Reasons For Restrictions, If Any:
N ?.
9 This Month Yr to Date Cumulative
- 11. Hours In Reporting Period 696 1,440 64,522
- 12. Number of Hours Reactor Was Critical 696.0-1,267.0-51,464.1
- 13. Reactor Reserve Shutdown Hours 0
0 0-
- 14. Hours-Generator On-Line 696.0
-1,216.0.
49,266.4
- 15. Unit Reserve Shutdown Hours 0
-0 0
- 16. Gross Thermal: Energy-Generated (MWH) 2 602,8 W 4,472,402 170,-195,5E
- 17. Gross Electrical Energy Generated (MWH)-
-834,231 1,434,506 54,004,616
-18. Net Electrical Energy Generated (MWH)
-801,788 1,374,fM 51,635,003
- 19. Unit Service Factor
-100.0-84.4 79.1
- 20. Unit Availability Factor 100.0 84.4-79.1
- 21. Unit Capacity Factor (Using MDC Net)-
100.8 83.5 75.2
- 22. Unit Capacity Factor (Using DER Net) 92.2
- 76.4-68.2
- 23. Unit Forced Outage Rate
'0 15.6
-6.7 2a. Shutdowns Scheduled Over Next 6 Months:(Type,-Date, and. Duration of Each):
Begin Refueling Outage - 5 on 04/17/92 for an estimated duration of 46 days.
- 25. If Shut Down At End of Report Period. Estimated:Date of Startup:
NA
- 26. Units In Test Status (Prior to Commercial _0peration).
Forecast-Achieved INITIAL CRITICALITY "08/18/82L INITIAL-ELECTRICITY 10/20/84 COMMERCIAL OPERATION 07/01/85 M00PFEB/SCMPFLR
~
- -.