Application for Amend to Licenses NPF-11 & NPF-18,changing Tech Spec Table 3.6.3-1 Re Primary Containment Isolation Valves.Fee Paid
ML20100N023
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 04/01/1985
From: John Marshall
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20100N027 List:
References
9940N, NUDOCS 8504180053
Download: ML20100N023 (2)


Text

_ _ _ _

.g

.t,ommoncocith Edison

'One First National Plaza. Chicago, Ilknois 0 Address Reply to Post Office Box 767 5 Chicago, Illinois 60690 j= ~

April 1, 1985 y' J

Mr. Harold R. Denton, Director i0ffice of Nuclear Reactor Regulation EU.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

LaSalle County Station Unit 1 & 2 Proposed Amendment to Technical Specification for Facility Operating License tPF-ll and NPF-18 Reactor Feedwater Inboard Check Valves Type C Test NRC Docket No. 50-373 and 50-374 References (a): USFSAR Figure 6.2-31 (b):

Technical Specification Page 3/4 6-32 1

(c):

C. W. Schroeder letter

'_o H. R. Denton dated November 17, 1983 (d):

Confirmatory Action letter dated November 28, 1983.

(e):

C. W. Schroeder letter to J. G. Keppler dated December 14, 1983 (f):

D. L. Farrar letter to J. G. Keppler dated February 9, 1984.

Dear Mr. Denton:

Pursuant to 10 CFR 50.59, Commonwealth Edison propo;es to amend Appendix A, Technical Specification, to Facility Operating Licenses NPF-ll and NPF-18.

These amendment changes are being submitted for your staf f's review and approval as an exigent change request. LaSalle Unit 1 is now in a forced extension of a planned outage to implement repairs of the inboard feedwater check valve soft seats necessitated by failure of a Type C leak rate test.

The proposed change is enclosed in Attachment A.

The attached change has received both On-Site and Of f-Site review and approval. We have reviewed this amendment request and finc that no signj ficant hazards conside-ration exists. Our review is documented in Attachment D.

Commonwealth Edison is notifying the State of Illinois of our request for this amendment by transmitting a copy of this letter and its attachments to the designated State Official.

0 ii

'0 Op'.)Ol6 8504180053 85040 PDR ADOCK 05000373

') Ao P

PDR

+4 H. R. Denton' April 1, 1985 Please direct any questions you may have.concerning this matter to this office. A fee remittance of $150.00 is enclosed.

Three (3) signed originals and thirty-seven (37) copies of this transmittal and its attachments are provided for your use.

Very truly yours, g.n. w #

J. G. Marshall Nuclear Licensing Administrator Attachments (A)': Technical Specification Change to NPF-ll (B): Background

-(C):. FSAR Figure (D): Evaluation of Significant Hazards Consideration cc: Region III Inspector - LaSalle