ML20100A120

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Feb 1985
ML20100A120
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 02/28/1985
From: Reavis J, Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
NUDOCS 8503250334
Download: ML20100A120 (4)


Text

.

A-f s

.4 L

OPERATING DATA REPORT DOCKET NO.

50-413 DATE' _03-13-s3 C05tPLETED BY _ J. A. Reavis TELEPHONE vna 473-7567 OPERATING STATUS

~

Notes

  • Nameplate Rating
1. Unit Name: -

catawba 1;

2. Reporting Period: _ February 1 - February 28. 1985 (Gross MWe) calculated as
3. Licensed Thermal' ower (51Wt):

3411 1450.000 MVA x.90 power P

4. Nameplate Rating (Gross SIWE):

1305 factor per,Page lii,

5. Design Electrical Rating (Net SIWE):

1145 WREG-0020.

- 6. Siaximum Dependable Capacity (Gross 51We):

7. Afaximum Dependable Capacity (Net SIWE):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:

None

' 9. Power Level To which Restricted. If Any (Net 51We):

10. Reasons For Restrictions,If Any:

This 5fonth Yr. to Date Cumulative

11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line 15.- Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (31WH)
17. Gross Electrical Energy Generated (51WH)

Not in Commercial Operation

18. Net Electrical Energy Generated (31WH) l
19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (Using 31DC Net)
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 51onths (Type.Date.and Duration of Eacht:

l l

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status iPrior to Commercial Operation):

Forecast Achiesed l

INITIA L CR,lTICA LITY 01-07-85 j

INITIAL ELECTRICITY 01-22-85 C01151ERCIAL OPERATION 05-85 8503250334 850P28

(*/77)

(DR ADOCM 03000413-r64 Yi

l

~'

~

CATAWFA NUCLEAR STATION.

l-I Pressurizer Power Operated Relief Valvo. (PORV) and Safety Valve Challenges UNIT DATE VALVE # (*)

  1. OF CHALLENGES I

_ March 4, 1985 ISV-7 1

i l

  • S - SAFETY VALVE P - PORV 4

4 e

$N,..

m

+

c -

-CATAWBA = NUCLEAR STATION

", E-Monthly Operating Status Report 1.

- Personnel' Exposure:

- For the month of January,uno'individ'ua'1(s) exceede'd 10 percent of their allowable annual radiation dose limit.

2.

.The total station liquid release for January has been compared

~with.the Technical Specifications maximum annual. dose commitment and~was less than 10 percent of this limit.

The total station gaseous release for January has been compared.

with the Technical Specifications maximum-annual dose commitment and was.less than 10 percent of this-limit.

u I

L,

., = * -

  • e DUKE POWER GOMPANY P.O. DOX 33189 CHARLOTTE N.C. 28242 HALH. TUCKER rer.menown
    • ""4""

March 15, 1985

(*) N"

/

J irector Office of Inspection and Enforcement U. S. Nuclear Regulatory Ccmmission Washington, D. C.

20555 Attention: Document Control Desk Re: Catawba Nuclear Station Docket No. 50-413

Dear Sir:

Please find attached information concerning the performance and operating status of the Catawba Nuclear Station for the month of February 1985.

Very truly yours, lf$

Hal B. Tucker JAR:scs Attachments cc:

Dr. J. Nelson Grace, Regional Administrator American Nuclear Insurers U. S. Nuclear Regulatory Commission c/o Dottie Sherman, ANI Library Region II The Exchange, Suite 245 101 Marietta Street, Suite 2900 270 Farmington Avenue Atlanta, Georgia 30323 Farmington, Connecticut 06032 Mr. Phil Ross Robert Guild, Esq.

U. S. Nuclear Regulatory Commission Attorney-At-Law MNBB-5715 P. O. Box 2097 Washington, D. C.

20555 Charleston, South Carolina 29412 INFO Records Center Palmetto Alliance Suite 1500 2135 Devine Street 1100 Circle 75 Parkway Columbia, South Carolina 29205

' Atlanta, Georgia 30339 NRC Resident Inspector Ms. Judy Dovers Catawba Nuclear Station Nuclear Assurance Corporation 5720 Peachtree Parkway Norcross, Georgia 30092 s

s1

. -.