Forwards Rev 0 to Vol 1 of 10CFR50 App R Rept, Per Util 850227 Commitment.Vol 1 Consists of Introduction & Summary, Description of Fire Areas,Safe Shutdown Analysis,Compliance Summary & Description of Alternative Shutdown Sys
ML20099D520
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 03/08/1985
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, John Miller
Office of Nuclear Reactor Regulation
Shared Package
ML20099D522 List:
References
85-114, NUDOCS 8503130374
Download: ML20099D520 (2)


Text

_

s-MuurL Srrver hhinurQurentssikfartrnerut

~

tkelhskient Itst OfficelknX&tS Nuc6w 42nebns onejar>mmrnaa Rickwumd 1%jnia 23.%1 WI. 771 4 hl March 8, 1985 VNi0hwin P09WR Mr. Harold R. Denton, Director Serial No.85-114 Office of Nuclear Reactor Regulation N0/JDH:pa Attn:

Mr. James R. Miller, Chief Docket Nos. 50-338 Operating Reactors Branch No. 3 50-339 Division of Licensing License Nos. NPF-4 U.S. Nuclear Regulatory Commission NPF-7 Washington, D. C. 20555 Gentlemen:

VIRGINIA POWER NORTH ANNA POWER STATION UNIT NOS. 1 AND 2 7

10 CFR 50 APPENDIX R REANALYSIS The Appendix R reanalysis for the North Anna Power Station consists of two volumes.

Volume I consists of an introduction and summary, description of fire areas, safe shutdown analysis, compliance summary, and description of alternative shutdown systems.

Volume II contains descriptions of modifications and exemption requests. Volume II has already been submitted to you (ref: our May 1, 1984 (Serial No. 231) and October 31, 1984 (Serial No.

231B) letters).

In our July 31, 1984 letter (Serial No. 431), we committed to submit Volume I by February 28, 1985.

However, during our final review of that document, we identified format and editorial concerns that needed to be corrected. Because of its large size, the corrections could not be completed in time to meet the February 28, 1985 commitment.

This matter was discussed with the NRC North Anna Project Manager on February 27, 1985.

At that time, we committed to submit Volume I no later than March 7, 1985.

In fulfillment.of that commit-ment, enclosed are ten copies of the North Anna 10 CFR 50 Appendix R Report, Volume I.

Additional copies are available upon request.

'If you have any questions, or require additional information, please contact us immediately.

V ry truly yours, r

j1 y

t

- -~

f t i/..

GON W. L. Stewart Enclosures b

{ h 38 31 F

l d

s

.a l

i i

I i

O i

cc:

Dr. J. Nelson Crace Regional Administrator r

Mr.'M. W. Branch i

NRC Resident Inspector

}

North Anna Power Station

]

Mr. T. E. Conlon i

NRC Region II t

i Mr. J.'Taylcr, Director j.

Office of Inspection and Enforcement-i l

1 i

7 i

+

1 i

i i

4 i

I, l

f i

i 4

1 4

i P

i i

h i

i j.

i i

i I

f I

+

i..

i I

_.