Special Rept:On 960131,auxiliary Bldg Pipe Sleeve,Mark 1860 on Elevation 669 Breached.Roving Fire Watch Established After Fire Detectors on One Side of Penetration Verified Operable
ML20100N309
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 02/29/1996
From: Shell R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9603060263
Download: ML20100N309 (3)


Text

i 4

a , .

l Hl4 Tennessee Valley Authority. Post Office Box 2000, Soddy-Daisy, Tennessee 37379-2000 February 29,1996 I

>b v. . . ,

U.S. Nuclear Regulatory Commission .. +. l ATTN: Document Control Desk 116 liar -5 NO $3 Washington, D.C. 20555 l

PUBLIC DOCUMENT R001 Gmle In the Matter of ) Docket No. 50-327 Tennessee Valley Authority )

SEQUOYAH NUCLEAR PLANT (SQN) - UNIT 1 - FACILITY OPERATING LICENSE DI a TECHNICAL SPECIFICATION (TS) 3.7.12 - SPECIAL REPORT 96-01 The enclosed special report provides details concerning a Unit 2 auxiliary building pipe sleeve penetration that is nonfunctional as a fire barrier. This fire barrier was intentionally removed from service to facilitate the installation of a drain line through this penetration. The sleeve penetration was nonfunctional as a fire barrier for a time period greater than the TS allowable timeframe.

This report is being submitted in accordance with TS Action Statement 3.7.12(a).

If you have any questions regarding this submittal, please telephone S. D. Gilley at (423) 843-7427.

Sincerely, hk.

R.H. Shell Enclosure cc: See page 2 D DO b327 S PDR ocowr Y?} n

~ .

l U.S. Nuclear Regulatory Commission Page 2 February 29,1996

)

cc (Enclosure):

Mr. D. E. LaBarge, Project Manager l U.S. Nuclear RegulatonfCommission . -

One White Flint, North .

I1555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident inspector i Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region 11 101 Marietta Street,NW, Suite 2900 Atlanta, Georgia 30323-2711 1

i l

\

~

1

i e

4. ,. ,

I i

ENCLOSURE i SEQUOYAH NUCLEAR PLANT UNIT 1 SPECIAL REPORT 96-01  !

Descriotion of Condition On January 31,1996, the auxiliary building pipe sleeve, Mark No. I860 (A), located on Floor Elevation 669 was breached. This fire barrier was intentionally removed from service to support the installation of a drain line through this penetration. The penetration was breached in excess of the -

technical specification (TS) allowable timeframe of seven days. This condition is being reported in accordance with TS Action Statement 3.7.12(a).

Cause of Condition The penetration was breached in order to install a 1-1/2 inch drain line through the penetration. This i drain line was installed as part of a steam generator blowdown sample panel installation. Because of inclement weather in which nonessential personnel could not reach the site, the penetration was not ,

rescaled within the seven-day timeframe required by technical specifications.

Corrective Action .

s Ir. accordance with Limiting Condition for Operation Action Statement 3.7.12(a), a roving fire watch  ;

was establiched siter the fire detectors on one side of the penetration were verified operable. A roving fire watch was initiated and was maintained until the fire barrier was reestablished. The -

penetration was rescaled and the fire barrier was reestablished on February 16,1996. .