Interim Deficiency Rept DER 84-62 Re Load Sequencer Not Functioning Properly During Safeguards Testing.Initially Reported on 840817.Due to Extensive Investigation & Evaluation Required,Next Rept Delayed Until 841212
ML20100P055
Person / Time
Site: Palo Verde  
Issue date: 11/30/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-31262-TDS, DER-84-62, NUDOCS 8412130610
Download: ML20100P055 (2)


Text

.

b Arizona Nuclear Power Project

$ $ -g g g y P.o. BOX 52034

  • PHOENIX, ARIZONA 85072-2034 November 30, 190 @ 0 W ANPP-31262-TDS/TRB U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention: Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Projects

Subject:

Time Extension For Report - DER 84-62 A 50.55(e) Potentially Reportable Deficiency Relating To Load Sequencer Did Not Function Properly During Safeguards Testing.

File: 84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between P. Narbut and T. Bradish on August 17, 1984 (B) ANPP-30531, dated September 17, 1984 (Interim Report)

(C) ANPP-30794, dated October 11, 1984 (Time Extension)

(D) ANPP-31001, dated October 30, 1984 (Time Extension)

(E) ANPP-31131, dated November 14, 1984 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (B),

and Time Extensions were requested by References (C), (D), and (E).

At that time, it was estimated that a Final Report would be available by November 30, 1984.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by December 12, 1984, at which time a couplete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours, h

(

E. E. Van Brunt, Jr.

APS Vice President Nuclear Production ANPP Project Director EEVB/TRB/nj cc: See Page Two 8412130610 841130 PDR ADOCK 05000528 l 9 6

S PDR ZH7

anw ' g:

' Mr. D. F. Kirsch DER 84-62 Page Two

' ec:-

Richard'DeYoung, Director-

0ffice of-Inspection and Enforcement U.'S. Nuclear Regulatory' Commission Washington, D. C.

20555 T. G. Woods, Jr.

D. B. K..rner W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo B. S. Kaplan J. R. Bynum J. M. Allen 1

A. C. Gehr W. J. Stubblefield W.'G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson R. P. Zimmerman L. Clyde M. Matt T. J. Bloom Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339