Provides Info Re Plans & Schedule for Implementing First Two Categories of Improvement,Per Generic Ltr 84-23 Re Reactor Vessel Water Level Instrumentation in Bwrs.Plan & Will Be Provided After Vessel Water Level Study Completed
ML20099L182
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 11/20/1984
From: Gucwa L
GEORGIA POWER CO.
To: Stolz J
Office of Nuclear Reactor Regulation
References
GL-84-23, NED-84-590, TAC-45139, NUDOCS 8412010042
Download: ML20099L182 (1)


Text

Georg a Power Corrpany i 333 P+dmont Asenue l Atlanta. Georg a 30308 Telephone 404 526-6526 l Maeg Address.

Post Off-ce Box 495 At:anta, Georg.a 30302 I Georgia Power L T. Gucwa IIe southevo eWJnc sy stem Manager N.; clear Erg neereg and Chief Nuclear Eng neer NED 84-590 Novenber 20, 1984 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 Division of Licensing U. S. Nuclear Regulatory Cam 11ssion Washington, D. C. 20555 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HA'ICH NUCLEAR PLANT UNITS 1,2

, REACIGR VESSEL WA'IER LEVEL INSTRWENTATION IN BWRs (GENERIC LETTER 84-23)

Gentimen

Generic Letter 84-23 provided the results of the NRC Staff review of the report SLI-8211, " Review of NR Reactor Vessel Water Level Measurenent Systens", which was prepared by S. Levy, Inc. for the WR Owners Group. In the generic letter three potential improvenent categories were identified and BWR licensees were requested to subnit within 30 days their plans and schedule for implementing the first two categories of improvenent. Georgia Power Canpany subnits the following information pursuant to that request.

GPC actively participated in the BWR Owners Group activities related to the reactor vessel water level study, including the discussions between the Owners Group and the NRC Staff. In an effort to address - the areas of concern raised in the Owners Group study, GPC raluested S. Levy, Inc. to perform a plant-specific study of the Hatch Units 1 and 2 reactor vessel water level systens. 'Ihe results of that plant-specific study are in draft form and are presently being reviewed by GPC. Following cmpletion of the

study, a specific plan and schedule for water level systen improvenents will be developed and subnitted to the NRC. This subnittal will be made by May 6, 1985.

Please contact this office if you have any questions.

Yours truly, 2 0

-~

p L. T. Gucwa JH/jh xc: J. T. Beckham, Jr.