ML20099L439
| ML20099L439 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 08/07/1984 |
| From: | Tucker H DUKE POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| NUDOCS 8412010126 | |
| Download: ML20099L439 (1) | |
Text
>
DUKE PowEn Gonnar I*.O. Isox 33180 CIIAHLOTTE, N.O. 28242 II AL II. TUCKER Tet.eptions 84"AW15 Fi' 36 m =""
Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission, Region II Suite 2900 101 Mariettu St. NW Atlanta, Gec,rgia 30323
SUBJECT:
McGuire Nuclear Station Docket Nos. 50-369 and 50-370
Dear Mr. O'Reilly:
By letter of April 14, 1984 from H. B. Tucker to J. P. O'Reilly, in response to IE Inapection Report 50-369/83-12 and 50-370/83-16, Duke Power committed to com-plete a revision to the Fire Protection Review (FPR) concurrent with the update of the Final Safety Analysis Report. The updated FSAR is scheduled to be issued in August, 1984. However, a Fire Protection Inspection will be conducted by Region II staff in late September. The possibility exists that items may be identified in this inspection which would necessitate further revision to the FPR. Therefore, it is considered advisable to delay issuance of any revision to the FPR until the results of the inspection are evaluated. This is expected to take about a month. The review and revision to the FPR will be completed by December 1, 1984.
Very truly yours, a.L. k <
[
Hal B. Tucker SAG:glb cc:
Mr. W. T. Orders Senior Resident Inspector McGuire Nuclear Station 8412010126 840007
^
PDR ADOCK 05000369 fgo/ I O