ML20100P809
| ML20100P809 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 03/01/1996 |
| From: | FLORIDA POWER CORP. |
| To: | NRC |
| Shared Package | |
| ML20100P811 | List: |
| References | |
| NUDOCS 9603110366 | |
| Download: ML20100P809 (1) | |
Text
-.
Document Transmittal #: 41796 Date: 3/2/96 To:
NRC RES INSPECTOR MAC: NSCC Destination:
==
Description:==
Copy Copy Totals Document:
Revision:
Comment:
INFO CNTL MSTR SP0301 93 8
1 0
0 SPO406 21 8
1 0
0 l
instructions to the Addressee:
Please verify the document (s) received agrees with the above information. Be sure to destroy document (s) or portions of document (s) superseded by the above.
The signature indicates acknowledgment of receipt of the above document (s). Retum signed and dated transmittal to Document Control within 20 days at mall code:
NA10 Florida Power Corporation Document Control, NA1C 070003 Crystal River Energy Complex 15760 W. Power Line St.
Crystal River, FL 34428-6708 I
Signature of Addressee:
Date:
Independent Verification:
Date:
(Control Room documents only)
'}gh 9603110366 960302 PDR ADOCK 05000302 P
\\\\
)