m-VERMONT YAtKEE MJCLEAR POWER STATION MONTHLY STATISTICAL REPORT 84-10 FOR THE MONTH OF OCTOBER,1984 p'
hkIfhk 0 7
~ '
OPEM TING DATA REPORT Docket No.
50-r..
Date 841110 Completed by F.J. Burger Telephone (802) 257-7711_
OPERATING STATUS Notes:
1.
Unit Name:
Vermont Yankee
~
2.
Reporting Period:
October 3.
Licensed Thermal Power (MWt):
1593
. 4.
Nameplate Rating (Gross MWe):
540 5.
Design Electrical Rating (Net MWe): 514(OC) 504(CC) 6.
Maximum Dependable Capacity (Gross MWe): 535 7.
Maximum Dependable Capacity (Net MWe):
504 8.
If changes occur in capacity ratings (Items Number 3 through 7) since last report, give reasons:
N/A 1
9.
Power level to which restricted,Lif any (Net MWe):
N/A
- 10. Reasons for restrictions, if any:
N/A This month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 745.00 7320.00
- 12. Number of Hours Reactor was Critical 722.12 5651.28 85349.93
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 711.65 5473.49 82966.0/
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thermal Energy Generated (MWH) 1041181.00 8095679.00 120256358.50
- 17. Gross Electrical Energy Generated (MWH) 346564.00 2714878.00 40007956.00
- 18. Net Electrical Energy Generated (MWH) 326312.00 2585992.00 37951008.00
- 19. Unit Service Factor 95.52 74.77 78.14
- 20. Unit Availability Factor 95.52 74.77 78.14
- 21. Unit Capacity Factor (using MDC Net) 86.91-70.09 70.9 2
- 22. Unit Capacity Factor (using DER Net) 85.21 68.73 69.54
- 23. Unit Forced Outage Rate 4.48 9.2C 7.50 i
- 24. Shutdowns scheduled over next 6 months (Type, Date and Duration of Each):
None
- 25. If shut down at end of report period, estimated date of startup:
N/A
- 26. Units in Test Status (prior to commercial operation):
Forecast Achieved Initial Criticality Initial Electricity Commercial Operation MSR.F1
' AVERAGE DAILY-UNIT POWER LEVEL-
- Docket No. 50-271 Unit Vermont Yankee Date 841110
. Completed by F.J. Burger Telephone-(802) 257-7711 MONTH October DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 509 2
157 18 510 3
395 19 509 4
459 20 508 5
49 6 21 502 6
499 22 509 7
489 23 314 8
49 4 24 210 3
t 9
49 2 25 387 10 474 26 364 I
11 491 27 350 i
12 490 28 442 (25 br. day)
I 13 492 29 507 14 487 30 512 15 509 31 512 l
16 508 l
i INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day i.
In the reporting month. Compute to the nearest whole megawatt.
MSR.F2 i
1 l
i i
4 gm y
..r_
3.,
c
.r-r
,. -,+.,,
,c,,,,.,7v.-,-3 m
w,,,,,-.y
,....,,....,,,__,.,,m..
c.,
Docket No. 50-271 Unit vermont Yankee INIT SHUTDOWNS AND POWER REDUCTIONS Date 841110 Completed by F.J. Burger REPORT MONTH October Telephone (802) 257-7711 1
2 3
4 5
No.
Date Typed Duration Reason Method of License System Component Cause and Corrective Action to (hours)
Shutting Down Event Code Code Prevent Recurrenc3 Reactor Report #
84-17 840930 F
33.35 A
1 N/A CD VALV0P Plant shutdown due to slow-(cont)
MSIV closing times caused by galled guide rods on valve actuator. The actuator was re-built and returned to service.
84-18 841023 F
0 A
4 LER EE RELAYX Commenced shutdown because both Power 84-22 emergency diesel generators were Reduction out of service due to failed dif-ferential relays. Relays were repaired and returned to service.
Shutdown terminated.
84-19 941026 F
0 4
4 N/A RB CONROD Power reduction for control rod Power pattern adjustment and other Reduction testing r
1 2
3 4
F-Forced A-Equipment Failure (Explain)
Method Exhibit G - Instructions S-Scheduled B-Maintenance or Test 1-Manual for Preparation of Data Entry C-Refueling 2-Manual Scram Sheets for Licensee Event D-Regulatory Restriction 3-Automatic Scram Report (LER) File (NUREG 0161)
E-uperator Training and License Examination 4-Other (Explain)
F-Administrative 5
G-Operational Error (Explain)
Exhibit I - Same Source H-Other (Explain)
MSR.F3
DockLt No. 50-271 Unit V"rmont Yankee Date 841110 Completed by F.J. Burger-l SAFETY-RELATED MAINTENANCE Telephone (802) 257-7711-EQUIPMENT NATURE OF LER OR OUTAGE MALFUNCTION CORRECTIVE ACTION-MAINTENANCE NUMBER CAUSE RESULT A Diesel Generator Corrective N/A Differential Relay Differential Relay Replaced diode Lockout Circuit MR 84-1968 Diode failure tripped lockout.
Diesel inop.
8 Diesel Generator Corrective LER*
Differential Relay Differential Relay Replaced diode Lockout Circuit
>ft 84-1970 84-22 Diode failure tripped lockout.
Diesel inop.
- Both diesels inop. at the same, time t
9 M5R.F4
Docket No. 50-271 a,-
Unit-Vermont Yankee Date 841110
-Completed by F.J. Burger Telephone (802)257-7711 REPORT MONTH October
SUMMARY
OF OPERATING EXPERIENCES Highlights Vermont Yankee operated at 87.7% of rated thermal power for the month. Gross electrical generation was 346564 MWH or 86.1 % of design electrical e
capacity.
Operating Summary The following is a chronological description of plant operations including other pertinent items of interest for the month:
At the beginning of the reporting period,-the plant was shut down to repair a MSIV valve actuator.
841001 At 2253 hrs. the reactor was critical.
841002 At 0921 hrs. the turbine generator was phased to the grid.
841023 At 0140 hrs. commenced a plant shutdown due to both emergency diesels being out of service.
j 841023 At 1820 hrs. required repairs were completed and a power ascension was initiated.
841026 At 1143 hrs. a power reduction waa initiated for a control rod pattern adjustment and other testing.
4 841026 At 1930 hrs. a return to full power was initiated.
At the end of the reporting period, the plant was operating at 99.8% of rated thermal power.
6 6
4
- y.. -
jy 4
- VERMONT YANKEE NUCLEAR POWER CORPOR ATION P. O. BOX 157 GOVERNOR HUNT ROAD VERNON, VERMONT 05354
.VYV 84-562 November 10, 1984 U. S. Nuclear Regulatory Commission Director, Office of Management Information and Program Control Washington, D.C.
20555 i-
Dear Sir:
Submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of October,1984.
Very truly yours, VERMONT YANKEE NUCLEAR POWER CORPORATION f Liu-h Warren P.
Murphy Vice President end Manager of Operations WPM /FJB/jbA4SR1.1 t?