Forwards Rev 6 to Comanche Peak Steam Electric Station Units 1 & 2 Fire Protection Rept
ML20099C124
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/31/1992
From: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20099C128 List:
References
TXX-92327, NUDOCS 9208030318
Download: ML20099C124 (11)


Text

_ __ __ - - _ - _ _ _ _ - _ - _ _ - _ - . _ _ - _ _ _ _

L WM C -- Log # Txx-92327 L-

-~~'

-.~

File # 10010 cle

~~ ~~

848 Ref. # 10CFR50.48 TUELECTRIC July 31, 1992 William J. Cahill, Jr.

Group "we Presukt U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE Pt J: STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 TRANSMITTAL OF FIRE FROTECTION REPORT, REV15:0N 6 Gentlemen:

TV Electric, the owner of CPSES Units 1 and 2. herewith submits Revision 6 of the CPSES Fire Protection Report.

Er. closed are the f ollowing documents:

Fire Protection Report -

1 signed (and sworn)

Re' vision 6 original and 10 copies A page-by-page description of the changes is attached. The group number assigns a level of significance for each change made to the Fire Protection Report consistent with TV Electric's letter TXX-88467 of June 1, 1988. In addition, all changes have been reviewed under the TV Electric 50.59 process and found not to include any "unreviewed safety questions' Pages which do not have technical changes but are included in the revision (because a change shifted the existing material to another page or because only editorial changes were made to the Fire Protection Report) are not discussed in the cnclosure "CPSES FPR Revision 6 Detailed Description" These chan?es will not adversely affect the ability ti achieve and maintain safe shu+ .an in the event of a fire.

Sincerely.

). s <

l -

William J. Cahill, Jr.

JMK/ds Attachments Enclosures c - Mr. J. L. Milhoan Region IV Resident Irspectors CPSES (2)

Mr (

f(JyQ,J@,.T.A. Bergman,NRR

. B. E. Holian. HRR (3 Copies) 30 P y /

P 400 N. Olive Street L.B. 81 Danas, Texas 11201 DO O O 445 F PDR l

. _ . . - - . . - ~ . - _ -_ - - -

.4+

Attachment 1 to TXX-92327 l Page-1 of l' UNITED FTATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )

)

"exas Utilities Electric Company ) Docket Hos. 50-445 and 50-446

)

(Comanche Peak Steam Electric )

Station.-Units 1 and 2) )

AFFIDAVIT William J. Cahill, Jr. being duly sworn, hereby deposes and says that he is

- Group Vice President. Nuclear of TV Electric, the lead Applicant herein:

that he is duly authorized to sign and file with the Nuclear Regulatory Commission this transmittal of the Fire Protection Report Revision 6: for the captioned facilities; that he is familiar with the content thereof: and that the matters set forth therein are true and correct to the best of his knowledge, information nd belief.

g William J. Cfhill, Jr. [/ '

Group Vice Pre: dent. Nuclear STATE OF TEXAS )

)

COUNTY OF DALLAS- )

Subscribed and sworn to before me, on this 30th day of July, 1992 ,

AnaA?keA tiot Ary P blic '

s

""""' "lllllllll Log # TXX-92327

- 0 File # 10010 clo C C 848 Nef 0 10CFR50.48 nIELECTRIC July 31, 1992 mmam J. c.bm, Jr.

Greap Vice Pmklent U. S. tiuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE FEAK STEAM ELECTRIC STATION (CPSES)

DOCKET N05. 50-445 AND 50-446 TRANSMITTAL OF FIRE PROTECTION REPORT. REVISION 6

-Gentlemen:

TV Electric, the owner of CPSES Units 1 and 2. herewith submits Revision 6 of the CPSES Fire Protection Report.

Enclosed are the following documents:

Fire Pr otection Report -

1 signed (and sworn)

Revision 6 original and 10 copies

-A page-by page description of the changes is attached. The group number assigns a level of significance for_each change made to the Fire Protection Report consistent with TV Electrit*s letter TXX-88467 of June 1, 1988. In addition, all changes have been reviewed under the TV Electric 50.59 process and found not to include any "unreviewed safety questions

  • Pages which do not have technical changes but are included in the revision (because a change shifted the existing material to another page or because only editorial changes were made to the Fire Protection Report) are not

-discussed in the enclosure "CPSES'FPR Revision 6 Detailed Description',

These changes will not adversely af fect the ability to achieve and maintain safe shutdown in the event of a fire.

Sincerely,

/  ;

i -

William J. Cahill, Jr.

JMK/ds Attachments Enclosures c - Mr. J.' L. Milhoan. Region IV Resident Inspectors CPSES (2)

I Mr. T. A. Bergman, NRR QQ(jOdNd.B.E.Holian,NRR(3 Copies) [00g go

/

PD KO O 45 @N.h h MH M% h N F PDR

Attachment 1 to TXX-92327 Page 1 of 1 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )

)

Texas Utilities Electric Company ) Docket Nos. 50-445 and 50-446

)

(Comanche Peak Stean. Electric )

Station. Units 1 and 2) )

AFFLDAVIT William J. Cahill. Jr. being duly sworn, hereby deposes and says that he is Group Vice President, Nuclear of TV Electric, the lead Applicant herein; that he is duly authorized to sign and file with the Nuclear Regulatory Commission this transmittal of the Fire Protect'on Report Revision 6; for the captioned facilities: that he is familiar with the content thereof; and that the matters set forth therein are true and correct to the best of his knowledge, information and belief.

Al . A William J. Cffhill . Jr. V' Group Vice President. Nuclear STATE OF TEXAS )

)

COUNTY OF DALLAS )

Subscribed and sworn to before me, on this 30th day of July, 1992 f

Iloff,/

Notary blic hM '

. - -- =. .-

Attachment 2 to TXX-92327

,- Page.1 of: 9 CPLES FPR REVISION 6 DETAILED DESCRIPTION FPR Page (11 amended) SC9ME Description I-1. 3 2 See Page No(s):06 and 11 Adds dual unit operation in the Fire Protection Report.

Addition:

These changes add Unit 2 Fire Hazards Analysis and associated data.

FPR Change Request Number: FP-92-2.13 Related SER Section: 9.5.1; SSER21 9.5.1 SER/SSER Impact: No I-4, 6 4 See Page No(s):08, 09, 11, 16 and 17 Corrects typographical errors and makes minor editorial changes.

Editorial:

These changes are of editorial nature.

FPR Change Request Number: FP-92-2.0 Related SER Section: 9.5.1: SSER21 9.5.1 SER/SSER Impact: No I-10, 13 4 Adds information for clarity.

Clarification:

These changes are of editorial nature.

FPR Change Request Number: FP-92-2 5 Related SER Section: 9.5.1: SSER21 9.5.1 SER/SSER Impact: No l

)

II-1, 4- 2 See Page No(s):06,07.10,11.16,18,61.62,64,65,71,73, 1 Additional sheets: 74,75,77.79.81.82.88.90,91.93.94,96,  !

98.100-103,108,110.112.113.115.116.117.132,133,137,139, l 140,145.146,192,206.208.211-216 Adds dual Unit operation in the Fire Protection Report. _j Addition: 1 These changes add Unit 2 Fire Hazards Analysis and

-associated data.

FPR Change Request Number: FP-92-2.14 .

Related SER Section: 9.5.1: SSER21 9.5.1 SER/SSER Impact: No 11-2, 4 4 See Page No(s):08.09,12,17.18.19.23.30,32,35,37.38, Additional sheet numbers:40,41,42,45,46.48,50.51,54,56, 61.71,73,74,75.79,82.90.91.93.94,96.98.100,101.102, 108.110.112.113.116.117.133.137,138,140.142.143,145, 146,200.211.212,214.215.216 Adds information for clarity.

L

_ to TXX-92327 Page.2 of 9 CPSES FPR REVISION 6 DETAILED DESCRIPTION FPR Page

( n amended) St9.M2 Description Clarification:

These changes are of editorial nature.

FPR Change Request Number: FP-92 2.6 Related SER Section: 9.5.1: SSER21 9.5.1 SER/SSER Impact: No 11-3, 5 4 See Page No(s):09.16.17,18.37,55,88.93,115.133,137, Additional sheets: 11-139,142,145.147.192,195 and 213 Corrects typographical errors or makes minor editorial changes.

Editorial:

These changes are of editorial nature.

FPR Change Request Number: FP-92-2.1 Related SER Section: 4.5.1: SSER21 9.5.1 SER/SSER Impact: No 11-4, 5 2 See Page No(s):150 thru 191 and 195 Adds Unit 2 Fire Areas and associated information.

Addition:

These changes are to add Unit 2 Fire Hazards Analyses and associated data.

FPR Change Request Number: FP-92-2.11 Related SER Section: 9.5.1: SSER21 9.5.1 SER/SSER Impact: No II-60, 99 2 See Page No(s):113.115.117.119.122.126,127-131,146 Additional sheet: 11-149 Adds Unit 2 specific information to a common Fire area.

Addition:

These changes are to add Unit 2 Fire Hazards Analyses and associated data.

FPR Change Request Number: FP-92-2.12 Related SER Section: 9.5.1: SSER21 9.5.1 SER/SSER 1mpact: No 11-103, 104 3 See Page No(s):105, 106 and 107 Updates actual fire load and fire duration for fire area E0 and within it's fire zones and changes the description / types of combustibles within these fire zones and corrects the square footage of fire area E0.

Update:

Calc. 0210-063-0006 Rev. 4 had incorrect square footage for fire area E0 and the calculation was revised to reflect occupancy changes in the plant. The new actu fire loadings are under the max, permissible for zone.

FPR Change Request Number: FP-92-3,0 Related SER Section 9.5.1: SSER21 9.5.1 SER/SSER Impact: No i

Attachment 2-to TXX-92327

, Page.3 of 9 CPSES FPR REVISfUN 6 UETAtLED DESCRIPTf0N FPR- Page

_(11 amended) SE2M2 Description 11-198. 199 2 Revise items 2 and 3 of section 11-6.2,6 to provide the basis for Unit 2 internal conduit fire seals by taking credit for automatic or manually actuated supp-ression system coverage on both sides of the fire barr-ier in addition to detection system coverage.

Addition:

Manually actuated fire suppression systems are install-ed in both the Units 1 and electrical switchgear ro-oms (83.96,103). These are the only plant areas where the primary fixed fire suppression systems required for separation of redundant safe shutdown cables and comp-onents are manually actuated. in the Unit 1 switchgear rooms. the suppression systte o not provide area-wide coverage and hence are not cte .ted for enabling condu-its penetrating fire barriers associated with these rooms to be sealed on one side (only) of the barrier.

However. in Unit 2. the suppression systems are desig-ned and installed to provide area-wide coverage.

Therefore, in conjunction with the fire detection system coverage, which provides early warning alarm annunciation of a fire in it's incipient stage for app-repriate fire brigade response, the manually actuatad suppression systems installed in the Unit 2 switchgear rooms provide a level of protection commensurate with automatically actuated systems, Based on the equivalent level of protection afforded by the manually actuated systems in Unit 2. conduits penetrating fire barriers associated with the Unit 2 switchgear rooms can be sealed on one side (only) of the barrier with no adverse affect on fire safe shutdown capability.

Additionally, this approach to installing internal conduit fire seals represents cost savings associated with design, installation and long-term surveiilance for approximately 300 fire seals.

FPR Change Request Number: FP-91 2.0 SER/SSER Impact: No II-198. 199 3 Revise items 2 and 3 of section 11-6.2.6 by referring l to Appendix B of the FPR plus FSAR section 9.5.1.6.2. i to provide for future FHA evaluations associated with internal conduit fire seals, Correction:

This change maintains consistency in the FPR text by providing reference to Appendix B for instances where FHA evaluations are used to demonstrate compliance with with BTP APCSB 9.5-1. Appendix A.

FPR Change Request Number: FP-91-2,1 SER/SSER Impact: No

Attachment 2 to TXX-92327

.. Page,4 of 9 CPSES FPR REVISION 6 DETAILED DESCRIPT20N FPR Page (11 Amended) Grevo Description 11-198 3 Adds option for providing gas and smoke seals installed at tne first opening on both sides of the barrier for sealing conduits less than or equal to four inches nominal size in item 2 of section 11-6.2.6.

Addition:

This change maintains consistency between the FSAR and FPR for criteria associated with internal conduit fire seals.

FPR Change Request Number: FP-91-2.2 SER/SSER Impact: No _

11-198 4 Revises paragraph 2 of section 11-6.2.6 to reference Appendix C of the FPR since it contains the deviation evaluations.

Editorial:

This change corrects a typographical error.

FPR Change Request Number: FP-91-2.3 SER/SSER Impact: No III-1. 15 2 See Page No(s):17 and 31 Incorporates Unit 2 program in the Fire Protection Report.

Addition:

These changes are to show Unit 2 applicability based on Unit 2 fire protection calculation.

FPR Change Request Number: FP-92-1.3 Related SER Section: 9.5.1: SSER21 9.5.1 SER/SSER Impact: No III 2, 5 2 See Page No(s):06, 16, 26, 27, 28, 63 and 64 Incorporates Unit 2 program in the Fire protection Report.

Addition:

These changes are to address dual-unit operation and/or to include simultaneous shutdown per Unit 2 Fire Saf.

Shutdown Analysis calculation, j FPR Change Request Number: FP-92-1.5 I Related SER Section: 9.5.1: SSER21 9.5.1 SER/SSER Impact: No III-2. S' 4 See Page No(s):07,08.09.10,12,14-16.21,25,56.58,8%

Corrects typographical errors or makes minor editorial changes.

Editorial:

These changes are of editorial nature.

FPR Change Request Number FP-92-1.0 Related SER Section: 9.5.1: SSEP21 9.5.1 SER/SSER Impact: No

(

_~ . . to TXX-92327 Page S of 9 CPSES FPR REVISION 6 DETAILED DESCRIPTION FPR Page (n ' amended) .Gr_93g Descrietion 111-28 4 Adds information for clarity, Clarification:

These changes are of editorial nature.

FPR Change Request Number: FP-92-1.1 Related SER Section: 9.5.1; SSER21 9.5.1 SER/SSER Impact: No 111-36, 54 2 See Page No(s):58, 62, 64, 65, 66, 67. 80 and 81 Incorporates Unit 2 program in the Fire Protection Report.

Addition:

These changes are to add Unit 2 equipment based on Unit 2 Fire Safe Shutdown Equipment List.

FPR Change Request Number: FP-92-1.4 Related SER Section: 9.5 1: SSER21 9.5.1 SER/SSER Impact: No III-82 3 Adds revised reference list.

Update:

These changes are to incorporate the revised reference list.

FPR Change Request Number: FP-92-1.2 Related SER Section: 9.5.1: SSER21 9.5.1 SER/SSER Impact: No IV-1,.8 2 See Page No(s):10, 13, 14, 15, 17, 18 thru 48 Adds dual Unit operation in the Fire Protection Report.

Addition:

These changes add Unit 2 Fire Hazards Analysis and associated data.

FPR Change Request Number: FP-92-2.15 Related SER Section: 9.5.1: SSER21 9.5.1 SER/SSER 1mpact: No IV-3, 8 4 See P6ge No(s):10, 13, 14 and 17 Corrects typographical errors or makes minor editorial changes.

Editorial:

These changes are of editorial nature. -

FPR Change Request Number: FP 92-2.2 Related SER Section: 9.5.1: SSER21 9.5.1 SER/SSER Impact: No IV-6, 7 4 See Page No(s):11, 12. 18 thru 48 i

Attachme.t 2 to TXX-92327 Page. 6 of 9 CPSES FPR REVISION 6 DETAILED DESCRIPTf0N

-FP2 Page (n amended) Group ggserietion Adds information for clarity.

Clarification:

These changes ars of editorial nature.

FPR Change Request ilumber: FP-92 2.7 Related SER S*: tion: 9.5.1: SSER21 9.5.1 SER/SSEP Imp 6ct: No IV-17 2 Adds Unit 2 Fire Areas and associctt' iriormation.

Addition:

These changes are to add Unit 2 Fire Hazards Analyses and associated data.

FPR Chere Request Number: FP-92-2.11 Related SER Section: 9.5.1: SSER21 9.5.1 SER/SSER Impact: No V 1. 6 2 See Page No(s):G/

Adds dual Unit operation in the Fire Drotection Leport.

Addition:

These changes add Unit 2 Fire Hararjs Analysis and associated data.

FPR Change Request Number: FF-92-2.16 Related SER Section: 9.5.1: SSER21 9.5.1 SER/SSER Impact: ho V-2. 6 4 Corrects typographical errors or makes minor editorial changes.

Edi tori al :

These changes are of editorial nature.

FPR Change Request Number: FP-92-2.3 Related SER Section: 9.5.1: SSER21 9.5.1 SER/SSER Impact: No V-3 2 Adds Unit 2 specific information-to a common Fire area.

Addition:

These changes are to add Unit 2 Fire Hazards Analyses and associated data. 2 FPR Change Request Number: FP-92-2.12 Related SER Section: 9.5.1: SSER21 9.5.1 l SER/SSER Impact: No V-3 2 Adds Unit 2 specific information to a common Fire area.

Addition:

These changes are to add Unit 2 Fire Hazards Analyses and assoc'inted data.

FPR Change Request Number: FP-92-2.20 Related SER Section: 9.5.1: SSER21 9.5.1 SER/SSER Impact: No

}.

l

? Attachment 2 to TXX-92327 99 U

- CPSES FPR REV8510N 6 DETAILED DESCRIPTION l

-FPR Page (11 amended)

Group Descriotian

'V-3, 5 4 See Page No(s):06 Adds information for clarity.

Clarification:

These changes are of editorial nature.

FPR Change Request Number: FP-92-2.8 Related SER Section: 9.5.1: SSER21 9.5.1 SER/SSER Impact: No V4 2 Adds Unit 2 Fire Areas and associated information.

Addition:

These changes are to add Unit 2 Fire Hazards Analyses and associated data.

FPR Change Request Number: FP-92-2.11 Related SER Section: 9.5.1: SSER21 9.5.1 SER/SSER Impact: No V-4 2 Adds Unit 2 Fire Areas and associated information.

Addition:

These changes are to add Unit 2 Fire Hazards Analyses and associated data.

FPR Change Request Number: FP-92-2,21 Related SER Section: 9.5.1: SSER21 9.5.1 SER/SSER Impact: No VB-2, 3 4 Adds information for clarity.

Clarification:

These changes are of editorial nature.

FPR Change Request Number: FP-92-2.9 Related SER Section: 9.5.1: SSER21 9.5.1 SER/SSER Impact: No VB-2. 3 2 See Page No(s):06. 07 and 08 Changes Appendix B of FPR to incorporate provisions for utilizing the criteria and justification of the

" Conduit Fire Protection Research Program" as the basis for internal conduit seal evaluations. Also makes minor editorial corrections to the " FHA Evaluation Matrix".

Addition: j Since the " Conduit Fire Protection Research Dro?rss" used actual fire testing to substantiate it'c concius-ions, incorporation of these results into the CPSES design basis for internal conduit fire seals meets the the guidelines established by Appendix A to GTP APCSB 9.5-1 and Generic Letter 86-10. Additicuolly, the issues identified by NRC Information Notice 88-04 reg-arding substantiation of penetrativ. mal configuration by test are likewise satisfied by the Wisconsin Electr-ic study. Furthermore, the NRC's Safety Evaluation Rep-ort issued on October 23, 1989 in response to Wisconsin

Attachment 2 to TXX-92327 Page 8 of 9 CPSES FPR REVISION 6 DETAILED DESCRIPTION FPR Page (n Amended) Sten Description Electric's submittal of the " Conduit Fire Protection Research Program" provided concurrence with the conclu-sions of the study. Therefore, sufficient regulatory acceptance of the study exists to justify it's incorp-oration into the CPSES design basis. Lastly, reduction of rquired conduit fire seals offers long term cost savings in that actions necessary for surveil',ance are in turn eliminated (ie removal of junction ',ox covers, conduit fittings, etc.).

FPR Change Request Number: FP-91-2.4 SER/SSER Impact: No VB-4, 5 2 Adds dual Unit operation in the Fire Protection Report.

Addition:

These changes add Unit 2 Fire Nazards Analysis and associated data.

FPR Change Request HumL;;': FP-92-2.16 Related SER Section: 9.5.1; SSER21 9.5.1 SER/SSER Impact: No

-V App. C-i 2 See Page No(s):la shts 1-4, Ib(2) shts 1-3, Additional sheets: 3a(2) shts 1-3, 3a-1(2) shts 1-4, 3b(2) shts 1-3, 3d(2) shts 1 5. 3e(2) shts 1-4, 3g(2) shts 1-5, 3ha(2) shts 1-2,3hb(2) shts 1-2, 4a(2) sht 1, 4a 1(2) shts 1-6, 8b sht 1, 8c(2) shts 1-4,10 sht 1 Adds dual unit operation in the Fire Protection Report.

Additien:

These changes add Unit 2 Fire Ha ards Analysis and associated data.

FPR Change Request Number: FP-92-2.17 l Related SER Section: ?.5.1: SSER21 9.5.1 SER/SSER Impact: No Table V App. C-3d 4 Corrects typographical errors or makes minor editorial changes.

Editorial:

L These changes are of editorial nature.

FPR Change Request Number: FP-92-2.4 L Related SER Section: 9.5.1: SSER21 9.5.1 SER/SSER Impact: No l V App. C-3h 4 See Page No(s):01-03,8b Shts 1&2.10 Sht 1.14 Sht 1 Adds information for clarity.

Clarification:

These changes are of editorial nature.

FPR Change Request Numoer: FP-92-2.10 l Related SER Section: 9.5.1: SSER21 9.5.1 SER/SSER Impact: No

. Attachment 2 to TXX-92327

.Pa,gg 9 of 9 CPSES FPR REVISION 6 DETAILED DESCRIPTION

.FPR Page (11 AnfEdtd) fiL9RD DALEiption V App C-Bb 4 See Page Ho(s):01, 10 sht 1 Corrects typographical errors or makes minor editorial changes.

Editorial:

These changes are of editorial nature FPR Change Request Number: FP-92-2.19 Related SER Section: 9.5.1: SSER21 9.5.1 3ER/SSER Impact: No Figure FPR-25 2 See Sheet No(s):01 & 02, FPR-26 shts 1 & 2. -

Additional Figures: FPR-27 shts 1 & 2. FPR-28, FPR- 29 shts 1 & 2, FPR-30 shts 1 & 2 FPR-31, FPR-32, FPR-33 FPR-34 shts 1 & 2, FPR-35 Adds Unit 2 FHA figures in Section V Appendix 0 of the Fire Protection Report.

Addition:

These changes add Unit 2 Fire Hazards Analysis and associated data.

FPR Change Request Number: FP-92-2.18 Related SER Section: 9.5.1: SSER21 9.5.1 SER/SSER Impact: No