~O THE CLEVELAND ELECTRIC ILLUMIN ATING COMPAl!Y P.o. Box 5000 - CLEVELAND, OHIO 44101 - TELEPHONE (216) 622-9800 - lLLUMINATING BLOG. - 55 PUBLICSOUARE Serving The Best Location in the Nation MURRAY R. EDELMAN VICE PRESIDENT NUCLEAR October 31, 1984 Mr. James G. Keppler Regional Administrator, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevcit Road ~
Glen Ellyn, Illinois 60137 Re:
Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Fuel Pool Gates Preoperational Test Requirements [RDC 111 (84))
Dear Mr. Keppler:
This letter serves as our ;econd interim report pursuant to 10CFR50.55(e) on the potential significant deficiency regarding Fuel Pool Gates preoperational test requirements not addressed by test specifications.
Mr. J. McCormick-Barger of your office was notified on August 13, 1984, by Mr. B. D. Walrath of The Cleveland Electric Illuminating Company that this problem was being evaluated.
This report contains a description of the deficiency, the corrective action being pursued, and the planned date for our final report.
Description of Deficiency The Gilbert / Commonwealth Inc. (G/C Inc.) test specification did not include a requirement to address acceptance criteria for inspections and tests for the Fuel Pool Gates (sectionalizing devices). The Perry Nuclear Power Plant's (PNPP) Final Safety Analysis Report Table 1.8-1 references Regulatory Guide 1.68, Revision 2-1978, " Initial Test Programs for Water Cooled Nuclear Power Plants." Appendix A, Section M of this Regulatory Guide requires operability and leak tests of sectionalizing devices in the refueling canal and fuel storage pool.
t 8411200511 841031 PDR ADOCK 05000440 S
pop NOV 5 1984 i g SG9
"Mr..Jamc3 G. K pplcr Octcber 31, 1984 Corrective Action Project Organization Observation Action Request P084-65 was issued to track
-resolution of this problem.
In response, a test commitment review has been completed of one-hundred sixty (160) G/C Inc. PNPP test s'pecifications. The documents which were reviewed to ensure address of test commitments included the PNPP Final Safety Analysis Report and the PNPP Safety Evaluation Report and Supplements.
The results of the test commitment review indicated that a total of eleven (11) test specifications were identified as requiring revisions to fully reflect the applicable test commitments. G/C Inc. is developing test specification addenda to correct these deficiencies. Thih action is expected to be completed by November 21, 1984.
Also, in response to Action Request P084-65, G/C Inc. is conducting a technical review to ensure the test specifications are in conformance with the latest design documents and applicable regulatory requirements.
Completion of the second review identified above is expected by January 31, 1985, at which time we will submit our final report on this subject.
Please cali if there acu any additional questions.
Sincerely, fh rue Murray R. Edelman Vice President Nuclear Group MRE:nb DW165/S/2 cc:
Mr. J. A. Grobe USNRC, Site Office Director Of fice of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 U.S. Nuclear Regulatory Commission c/o Document Management Branch Washington, D.C. 20555 Records Center, See-In Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339 m