Interim Deficiency Rept DER 84-53 Re Bonnet & Diaphragm Nuts & Bolts Found Loose on Pc & Ch Valves.Initially Reported on 840817.Due to Extensive Evaluation,Next Rept Delayed Until 841116
ML20099D210
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 11/02/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-31045-TDS, DER-84-53, DER-84-535-TDS, NUDOCS 8411200249
Download: ML20099D210 (2)


Text

r,

.c RECEIVED Unc Arizona Public Service Company.

034 F0V -5 D' 9 08 -

November 2,1984~Gl(IMViF U

ANPP-31045-TDS/LBS U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek,' California 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Reactor Safety and Projects

Subject:

Time Extension For Report - DER 84-53 A 50.55(e) Potentially Reportable Deficiency Relating To Bonnet and Diaphram Nuts And Bolts Found Loose On PC & CH Valves.

File: 84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between P. Narbut and T. Bradish on August 17, 1984 (B) ANPP-30533, dated September 17, 1984 (Interim Report)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B).

At that time, it was estimated that a Final Report would be available by November 2, 1984.

Due to the extensive investigation and evaluation regr. ired, it is now expected that this information will be finalized by November 16, 1984, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours, CLL L Ol N

E. E. Van Brunt, Jr.

APS Vice President Nuclear Production ANPP Project Director EEVB/LBS/nj cc: See Page Two

)

ho O

r S

I O Ed~-)7

$s'

~~

s

.s Mr. T. W. Bishop DER 84-53 Page Two ec:

Richard DeYoung, _ Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 T. G. Woods, Jr.

D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo B. S. Kaplan J. Vorees J. R. Bynum J. M. Allen A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson R. P. Zimmerman L. Clyde M. Woods T. J. Bloom Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339 i

I.

{

i~

[

t k