h "fR(fE0 Arizona Nuclear Power Project O M h 3 ra> i2 3 7 P.o. sox 52034
ANPP-31256-TDS/TRB U. S. Nuclear Regulatory Commission Region-V 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention: Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Projects Time Extension For Report - DER 84-53
Subject:
A 50.55(e) Potentially Reportable Deficiency Relating To Bonnet And Diaphragm Nuts And Bolts Found Icose On PC And CH Valves.
File: 84-019-026; D.4.33.2
Reference:
A) Telephone Conversation between P. Narbut and T. Bradish on August 17, 1984 B) ANPP-30533, dated September 17, 1984 (Interim Report)
C) ANPP-31045, dated November 2, 1984 (Time Extenslen)
D) ANPP-31161, dated November 16, 1984 (Time Extension)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (B),
At that and Time Extensions were requested by References (C) and (D).
time, it was estimated that a Final Report would be available by November 29, 1984.
Due to the extensive investigation and evaluation required, it is now 15, 1984, at expected that this information will be finalized by January which time a complete report will be submitted.
There is no new information or change to the Interim Report at this time.
Very truly youis, bbh E. E. Van Brunt, Jr.
APS Vice President 8412140029 841129 Nuclear Production PDR ADOCK 05000528 S
PDR ANPP Project Director EEVB/TRB/nj cc: See Page Two
.p
1
-s.
Mr.tD.'F. Kirsch-DER 84-53 Page.The cc:
Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 T. G. Woods, Jr.
D. B. Karner W. E. Ide D. B. Fasnacht A.
C.' Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo B. S. Kaplan J. R. Bynum
-J. d. Allen A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson R. P. Zimmerman L. Clyde M. Matt T. J. Bloom Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339 i
+