ML20100L157

From kanterella
Jump to navigation Jump to search
Forwards Status of Emergency Repsonse Facility Computer Sys & RM-21 Dose Assessment Computer Sys,Per J Montgomery Request
ML20100L157
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 04/08/1985
From: Kuykendall J
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Hunter D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
TNRC-85013, NUDOCS 8504160401
Download: ML20100L157 (2)


Text

e

~

3*

TNRC-85013 TEXAS UTILITIES GENERATING COMPANY P. O. BOX 2300

  • GLEN ROSE, TEXAS 76043 undIIu"c[Un"odnities.

April 8,1985 I...]

~

e u. {)'

+

uv I,

Mr. Dorwin Hunter U. S. Nuclear Regulatory Commission N

Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011

SUBJECT:

Status of the Emergency Response Facility (ERF)

Computer System and the RM-21 Dose Assessment Computer System

Dear Mr. Hunter:

In keeping with Mr. Jim Montgomery's request to ensure your a

office is informed of the status of the RM-21 and ERF computer systems, we have provided the attached status sheet concerning these systems.

If you have any questions or require additional information, please contact Mr. Jay Laughlin at 817/897-4856, extension 3756.

Sincerely, 1

JCK:sjb Attachments cc: Messrs. J. B. Baird D. L. Kelley PIMS g@

pesam@

po,q

TNRC-85013 ATTACHMENT

SUBJECT:

Status of the Emergency Response Facility (ERF) Computer System and the RM-21 Dose Assessment Computer System System Status RM-21 Has been turned over to CPSES Operations.

Programs for maintenance, operation, cali.

bration, and training on this system are

'in effect.

ERF Scheduled turnover date is June 1, 1985.

Turnover has been delayed due to equipment problems. Please refer to the attached copy of TXX-4447 which provides additional information concerning these problems.

Programs for maintenance, operation, cali-bration, and training have been developed and either have been or are ready to be placed in effect upon system turnover.

4

TEXAS UTILITIES GENERATNG COMPANY mKYWAY TOWER. 4tto NORTH tlLlVE >THEET. L.B. Mt

  • DALt.Am.TF.1Am 7320B E'.S.!"&LT.Lb.

March 25, 1985 mt TXX-4447 Mr. D.R. Hunter, Chief Reactor Project Branch 2 U.S. Nuclear Regulatory Commission Office _of Inspection & Enforcement 611 Ryan Plaza Drive, Suite 1000 Docket No.: 50-445

, Arlington, TX 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION ERF COMPUTER TERMINATION P0INTS QA FILE:.CP-85-06, SDAR-167 FILE N0.:

10110

Dear Mr. Hunter:

On February 1, 1985 we verbally notified your Mr. D. Hunnicutt of a deficiency regarding termination points that have been found to be cracked or broken.

We have submitted an interim report logged TXX-4423 dated February 25, 1985.

We have completed our investigation and concluded that the matter is not reportable under 10CFR50.55(e). Records supporting this determination are available for your inspector's review at the CPSES site.

Very truly yours,

,/ b

?

t, BRC:tig cc: -NRC Region IV (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U.S. Nuclear Regulatory Commission Washington, DC 20555 RECEIVED 4 e4y am s, s e, MAR 2 61985 y

yp,xu v

OPERAll0NS SUPPORT Qp, A ibis'l>lON tst* tt:k An t*TIL8 Tit:N ELis'TNit' tDMI'ANY