Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20248B2371998-03-31031 March 1998 Revised Monthly Operating Rept for March 1998 for Indian Point Station Unit 2 ML20029C7801994-03-31031 March 1994 Monthly Operating Rept for Mar 1994 for Indian Point Unit 1. W/940415 Ltr ML20247G5171989-04-30030 April 1989 Monthly Maint Category I Rept Pages from Monthly Operating Rept for Apr 1989 for Indian Point ML20154M5661988-08-31031 August 1988 Monthly Operating Rept for Aug 1988 for Indian Point Station Unit 2 ML20154M5691988-07-31031 July 1988 Revised Page to Monthly Operating Rept for Jul 1988 for Indian Point Station Unit 2 ML20236P9861987-10-31031 October 1987 Monthly Operating Rept for Oct 1987 ML20235Y9681987-09-30030 September 1987 Monthly Operating Rept for Sept 1987 ML20236A5811987-09-30030 September 1987 Monthly Operating Rept for Sept 1987 ML20234D7771987-08-31031 August 1987 Monthly Operating Rept for Aug 1987 ML20237J6511987-07-31031 July 1987 Monthly Operating Rept for Jul 1987 ML20235U7571987-06-30030 June 1987 Monthly Operating Rept for June 1987 ML20215F3711987-05-31031 May 1987 Monthly Operating Rept for May 1987 ML20214H5111987-04-30030 April 1987 Monthly Operating Rept for Apr 1987 ML20214E9541987-04-30030 April 1987 Monthly Operating Rept for Apr 1987 ML20206Q6951987-03-31031 March 1987 Monthly Operating Rept for Mar 1987 ML20206R6201987-03-31031 March 1987 Monthly Operating Rept for Mar 1987 ML20207T1321987-02-28028 February 1987 Monthly Operating Rept for Feb 1987 ML20207R6861987-02-28028 February 1987 Monthly Operating Rept for Feb 1987 ML20206R6451987-02-28028 February 1987 Revised Monthly Operating Rept for Feb 1987 ML20211E1381987-01-31031 January 1987 Monthly Operating Rept for Jan 1987 ML20211J1481987-01-31031 January 1987 Monthly Operating Rept for Jan 1987 ML20212P8891986-12-31031 December 1986 Monthly Operating Rept for Dec 1986 ML20207P9801986-12-31031 December 1986 Monthly Operating Rept for Dec 1986 ML20215E8501986-11-30030 November 1986 Monthly Operating Rept for Nov 1986 ML20211Q0501986-11-30030 November 1986 Monthly Operating Rept for Nov 1986 ML20212L9131986-10-31031 October 1986 Monthly Operating Rept for Oct 1986 ML20214D0211986-10-31031 October 1986 Monthly Operating Rept for Oct 1986 ML20203P1081986-09-30030 September 1986 Monthly Operating Rept for Sept 1986 ML20209J0801986-08-31031 August 1986 Monthly Operating Rept for Aug 1986 ML20214K4281986-07-31031 July 1986 Monthly Operating Rept for Jul 1986 ML20207C3021986-06-30030 June 1986 Monthly Operating Rept for June 1986 ML20207C3171986-06-30030 June 1986 Monthly Operating Rept for June 1986 ML20211F7351986-05-31031 May 1986 Monthly Operating Rept for May 1986 ML20198A2731986-04-30030 April 1986 Monthly Operating Rept for Apr 1986 ML20205P6911986-04-30030 April 1986 Monthly Operating Rept for Apr 1986 ML20141E6071986-03-31031 March 1986 Monthly Operating Rept for Mar 1986 ML20141E6121986-03-31031 March 1986 Monthly Operating Rept for Mar 1986 ML20140B8481986-02-28028 February 1986 Monthly Operating Rept for Feb 1986 ML20154P0171986-02-28028 February 1986 Monthly Operating Rept for Feb 1986 ML20141D2331986-01-31031 January 1986 Monthly Operating Rept for Jan 1986 ML20153E3491986-01-31031 January 1986 Monthly Operating Rept for Jan 1986 ML20140B8541986-01-31031 January 1986 Rev I to Monthly Operating Rept for Jan 1986 ML20140A8211985-12-31031 December 1985 Monthly Operating Rept for Dec 1985 ML20141J1861985-12-31031 December 1985 Monthly Operating Rept for Dec 1985 ML20138P4981985-11-30030 November 1985 Monthly Operating Rept for Nov 1985 ML20138M5941985-11-30030 November 1985 Monthly Operating Rept for Nov 1985 ML20136E8811985-10-31031 October 1985 Monthly Operating Rept for Oct 1985 ML20138J7921985-09-30030 September 1985 Monthly Operating Rept for Sept 1985 ML20205C7241985-08-31031 August 1985 Monthly Operating Rept for Aug 1985 ML20134F6881985-07-31031 July 1985 Monthly Operating Rept for Jul 1985 1998-03-31
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H8501999-10-14014 October 1999 Safety Evaluation Supporting Amend 197 to License DPR-64 ML20206U2551999-02-0909 February 1999 Safety Evaluation Supporting Amend 187 to License DPR-64 ML20236Y1571998-08-0303 August 1998 Part 21 Rept Re ASTM A351,GR. CF8 Matl at Indian Point Being Out of Specifications in Molybdenum & Chromium.Cause & Corrective Actions Are Not Stated ML20236V4281998-07-13013 July 1998 Safety Evaluation of TRs WCAP-14333P & WCAP-14334NP, PRA of RPS & ESFAS Test Times & Completion Times. Repts Acceptable ML20236T5511998-06-24024 June 1998 Consolidated Edison Co of Ny,Indian Point Unit 2,Drill Scenario Number 1998C ML20248B2371998-03-31031 March 1998 Revised Monthly Operating Rept for March 1998 for Indian Point Station Unit 2 ML17264A9381997-07-10010 July 1997 Deficiency Rept Re Potential Safety Hazard Associated w/FM-Alco 251 Engin,High Pressure Fuel tube-catalog: 4401031-2 in Which Dual Failure Mode Exists.Caused by Incorrect Forming Process ML18153A1431997-06-10010 June 1997 Part 21 Rept Re Possible Machining Defect in Certain Stainless Steel Swagelok Tube Fitting Bodies.Facilities Have Been Notified About Possible Problem ML20210E3591997-03-27027 March 1997 Part 21 Rept Re Sorrento Electronics Inc Has Determined Operation & Maint Manual May Not Adequately Define Requirements for Performing Periodic Surveillance of SR Applications.Caused by Hardware Failures.Revised RM-23A ML1005008001997-02-28028 February 1997 Conditional Extension of Rod Misalignment TS for Indian Point 3. ML20115J3981996-07-22022 July 1996 Interim Part 21 Rept Re 3/4 Schedule 80 Pipe Furnished to Consolidated Power Supply.Investigation Revealed Only One Nuclear Customer Involved in Sale of Matl ML20096E5101995-12-31031 December 1995 Resubmitted Rev 13 to QA Program ML17059A3611994-07-0606 July 1994 Emergency Action Level Verification & Validation Rept. ML17311A0181994-05-13013 May 1994 New York State EAL Upgrade Project Verification & Validation Rept. ML20029C7801994-03-31031 March 1994 Monthly Operating Rept for Mar 1994 for Indian Point Unit 1. W/940415 Ltr ML20056E5171993-08-31031 August 1993 Technical Review Rept, Tardy Licensee Actions ML20062J2281993-07-23023 July 1993 Consolidated Edison Co of Ny Indian Point Unit 2,Drill Scenario 1993 ML20118A2681992-12-31031 December 1992 Consolidated Edison Co of Ny Indian Point,Unit 2 Exercise Scenario,1992 ML20125C7161992-12-0707 December 1992 Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl ML20127P5861992-11-23023 November 1992 Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl ML20096H2301992-05-21021 May 1992 Special Rept:On 920504,south Side Lower Electrical Tunnel Detection Sys 8 Taken Out of Svc for Mod to Reposition Detection Sys Run of Conduit.Detection Sys Declared Operable on 920520 After Mod Completed & Sys Retested ML20079F9181991-05-31031 May 1991 Structural Evaluation of Indian Point,Units 2 & 3 Pressurizer Surge Lines,Considering Effects of Thermal Stratification ML20059E9461990-08-31031 August 1990 Nonproprietary Rev 2 to Indian Point 2 Tube Fatigue Reevaluation ML20059G2011990-07-31031 July 1990 Final Rept on Steam Generator Insp, Repair & Restoration Efforts During 1990 Midcycle Insp ML20058K4151990-06-30030 June 1990 Steam Generator Insp,Repair & Restoration Program Presentation to Nrc ML20058K4121990-06-30030 June 1990 Status Rept,Indian Point Unit 2 Mid-Cycle Steam Generator Insp Presentation to Nrc ML20043A4891990-05-30030 May 1990 Nonproprietary Indian Point Unit 2 Steam Generator Insp, Repair & Restoration Program. ML20042F1441989-12-31031 December 1989 New York Power Authority Annual Rept for 1989. W/900430 Ltr ML19332B9371989-11-30030 November 1989 Nonproprietary Info Presented to NRC Re Indian Point Unit 2 Steam Generator Secondary Side Loose Objects. ML19332D6661989-10-31031 October 1989 Nonproprietary Rev 2 to Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept Spring,1989 Outage. ML20247J8161989-07-31031 July 1989 Safety Evaluation for UHS Temp Increase to 95 F at Indian Point Unit 3 ML20248B3171989-06-30030 June 1989 Rev 1 to Nonproprietary WCAP-12294, Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept,Spring 1989 Outage ML20248D3631989-06-30030 June 1989 Rev 1,to Indian Point Unit 3 Reactor Vessel Fluence & Ref Temp PTS Evaluations ML20247N5331989-05-31031 May 1989 Nonproprietary Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept Spring,1989 Outage ML20247J8071989-05-31031 May 1989 Containment Margin Improvement Analysis for Indian Point Unit 3 ML20247G5171989-04-30030 April 1989 Monthly Maint Category I Rept Pages from Monthly Operating Rept for Apr 1989 for Indian Point ML20244C3311989-04-10010 April 1989 Safety Evaluation Supporting Amend 137 to License DPR-26 ML20248F4211989-03-31031 March 1989 NSSS Stretch Rating-3,083.4 Mwt Licensing Rept ML20235V5931989-03-0202 March 1989 Special Rept:During Cycle 6/7 Refueling Outage Scheduled from Feb-May 1989,openings Will Be Made in Plant Penetration Fire Barriers in Order to Install Various Mods. Fire Watches Posted & Fire Detection Tests Completed ML20248F3001988-12-31031 December 1988 10CFR50.59(b) Rept of Changes,Tests & Experiments Completed in 1988 ML20246E2711988-12-31031 December 1988 Con Edison 1988 Annual Rept ML20196D3011988-10-31031 October 1988 Reactor Vessel Matl Surveillance Program for Indian Point Unit 2 Analysis of Capsule V ML20155H2541988-09-30030 September 1988 Rev 2 to Indian Point Unit 2 (NRC Bulletin 88-008 Thermal Stresses in Piping Connected to RCS) Indentification of Unisolable Piping & Determination of Insp Locations ML20154M5661988-08-31031 August 1988 Monthly Operating Rept for Aug 1988 for Indian Point Station Unit 2 ML20154M5691988-07-31031 July 1988 Revised Page to Monthly Operating Rept for Jul 1988 for Indian Point Station Unit 2 ML20151N7881988-07-31031 July 1988 Rev 1 to Charpy Toughness & Brittle Transition Temp Characterization of HAZ High Hardness Zone of Indian Point Unit 2 Steam Generator Girth Weld by Gleeble Weld Thermal Cycle Simulation ML20006B4741988-05-31031 May 1988 Nonproprietary Indian Point Unit 2 Evaluation for Tube Vibration Induced Fatigue. ML20151N7821988-05-31031 May 1988 Fracture Sensitivity Study of Girth Weld 6 Repaired Configuration,Indian Point Unit 2 ML20153F9161988-04-28028 April 1988 Changes,Tests & Experiments - 1986 ML20151T4681988-01-31031 January 1988 Experimental & Finite Element Evaluation of Spent Fuel Rack Damping & Stiffness 1999-02-09
[Table view] |
Text
.
}l
- ,i OPERATING DATA REPORT
{2 DOCKET No. 50-247 44 D/.TE '4/7/R; _
[$,f
M '
TELLi'll0NE (9I4I WII27
$ OPERATING STATUS
< Notes
'a 1. Unit Name: Indian Point Statinn linit #7 February 1985 iI . 2. Reporting Period:
2758 kN 3. Licensed Thermal Power (MWt): '
1013
- 4. Nameplate Rating (Gross MWe): ~
873 .
U Si Design Electrical Rating (Net MWe):
%[N..-
14
- 6. Maximum Dependable Capacity (Gross MWe):
7., Maximum Dependable Capacity (Net MWe):
D 864
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
None. ~
~. __. ... .__
gy D- *
- 9. Power Level To which Restricted. lf Any (Net MWe):
b.. ~ 10. Reasons For Restrictions.If Any: Nnna M
U?
4 m .._ _ _ ,,
f; [ ~g =~ w a _.
~%, :: .t
~;
~=M = - "
$p=g7%;b -
~
ig "cm. 2%,^'" . HisMonth C Yr to Date Cumulative T
jd ge.a a. . _ m. . m, u. _
E, ,2,1416 ' ~
93 505' 4- '
~ 0 ~ T11. HoursInReportingPeriod
'672 650.22 1 390.14 62 ns; As -
[$.t . ~
- 12. Number Of Hours Reactor was criticy 16.42 18.42 2 364.12.-
ku -; : 13. Reactor Reserve Shutdown Hours 616.65 1 'na m
~
m nRa tm h :~ ~
- 14. Hours Generator On-Line 0 0 0 f
N
' "15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 1 669 551 56 410 3 628 470 1 154 860' 156 332 845 48 472 476
- 17. Gross Electrical Energy Generated (MWH) ,,,
f.h 509 581 1 112 4R7 46 226 394 .
Y ~-
- 18. Net Electrical Energy Generated (MWH)
W .6 94.2 6?.3
~
!! E. - l 9.1 Unit Serdee Factor..
91_R 94.2~ - 64.3 C ?" - ~ J : 20. Unit Availability Factor 57_5
- 87.8 90.9 ,
- 28. Unit Capacity Factor (Using MDC Net) 86.9 -90.0 -56.6
- 22. Unit Capacity Factor IUsing DER Net) h(I "
}3. Unit Forced Outage Rate U.
- 24. Shutdowns Scheduled Oser Ne.st 6 Months (Type.Date.and Duration of Eachl:
5.8 9.6 ii^m
]} .g.
! d, . 25. If Shut Down At Ehd Of Report Period. Estimated Date of Senatup:
- 26. Units in Test Status tPrior to Commercial Operation): Forecast' Achiesed D] INITIAL CRITICALITY N/ N/A N/A N/A M] .
INITIAL. ELFCTRICI TY N/A N/A S' COMMl?RCIAL OPI' RATION d
l.k 0504030170 859321 PDR ADOCK 05000247 PDR
, (9/771 p
ihit -
kt.
i g..
.l AVERAGE DAILY uni! POWER LEVEL il .
3 1
l DOCKET NO. O 247 4
$ WIT IP thit tb. 2 DATE 3/7/85 6
COMPLETED BY M. Blatt TELEPflONE I4} bI 1
Febnary,1985
,1 - MONTH DAY AVERAGE DAILY POWER LEVEL . DAY AVERAGE DAILY POWER LEVEL
!We-Net) (MWe Net)
A '
j I. ., r I7 0 855 2 ,,
liy 3 0
19 853 h 487 4 20 855 f 5 E 21 E
802 853 4 6 ~ 22 0! 854 856 ,
~ ~~
7 _:. 23 852 854 s . 24
!).
9 856 852 25 h 853 856 -
p.! 10 26 Ij i! E 27 E l 12 853
- 28
~
, 13 29 d 14 854 ; 30 is 852 -
- 31
); 851
, 16 2 s N'
T.;
INS 1RUC110NS .
f On this format. list the average daily unit power IcvelI...MWe. Net for each day in the reporting month. Compute o
] ,
the nearest whole megawatt. e a
b n (9/77)
II '
j y
o 1
3' . . . ... . . . _ ..
lMwe,wh.r.wsM& A~ aLLwh
,m
' " :E d U A M * ' - %4M
- '*2,'"'3 f.' o,
' *c^ k*. . , _ . .%.he.,
-A hh ms.c.= w ..w www -
50-247 DOCKET NO.
UNIT SilUTDOWNS AND POWER REDUCTIONS IP thit tb. 2
, UNIT NAME I DATE 3/7/85 COMPLETED BY M. Blatt REPORT MONTil' Fetruarv.1935 TELEPilONE (914I W Al?7
- E e .
-., .5? 3 $ .Y 5 Licensee [g
-g'g K Cause & Corrective No. Date F
g 3g f5 5
5
.355 5 ;5j c e
Event Report # mO Q uo Action to Present Recurrence 6
1 850202 F 46.22 A 2 HA xxxxxxx Gmerator Hydrogen Seal Oil Leak 2 850204 F 9.13 A 3 ,
01 ~ Ptmp XX B Tripped on High Pressurizer Pressure due to loss of 22 IEFP 9
I 2 3T 4 F: Forced Reason: ' Methml: Exlubit G Instructions S: Scheduled A 1:quipment Failure (Explain) I I-Manual for Preparation of Data B Maintenance of Test i 2-Manual Scram. Entry Sheets for Licensee C Refueling i 3 Automatic Scram. Event Repor (LERI FileINUREG-D Regulatory Restriction 4-Other (Explain) 0161)
E Operator Training & License Examination }
F Administrative 5.
G-Operational Error (Explain) ,
Exhibit 1.Same Source
("!77) II-Other(Explain)
3 Summary of Operating Experience 1
1 February 1985 7
-j A
) .
y 9]
69 Indian Point Unit 2 was operating at 100% reactor power at the beginning 1
of the report period. On Feburary 2, power was reduced and the reactor
'.)b
~
y manually tripped to investigate and correct a problem with the hydrogen j seal oil unit of the main generator. The Unit was returned to service ry y the following day and power gradually brought up to full load conditions.
a; 4
~s y On February 4, No. 22 main boiler feedwater pump tripped automatically 9
+ while the Unit was operating at 100% licensed reactor power. In the q course of reducing power to compensate for the reduction in feedwater
', flow, the reactor tripped on high pressurizer pressure. At the time of
,s d
d the event, the control rods were in the manual mode and the block valves 8, associated with the pressurize power operated relief valves were closed.
h,.
9 d Unit 2 was returned to service on February 5 and on February 6 reactor l
x power was increased to 100%. Full power was maintained for the remainder of the report period except for brief redu7tions on February 13 to 88% to j perform corrective maintenance on the hydrogen recombiners, and on 1
i 3j February 28 to 95% due to a temporary reduction in condenser vacuum.
L.
g; l1
MAJOR SAFETY RELATED CORRECTIVE MAINTENANCE MWR NO. SYSTEM COMPONENT DATE WORK PERFORMED 12604 ELEC. #21 Emergency 2/19/85 Replaced and
- Diesel Generator set air com-4 pressor pressure
] switch.
} 18550 ELEC. #21 Emergency 2/19/85 Replaced sheared j Diesel Generator taper pin, over-I speed trip.
l l 17168 CRD #24 Control Rod 2/27/85 Replaced burned Drive Fan out motor.