ML20099H681

From kanterella
Jump to navigation Jump to search
Forwards Rev 6 to Industrial Security Manual & Rev 5 to Security Force Training & Qualifications Manual.Revs Withheld (Ref 10CFR73.21)
ML20099H681
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 03/12/1985
From: Hintz D
WISCONSIN PUBLIC SERVICE CORP.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
CON-NRC-85-44 NUDOCS 8503190458
Download: ML20099H681 (2)


Text

/

ScErit//Safefu~a'rds NRC-85-44 Information Permanent WISCONSIN PUBLIC SERVICE CORPORATION P.O. Box 1200, Green Bay, WI 54305 Enclosure Contains SAFEGUARDS INFORMATION Upon Separation This Page is Decontrolled March 12, 1985 Mr. J. G. Keppler, Regional Administrator Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137

Dear Mr. Keppler:

Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant Revision to the Kewaunee Industrial Security Manual and the Training and Qualifications Manual Attached please find six (6) copies of revision 6 to the Kewaunee Nuclear Power Plant (KNPP) Industrial Security Manual (ISM) and revision 5 to the KNPP Security Force Training and Qualifications Manual (T&QM).

In general, the ISM has been revised to reflect the current plant and security layout as a result of the construction of the new office / warehouse annex. The ISM has also been revised to clarify the criteria for allowing contractort/

consultants unescorted access to vital areas and to reflect the recent corporate reorganization. The T&QM has been revised to reflect the current shooting range practices regarding weapons qualifications.

A narrative description of the revisions have been included as attachments A and B to this letter to aid your review.

In addition, the affected pages have been incorporated as attachments C and D, with the changes highlighted with revision bars.

WPSC has determined that these changes do not decrease the safeguards effec-tiveness of the Security Manuals and are therefore submitted in accordance with the provisions of 10 CFR 50.54(p).

Please note, however, that 10 CFR 50.54(p) requires that these revisions be furnished to the NRC within two months of th< ir /f,M effective date. As discussed with members of your staff (Mr. Kers), WPSC JEAICA M/

regrets that the revisions regarding the office / warehouse annex are being # Dd -

transmitted to you several weeks late.

ScErtf//Safesuiids gggg 4 h

8503190458 850312 Infonnation. Permanent fDR ADOCK 05000305 oSOOO30506W4 PDR 050oo30566 WG

Mr. J. G. Keppler March 12, 1985 Security /Safeguardi i

. Page 2 Information-Permanent The attachments to this letter contain security safeguards information as defined by 10 CFR 73.21, and therefore shall not be placed in the public docu-ment rooms.

Very truly yours, JM/

D. C. Hintz Manager - Nuclear Power MSL/js

Attach, cc - Mr. Robert Nelson, US NRC (w/o attach.)

Mr. S. A. Varga, US NRC (w/o attach.)

Enclosure Contains SAFEGUARDS INFORMATION Upon Separation This Page is Decontrolled Securityi/Safebcards information Permanent