ML20100H625
| ML20100H625 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 11/20/1984 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Kirsch T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| ANPP-31192-TDS, DER-84-25, NUDOCS 8412100048 | |
| Download: ML20100H625 (2) | |
Text
p
~
.lll'E0 Arizona Nuclear Power Project l'!$/ M {'t p P O. BOX 52034 e PHOENIX ARIZONA 85072-2034 November 20, 198'IfCIC.'i t'u;,:
ANPP-31192-TDS/LBS U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention: Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Projects
Subject:
Time Extension For Report - DER 84-25 j
A 50.55(e) Potentially Reportable Deficiency Relating To Containment Supply Registers Would Not Cycle.
File: 84-019-026; D.4.33.2
Reference:
(A) Telephone conversation between P. Narbut and T. Bradish on May 1, 1984 (B) ANPP-29611, dated May 29,1984 (Interim Report)
(C) ANPP-30256, dated August 16, 1984 (Time Extension)
(D) ANPP-30564, dated September 19, 1984 (Time Extension)
(E) ANPP-30855, dated October 15,1984 (Time Extension)
(F) ANPP-30999, dated October 30, 1984 (Time Extension)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Refet:nce (B),
and Time Extensions were requested by References (C), (D), (E) and (F).
At that time, it was estimated that a Final Report would be available by November 16, 1984 Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by November 28, 1984, at which time a complete report will be submitted.
There is no new information or change to the Interim Report at this time.
Very truly yours h
n ULA-E. E. Van Brunt, Jr.
APS Vice President Nuclear Production ANPP Project Director EEVB/TRB/nj cc: See Page Two O
Ifr1 s
,y c-g, 3,:::iy[,
~
w.
n.-
<Mr.'D.:F. K'irsch
~
~
? DER 84-25 Page Two-
?cc: --Richard.DeYoung,_ Director?
O
' Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission -:
Washington, D. C.-
20555 T.;G. Woods Jr.
D. B. Karner
. W. E. Ide-D. B..Fasnacht
--A. C. Rogers L'.-'A. Souza D. E. Fowler T. D. Shriver C. N. Russo B. S. Kaplan-J.-R. Bynum J. M. Allen A. C. Gehr
- W. J. Stubblefield W.'G. Bingham R. L. Patterson.
R. W. Welcher H.'D. Foster D. R. Hawkinson R. P. Zimmerman L
M.;L.'Clyde T. J. Bloom
-Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500-
. Atlanta, GA 30339 V
4
= - :-
-