Monthly Operating Rept for Feb 1985
ML20100D871
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 02/28/1985
From: Blatt M
CONSOLIDATED EDISON CO. OF NEW YORK, INC.
To:
Shared Package
ML20100D862 List:
References
NUDOCS 8504030170
Download: ML20100D871 (5)


Text

.

}l

,i OPERATING DATA REPORT

{2 DOCKET No. 50-247 44 D/.TE '4/7/R;

[$,f COMPLETED IlY M nbt -

TELLi'll0NE (9I4I WII27 M

  • *5 -

OPERATING STATUS k4.

Notes

'a

1. Unit Name:

Indian Point Statinn linit #7 February 1985 i I

2. Reporting Period:

2758 kN

3. Licensed Thermal Power (MWt):

1013

%[N..-

6. Maximum Dependable Capacity (Gross MWe):
4. Nameplate Rating (Gross MWe):

873

~

U Si Design Electrical Rating (Net MWe):

D 864 14 7., Maximum Dependable Capacity (Net MWe):

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:

None. ~

~.

gy D-b.. ~

10. Reasons For Restrictions.If Any:

Nnna

9. Power Level To which Restricted. lf Any (Net MWe):

M U?

4 m

f; [ ~g

=~ w a _.

~

~=M = -

~%,

$p=g7%;b -

"cm.

.t

~;

ig 2%,^'".

. HisMonth C Yr to Date Cumulative E,,2,1416 '

u.

T jd ge.a a.. _

m..

93 505' 4-m,

~

~ 0 ~ T11. HoursInReportingPeriod

'672

[$.t. ~

12. Number Of Hours Reactor was criticy 650.22 1 390.14 62 ns; As 16.42 18.42 2 364.12.-

ku -; : 13. Reactor Reserve Shutdown Hours 616.65 1 'na m

~

m nRa tm h :~

14. Hours Generator On-Line 0

0 0

f

~

' "15. Unit Reserve Shutdown Hours 1 669 551 3 628 470 156 332 845 N

- 16. Gross Thermal Energy Generated (MWH) 56 410 1 154 860' 48 472 476 f.h

17. Gross Electrical Energy Generated (MWH) 509 581 1 112 4R7 46 226 394 Y

~-

18. Net Electrical Energy Generated (MWH)

W.6 94.2 6?.3 E.

- l 9. Unit Serdee Factor..

~

1 91_R 94.2~ -

64.3 C ?"

- ~ J : 20. Unit Availability Factor 87.8 90.9 57_5 h(I "

28. Unit Capacity Factor (Using MDC Net) 86.9

-90.0

-56.6

22. Unit Capacity Factor IUsing DER Net)

U.

5.8 9.6

}3. Unit Forced Outage Rate

24. Shutdowns Scheduled Oser Ne.st 6 Months (Type.Date.and Duration of Eachl:

]}.

ii^m g.

! d,.

25. If Shut Down At Ehd Of Report Period. Estimated Date of Senatup:
26. Units in Test Status tPrior to Commercial Operation):

Forecast' Achiesed D]

N/

N/A M].

INITIAL CRITICALITY N/A N/A INITIAL. ELFCTRICI TY N/A N/A S'

COMMl?RCIAL OPI' RATION d

l.k 0504030170 859321 PDR ADOCK 05000247 (9/771 ihit PDR p

kt.

i

g..

.l AVERAGE DAILY uni! POWER LEVEL il 3

1l DOCKET NO.

O 247 4

IP thit tb. 2 WIT DATE 3/7/85 COMPLETED BY M. Blatt 6

I4}

bI TELEPflONE 1

Febnary,1985

,1 -

MONTH DAY AVERAGE DAILY POWER LEVEL

. DAY AVERAGE DAILY POWER LEVEL

!We-Net)

(MWe Net)

A I.

r I7 j

0 855 2

li 0

853 y

3 19 h

487 855 4

f 20 E

E 5

21 802 853 4

6

~

854 856 22 0!

7 23

~

~~

852 854 s

. 24

!).

9 25 856 852 h

853 856 p.!

10 26 Ij i!

E E

27 l

853 12

- 28

~

13 29 d

14 854

30 852 is

- 31

);

851 16 2

s N'

T.;

f INS 1RUC110NS

]

On this format. list the average daily unit power IcvelI...MWe. Net for each day in the reporting month. Compute o the nearest whole megawatt.

e a

bn (9/77)

II j

y o1 3'

'* '"' f. o, c k*

2, 3

' ' * ^.., _..%.he.,

-A hh ms.c.= w

..w www -

,m lMwe,wh.r.wsM& A~

aLLwh

' " :E d U A M * ' - %4M 50-247 DOCKET NO.

UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAME IP thit tb. 2 I

DATE 3/7/85 REPORT MONTil' Fetruarv.1935 COMPLETED BY M. Blatt TELEPilONE (914I W Al?7 E

e

.5?

3

$.Y 5 Licensee

[g K

Cause & Corrective No.

Date g

3g 5

.355 Event

- 'g Q

Action to g

Present Recurrence F

f5 5

5 ;5j c Report #

mO o

u e

6 1

850202 F

46.22 A

2 HA xxxxxxx Gmerator Hydrogen Seal Oil Leak 2

850204 F

9.13 A

3 01 ~

Ptmp XX B Tripped on High Pressurizer Pressure due to loss of 22 IEFP 9

I 2

3T 4

F: Forced Reason:

' Methml:

Exlubit G Instructions S: Scheduled A 1:quipment Failure (Explain)

I I-Manual for Preparation of Data B Maintenance of Test i 2-Manual Scram.

Entry Sheets for Licensee i 3 Automatic Scram.

Event Repor (LERI FileINUREG-C Refueling D Regulatory Restriction 4-Other (Explain) 0161)

E Operator Training & License Examination

}

F Administrative 5.

("!77)

II-Other(Explain)

Exhibit 1.Same Source G-Operational Error (Explain)

3 Summary of Operating Experience 1

1 February 1985 7-j

)A y

9]

69 Indian Point Unit 2 was operating at 100% reactor power at the beginning 1

of the report period.

On Feburary 2, power was reduced and the reactor

'.)b

~

y manually tripped to investigate and correct a problem with the hydrogen j

seal oil unit of the main generator.

The Unit was returned to service ry y

the following day and power gradually brought up to full load conditions.

a; 4

~sy On February 4,

No. 22 main boiler feedwater pump tripped automatically 9

while the Unit was operating at 100% licensed reactor power.

In the

+

q course of reducing power to compensate for the reduction in feedwater flow, the reactor tripped on high pressurizer pressure.

At the time of

,s d

the event, the control rods were in the manual mode and the block valves d

8, associated with the pressurize power operated relief valves were closed.

h,.

9 d

Unit 2 was returned to service on February 5 and on February 6 reactor l

x power was increased to 100%.

Full power was maintained for the remainder of the report period except for brief redu7tions on February 13 to 88% to j

perform corrective maintenance on the hydrogen recombiners, and on 1

i 3j February 28 to 95% due to a temporary reduction in condenser vacuum.

L.g; l1

MAJOR SAFETY RELATED CORRECTIVE MAINTENANCE MWR NO.

SYSTEM COMPONENT DATE WORK PERFORMED 12604 ELEC.

  1. 21 Emergency 2/19/85 Replaced and Diesel Generator set air com-4 pressor pressure

]

switch.

}

18550 ELEC.

  1. 21 Emergency 2/19/85 Replaced sheared j

Diesel Generator taper pin, over-I speed trip.

l l

17168 CRD

  1. 24 Control Rod 2/27/85 Replaced burned Drive Fan out motor.

i L

f-p i;

l E

k' i

6, i

k k

i t

y I

e a

h v

r I.