ML20100G612
| ML20100G612 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 03/14/1985 |
| From: | Edelman M CLEVELAND ELECTRIC ILLUMINATING CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| RDC-(120(84)), NUDOCS 8504080315 | |
| Download: ML20100G612 (1) | |
Text
,
T,.p.
2-J' i F U r i+ C L n ?! G Iln.. p p T i i,f'
- i. j j b' t
- A
' O
_v i>
+<
~u 2
eLu
+> u P.O. BOX 5000 - CLEVELAND. OHIO 44101 - TELEPHONE (216) 622-9800 - BLLUMINATING BLOG. - 55 PUBLICSQUARE Servmg The Best Location in the Nation MUPRAY R. EDELMAN March 14, 1985 Ju-g/g ', -_ - _
VICE PRESIDENT i
nuctsAn g
Mr. James G. Keppler
- [I[
- p Regional Administrator, Region III Office of Inspection and Enforcement k C l_~_I I
U.S. Nuclear Regulatory Commission h
y 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE:
Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Topaz Class lE Inverters RDC [120(84)1
Dear Mr. Keppler:
Relative to our report dated February 7, 1985, concerning Topaz Class 1E Inverters, this letter serves to clarify our planned completion date for Unit 2 Inverters.
All work required to resolve this deficiency as it relates to Unit 1 is now completed.
As previously reported, Unit 2 will be covered in the same manner as Unit 1 inverters by Field Disposition Instructions WRXD and WRXJ.
This work will be completed consistent with Unit 2 construction schedule.
incerely Murr R. Edelman Vice President Nuclear Group MRE:pab cc:
Mr. J. A. Grobe USNRC, Site Office Mr. D.
E. Keating USNRC, Site Office Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 U.S. Nuclear Regulatory Commission c/o Document Management Branch Washington, D.C.
20555 Records Center, SEE-IN Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 d d)'
Atlanta, Georgia 30339 k^" DOS!!885Lo p.22 #
qo PDR