ML20100G116
| ML20100G116 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 11/14/1984 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| ANPP-31131-TDS, DER-84-62, NUDOCS 8412070161 | |
| Download: ML20100G116 (2) | |
Text
v,.
h Y
Arizona Nuclear Power Project P.O. DOX $2034 e PHOENIX, ARIZONA 85072-2034 Q jfff l g ] l}- }g November 14, 1984 ANPP-31131-TDS/TRB MiPOTW: n U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention:
Mr. T. W. Bishop, Director Division of Reactor Safety and Projects
Subject:
Time Extension For Report - DER 84-62 A 50.55(e) Potentially Reportable Deficiency Relating To Load Sequencer Did Not Function Properly During Safeguards Testing.
File: 84-019-026, D 4.33.2
Reference:
(A) Telephone conversation between P. Narbut and T. Bradish on August 17, 1984 (B) ANPP-30531, dated September 17, 1984 (Interim Report)
(C) ANPP-30794, dated October 11, 1984 (Time Extension)
(D) ANPP-31001, dated October 30, 1984 (Time Extension)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Reference (A),
an Interim Report was transmitted by Reference (B), and Time Extensions were requested by References (C) and (D). At that time, it was estimated that a Final Report would be available by November 14, 1984.
Due to the extensive investi ation and evaluation required, it is now 8
expected that this information will be finalized by November 30, 1984, at which time a complete report will be submitted.
There is no new information or change to the Interim Report at this time.
{
Very truly ou a, cc C.C.
CLQ -
GLA L E. E. Van Brunt, Jr.
APS Vice President Nocicar Production ANPP Project Director EEVB/TRB/nj cc: See Page Two 8412070161 841114 I D PDR ADOCK 05000528 3 t-h]
6 PDR
rf
... ~ _.
Ap.
-.A s.i
- f
,m-y).
'Mr. T. W. Bishop
' DER 84-62 Page Two
.cc:
Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.~ C. !20555 a
p ".
T..G. Woo'ds, Jr.
D. B. Karner W.l E. Ide D. E. Tasnacht A. 01 Rogers L. A. Souza D. E. Fowler T.'. D. Shriver.-
C. N. Russo B. S. Kaplan J. R. Bynum J. M. Allen A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson R. P. Zimmerman L. Clyde M. Woods i
T. J. Bloom Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500t' aAtlanta, GA 30339 5
9 i
e.
Y-a a
.t?
b e
ll
' v'[.. -
?~
'. V '
~
l
-