Interim Deficiency Rept DER 84-41 Re Adequacy of Cardinal Industrial Products Program for Supplier Qualification. Initially Reported on 840524.Final Rept Will Be Issued by 841121 Pending Completion of Investigation & Meeting W/Nrc
ML20099L391
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 11/07/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-31083-TDS, DER-84-41, DER-841107, NUDOCS 8412010109
Download: ML20099L391 (2)


Text

-

nk

Meava, i:nc Arizona Nuclear Power Projuct]y !3 jg g g/

P o. box 52034 e PHOENIX, ARIZONA 85072-2034 November 7, 1984 m,,

ANPP-31083-TD's/TRB'.,

U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention:

Mr. T. W. Bishop, Director Division of Reactor Safety and Projects Subj ect:

Time Extension For Report - DER 84-41 A 50.55(e) Potentially Reportable Deficiency Relating To Adequacy Of Cardinal Industrial Products Program For Supplier Qualification.

File: 84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between P. Narbut and T. Bradish on May 24, 1984 (B) ANPP-29809, dated June 22, 1984 (Interim Report)

(C) ANPP-30410, dated August 31, 1984 (Time Extension)

(D) ANPP-30591, dated September 20, 1984 (Interim Report)

(E) Telephone conversation between L. Miller and W. E. Ide on November 2, 1984

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A),

Interim Reports were transmitted by References (B) and (D), and a Time Extension was requested by Reference (C).

Reference (D) estimated that a Final Report would be available by November 9,1984.

Subsequently, Reference (E) was initiated which confirmed a meeting between the NRC and the ANPP, to be held in Walnut Creek, to discuss the applicable issues of this potentially reportable deficiency.

Based on results of the forthcoming meeting and completion of the investi-gation and evaluation, it is expected a Final Report will be issued by November 21, 1984.

Very truly yours

/

h(.

CU.A_.-

4 d L-l.

1 e

8412010109 841107 E. E. Van Brunt, Jr.

PDR ADOCK 05000528 APS Vice President O

Nuclear Production ANPP Project Director i

EEVB/TRB/nj cc:

See Page Two 0

ZE47

e --

]

y

.n

-Mr. T. W. Bishop DER 84-41' Page Two

-cc:

Richard DeYoung. Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 T. G. Woods, Jr.

D. B. Karner W. E. Ide D.' B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler-T. D. Shriver C. N. Russo J. Vorees J. R. Bynum J. M. Allen A. C. Gehr B. S. Kaplan W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson R. P. Zimmerman L. Clyde M. Woods T..J.

Bloom Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339